Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are still separated processes and the interfaces between ATFCM, ASM and ATC processes and systems require further integration, as well as full collaboration between ATM actors and airspace users. Also, the sharing of airspace information is not optimally adapted to Aircraft Operators (AO) and other Airspace User (AU) processes, which is leading to limited usage of available dynamic configurable airspace. Similarly, the current ATM environment provides neither an accurate prediction of traffic and relevant measurements of its uncertainty nor the sector predicted workload with a confidence index, with which to determine efficient airspace organisation.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 16-04-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are still separated processes and the interfaces between ATFCM, ASM and ATC processes and systems require further integration, as well as full collaboration between ATM actors and airspace users. Also, the sharing of airspace information is not optimally adapted to Aircraft Operators (AO) and other Airspace User (AU) processes, which is leading to limited usage of available dynamic configurable airspace. Similarly, the current ATM environment provides neither an accurate prediction of traffic and relevant measurements of its uncertainty nor the sector predicted workload with a confidence index, with which to determine efficient airspace organisation.

The organisation of resources across Area Control Centres need to be improved as well as the scoping of measures from local level to full network impact assessment, and the promotion of opportunity measures over those with implication on airspace users costs. The operational data shared in the network operations plan (NOP) has to be expanded in scope and time horizon to integrate more tactical... ver más

Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are still separated processes and the interfaces between ATFCM, ASM and ATC processes and systems require further integration, as well as full collaboration between ATM actors and airspace users. Also, the sharing of airspace information is not optimally adapted to Aircraft Operators (AO) and other Airspace User (AU) processes, which is leading to limited usage of available dynamic configurable airspace. Similarly, the current ATM environment provides neither an accurate prediction of traffic and relevant measurements of its uncertainty nor the sector predicted workload with a confidence index, with which to determine efficient airspace organisation.

The organisation of resources across Area Control Centres need to be improved as well as the scoping of measures from local level to full network impact assessment, and the promotion of opportunity measures over those with implication on airspace users costs. The operational data shared in the network operations plan (NOP) has to be expanded in scope and time horizon to integrate more tactical (real-time) dynamic airspace configuration and Airports data. The relevant information should be accessible to everyone and distributed in a transparent but cohesive way with the aim of ensuring sufficient flexibility in the short term DCB phase and the efficient ATC involvement in the DCB process execution. Accurate traffic prediction has to be made available to all actors concerned (e.g. NM, AUs, ATC) from medium-term planning till execution of the trajectories for managing traffic complexity, solving traffic constraint issues and optimising the performance of the network. Relevant indicators to assess DCB measures and monitor execution against the predicted impact on network performance need to be defined and provided through automated tools enabling what-if and what-else analysis.


Scope:The project ‘Digital Network Management Services’ covers the following candidate SESAR Solutions:

Solution PJ.09-W2-44 Dynamic Airspace Configurations (DAC): The objective of the solution is to improve the use of airspace capacity for both civil and military users by increasing the granularity and the flexibility in the airspace configuration and management within and across ANSPs’ areas of responsibilities. This solution will address the integration of concepts and procedures to allow flexible sectorisation boundaries to be dynamically modified based on demand. This includes potential implications for ATCO licences, international boundaries and potentially IOP and A/G multi-datalink communication capabilities.

Solution PJ.09-W2-45 Enhanced Network Traffic Prediction and shared complexity representation. The solution aims at improving the accuracy of the network manager traffic prediction from medium-term planning phase (D-2) to execution (included), relying in particular on new trajectory management features such as the preliminary FPL. It shall adapt existing methodologies and algorithms for demand prediction and regional complexity assessment.

Solution PJ.09-W2-47 Network optimisation of multiple ATFCM time based measures. The solution aims at improving the efficiency and reducing the adverse impact of multiple regulations affecting the same flight or flows. It explores the relationships between the DCB regulations and their interactions trough the flights to quantify the network effect of those interactions. Key to this solution is to identify and avoid regulations with negative impact on network performance.

Solution PJ.09-W2-48 Digital Integrated Network Management and ATC Planning (INAP). The SESAR solution ‘digital INAP’ aims at filling the gap between the management of traffic flows at network level (dDCB) and the control of flights in individual sectors. The solution develops and integrates local functions and associated tools, roles and responsibilities providing an automated interface between local NM and ATC planning to assist controllers in alleviating traffic complexity, traffic density, and traffic flow problems.

Solution PJ.09-W2-49 Collaborative Network Performance Management. The solution aims at providing a common framework and toolbox to the other solutions and actors, allowing them to assess the Network Performance in the pre-tactical and tactical phases of the Network Management. The solution shall develop transparent and shareable network performance indicators, network state monitoring and prediction to support NMOC supervision and awareness, network performance what-if and what-else capabilities.


