Innovating Works

SWEDAVIA AB

A stranger
PJ37-W3 ITARO: INTEGRATED TMA AIRPORT AND RUNWAY OPERATIONS SWEDAVIA AB participó en un H2020 H2020-SESAR-2020-2 "The future of aviation will have to be focused more and more around an environmentally sustainable improvement of aviation. This proposal c...
2020-12-21 - 2023-06-30 | financed
ALBATROSS: ALBATROSS The most energy efficient flying bird SWEDAVIA AB participó en un H2020 H2020-SESAR-2020-1 Mobility and transportation are at the heart of our society which facilitate access to jobs, goods and services. And because air travel is o...
2020-12-11 - 2023-05-31 | financed
VLD3-W2 SORT: Safely Optimized Runway Throughput SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 The expected rapid growth in air traffic will lead to an increasing number of capacity constrained airports. Therefore airports have to impr...
2020-06-16 - 2023-06-30 | financed
PJ02-W2 AART: Airport airside and runway throughput SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 To improve the efficiency and resilience of arrival and departure operations at capacity constrained airports and access to secondary airpor...
2019-11-29 - 2023-06-30 | financed
PJ05-W2 DTT: PJ05 W2 Digital Technologies for Tower SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 "PJ.05-W2 Digital technologies for Tower - SESAR-IR-VLD-WAVE2-05-2019 deals with two main technical work packages: WP2: ""Multiple Remote To...
2019-11-26 - 2023-03-31 | financed
PJ01-W2 EAD: PJ01 Wave 2 Enhanced Arrivals and Departures SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 In order to meet the forecast traffic growth, and in particular to address the performance issues encountered in summer 2018, PJ01-W2 will d...
2019-11-25 - 2023-06-30 | financed
PJ07-W2 OAUO: SESAR2020 PJ07 W2 OAUO Optimised Airspace Users Operations SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 The PJ07-W2 Optimised Airspace Users Operations (OAUO) aims at defining and validating improved Airspace Users processes and tools related t...
2019-11-21 - 2023-06-30 | financed
PJ20-W2 AMPLE: PJ.20 W2 Master Planning SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 PJ20 W2 Master Planning project is the continuation of the SESAR2020 Wave 1 PJ20 ATM Master Plan Maintenance project (AMPLE). Within the Si...
2019-11-18 - 2023-06-30 | financed
PJ04-W2 TAM: PJ04 W2 Total Airport Management SWEDAVIA AB participó en un H2020 H2020-SESAR-2019-1 The need for European airports to become more operationally efficient is fundamental as Airport Council International forecasts that passeng...
2019-11-18 - 2023-06-30 | financed
PJ25 XSTREAM: Cross Border SESAR Trials for Enhanced Arrival Management SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handl...
2016-12-01 - 2019-12-31 | financed
PJ03a SUMO: Integrated Surface Management SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Val...
2016-11-23 - 2019-12-31 | financed
PJ04 TAM: Total Airport Management SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 " Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinf...
2016-11-23 - 2019-12-31 | financed
PJ02 EARTH: Increased Runway and Airport Throughput SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 EUROCONTROL’s 2013 Challenges of Growth Report by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours pe...
2016-11-22 - 2020-03-31 | financed
PJ05 Remote Tower: Remote Tower for Multiple Airports SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 "Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA...
2016-10-31 - 2019-11-30 | financed
PJ03b SAFE: Airport Safety Nets SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety...
2016-10-27 - 2019-12-31 | financed
PJ20 AMPLE: Master Plan Maintenance SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and...
2016-10-27 - 2019-12-31 | financed
PJ09 DCB: Advanced DCB SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 The S2020 project PJ09 Advanced DCB evolves the existing DCB process to a powerful distributed network management function which takes full...
2016-10-25 - 2019-12-31 | financed
PJ24 NCM: PJ24 VLD Network Collaborative Management SWEDAVIA AB participó en un H2020 H2020-SESAR-2015-2 The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace...
2016-10-21 - 2019-12-31 | financed
MASCA: MAnaging System Change in Aviation SWEDAVIA AB participó en un FP7 In response to the FP 7 Transport Call 3, AREA 7.1.4.3. (Air Transport system operational cost), Topic AAT.2010.4.3-4. (Human factors), MASC...
financed
PROSPERO: PROactive Safety PERformance for Operations SWEDAVIA AB participó en un FP7 Whilst a vision of zero deaths for air travel may seem unattainable it could be the goal of all involved in air traffic systems (ATS.) To ge...
financed
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.