Innovating Works

SZ DOO

Desconocido
SUNRISE: Strategies and Technologies for United and Resilient Critical Infrastructures and Vital Services in... SLOVENSKE ZELEZNICE DOO participó en un HORIZON EUROPE: HORIZON-CL3-2021-INFRA-01 The COVID-19 pandemic has highlighted the importance of the continuity of vital services, has shown the need to work together for the common...
2022-09-06 - 2025-09-30 | Financiado
PRECINCT: Preparedness and Resilience Enforcement for Critical INfrastructure Cascading Cyberphysical Threats... SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-SU-DS-2018-2019-2020 EU Critical Infrastructures (CIs) are increasingly at risk from cyber-physical attacks and natural hazards. Research and emerging solutions...
2021-04-26 - 2023-09-30 | Financiado
X2Rail-5: Completion of activities for Adaptable Communication Moving Block Fail safe Train Localisation in... SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2020 X2RAIL-5 is the 5th and last proposal of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims...
2020-12-18 - 2023-10-31 | Financiado
CONNECTA-3: CONtributing to Shift2Rail s NExt generation of high Capable and safe TCMS PhAse 3 SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2020 Continuation project of CONNECTA-2 (GA 826098) which targets the high TRL deployment and validation in two relevant laboratory demonstrators...
2020-12-09 - 2023-11-30 | Financiado
X2Rail-4: Advanced signalling and automation system Completion of activities for enhanced automation systems... SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2019 X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continu...
2019-12-19 - 2023-12-31 | Financiado
IN2TRACK2: Research into enhanced track and switch and crossing system 2 SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2018 The IN2TRACK2 proposal addresses the topic of Research into optimised and future railway infrastructure of the 2018 HORIZON 2020 SHIFT2RAIL...
2019-03-14 - 2022-02-28 | Financiado
IN2STEMPO: Innovative Solutions in Future Stations Energy Metering and Power Supply SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2017 Innovative Solutions in Future Stations, Energy Metering and Power Supply (IN2STEMPO) addresses the call S2R-CFM-IP3-01-2017 Smart System En...
2017-08-30 - 2023-03-31 | Financiado
IN2TRACK: Research into enhanced tracks switches and structures SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2016-01 Research into Enhanced Track, Switches and Structure The railway of the future needs to meet the predicted growth in societal demand in te...
2016-08-31 - 2019-04-30 | Financiado
ARCC: Automated Rail Cargo Consortium Rail freight automation research activities to boost levels of qual... SLOVENSKE ZELEZNICE DOO participó en un H2020: H2020-S2RJU-2015-01 The overall aim of this specific Automated Rail Cargo Consortium (ARCC) proposal is to carry out an initial phase of rail freight automation...
2016-08-05 - 2021-04-30 | Financiado
SMART RAIL: Smart Maintenance and Analysis of Transport Infrastructure SLOVENSKE ZELEZNICE DOO participó en un FP7: Europe needs a safe and cost effective transport network to encourage movement of goods and people within the EU and towards major markets i...
Financiado
PUBTRANS4ALL: Public Transportation Accessibility for All SLOVENSKE ZELEZNICE DOO participó en un FP7: Pubtrans4all will develop a prototype vehicle-based boarding assistance system that can be built into new rail vehicles or retrofitted into...
Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.