Expected Impact:This project will develop solutions that are expected to have a positive impact on the Network improving:

Capacity through a dynamic configuration of airspace responding with flexibility to the Airspace users flight trajectory needsSafety: Improved safety in better anticipating and managing potential overloads;Efficiency thanks to the monitoring of the DCB measures against network performance and the implementation of corrective actionsCost-efficiency: DCB allows improved ATM resource planning and better use of existing capacities leading to reduced ATC and Airport Capacity costs;Predictability: the NOP will provide the planned network situation considering all known constraints and time deviation will be managed by anticipating demand/capacity imbalance detection and improving the implementation of DCB solutions;Flexibility: common awareness to all stakeholders through the NOP and access to opportunities in case of late changes in capacity or demand.
ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are still separated processes and the interfaces between ATFCM, ASM and ATC processes and systems require further integration, as well as full collaboration between ATM actors and airspace users. Also, the sharing of airspace information is not optimally adapted to Aircraft Operators (AO) and other Airspace User (AU) processes, which is leading to limited usage of available dynamic configurable airspace. Similarly, the current ATM environment provides neither an accurate prediction of traffic and relevant measurements of its uncertainty nor the sector predicted workload with a confidence index, with which to determine efficient airspace organisation. Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are still separated processes and the interfaces between ATFCM, ASM and ATC processes and systems require further integration, as well as full collaboration between ATM actors and airspace users. Also, the sharing of airspace information is not optimally adapted to Aircraft Operators (AO) and other Airspace User (AU) processes, which is leading to limited usage of available dynamic configurable airspace. Similarly, the current ATM environment provides neither an accurate prediction of traffic and relevant measurements of its uncertainty nor the sector predicted workload with a confidence index, with which to determine efficient airspace organisation.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
 1.   List of countries and applicable rules for funding: described in Annex A of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
     
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
 
Please note that this Call for Proposals is restricted to the Members of the SJU listed in ADB decision ref. ADB(D)02-2016 dated 9th March 2016 and which signed SJU Membership Agreement ref. SJU/LC/307-CTR.
 
     Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in the SJU Single Programming Document 2019-2021.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5.   Provisions, proposal templates and model grant agreements (MGA):
 
S...
 1.   List of countries and applicable rules for funding: described in Annex A of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
     
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
 
Please note that this Call for Proposals is restricted to the Members of the SJU listed in ADB decision ref. ADB(D)02-2016 dated 9th March 2016 and which signed SJU Membership Agreement ref. SJU/LC/307-CTR.
 
     Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in the SJU Single Programming Document 2019-2021.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5.   Provisions, proposal templates and model grant agreements (MGA):
 
SESAR JU Research and Innovation Action (SESAR-RIA)
- Specific provisions and funding rates are described in the SJU Single Programming Document 2019-2021.
Proposal templates are available after entering the submission tool below. Applicants are invited to fill the Wave 2 STELLAR Initiation Template Excel file that contains a dedicated tab for each Object that characterizes the project.
SESAR JU MGAM - Multi-Beneficiary
H2020 Annotated Grant Agreement
 
6.   Additional provisions:
      Horizon 2020 budget flexibility
      Classified information
      Technology readiness levels (TRL)
 
Due to the existence of other partnering arrangements at the SJU Membership level, applicants are not required to conclude a Consortium Agreement in order to answer to this call, as per Article 24 (2) of the Rules of Participation and SJU Single Programming Document 2019-2021.
 
7.   Open access to research data and specific publications
IR projects and VLD activities under this call for proposals will opt out of the provisions of the H2020 Work Programme 2018-2020 Part 19. General Annexes section L. ‘Conditions related to open access to Research Data’.
Please refer to the SJU Single Programming Document 2019-2021.
 
8.   SJU additional documents
Please read carefully all documents below before the preparation of your application. The key reference documents below set out the purpose and scope of the IR/VLD Wave 2 Call for Proposals and describe the activities that will be implemented via the resulting Grant Agreements as well as the conditions for participation and award.
SJU Single Programming Document 2019-2021
IR/VLD WAVE 2 Call Technical Specifications
Project Handbook (Execution Guidance)
Extended Release Strategy 2018
ATM Master Plan
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-SESAR-2019-1 PJ.09 W2 Digital Network Management Services Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are stil...
Sin info.
SESAR-IR-VLD-WAVE2-01-2019 PJ.19 W2 Content Integration, Performance Management and Business Case Development
en consorcio: Specific Challenge:The research, development and validation activities require guidance and steering to achieve the objectives of the Master...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-IR-VLD-WAVE2-07-2019 PJ.09 W2 Digital Network Management Services
en consorcio: Specific Challenge:Today, air traffic flow and capacity management (ATFCM), airspace management (ASM) and air traffic control (ATC) are stil...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-IR-VLD-WAVE2-09-2019 PJ.18 W2 4D skyways
en consorcio: Specific Challenge:The SESAR concept is based upon the fundamental element of trajectory sharing. The ultimate goal is a trajectory based AT...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-IR-VLD-WAVE2-16-2019 VLD.03 W2 Improving runway throughput in one airport
en consorcio: Specific Challenge:At capacity constrained airports traffic demand for runway operations exceeds the runway capacity. With the growth in air...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-IR-VLD-WAVE2-11-2019 PJ.13 W2 IFR RPAS
en consorcio: Specific Challenge:The number of remotely piloted aircraft systems (RPAS) is continuously increasing and this will imply higher interactions...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de