Advanced signalling and automation system Completion of activities for enhance...
Advanced signalling and automation system Completion of activities for enhanced automation systems train integrity traffic management evolution and smart object controllers
X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonst...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Proyectos interesantes
Skylynx
Upgrading Railways from the Air
71K€
Cerrado
X2Rail-1
Start up activities for Advanced Signalling and Automation S...
18M€
Cerrado
X2RAIL-2
Enhancing railway signalling systems based on train satellit...
13M€
Cerrado
HIGHTS
High precision positioning for cooperative ITS applications
6M€
Cerrado
PERFORMINGRAIL
PERformance based Formal modelling and Optimal tRaffic Manag...
1M€
Cerrado
RAILS
Roadmaps for A.I. integration in the raiL Sector
300K€
Cerrado
Información proyecto X2Rail-4
Duración del proyecto: 48 meses
Fecha Inicio: 2019-12-19
Fecha Fin: 2023-12-31
Líder del proyecto
ALSTOM TRANSPORT SA
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
18M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs):
-Railway line capacity increase (ATO up to GoA4)–TD2.2 (WP3, WP4, WP5): Finalize the activities started in X2Rail-1 by completing the GoA2 Specification. Develop ATO GoA4 prototypes. Integrate and test Obstacle Detection devices and environment sensors in cooperation with IP5 TD5.1.3.
-On-Board Train Integrity–TD2.5 (WP6, WP7): Finalize the activities started in X2Rail-2. Define, develop and test complete On-Board Train Integrity system prototypes able to be applied in every train typology (i.e. Passengers and Freight trains with wired and wireless communication).
-Traffic Management Evolution–TD2.9 (WP8, WP9, WP10): Finalize the activities started in X2Rail-2. Define, develop and test various elements of a Traffic Management System platform. Define and design a communication platform (Integration Layer) using standardized data structures and processes to manage the Communication/Data exchange between different services/clients and supporting TMS applications connected to other multimodal operational systems.
-Smart radio-connected all-in-all wayside objects–TD2.10 (WP11, WP12): Finalize the activities started in X2Rail-1.Develop, implement and validate technical demonstrator. Develop and test prototype providing data exchange between trackside equipment and signalling devices via wireless connection; reduction of required cabling; increase on the availability of Maintenance Data, reduction of maintenance costs; support to preventive maintenance.