Innovating Works

X2Rail-4

Financiado
Advanced signalling and automation system Completion of activities for enhance...
Advanced signalling and automation system Completion of activities for enhanced automation systems train integrity traffic management evolution and smart object controllers X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonst... X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs): -Railway line capacity increase (ATO up to GoA4)–TD2.2 (WP3, WP4, WP5): Finalize the activities started in X2Rail-1 by completing the GoA2 Specification. Develop ATO GoA4 prototypes. Integrate and test Obstacle Detection devices and environment sensors in cooperation with IP5 TD5.1.3. -On-Board Train Integrity–TD2.5 (WP6, WP7): Finalize the activities started in X2Rail-2. Define, develop and test complete On-Board Train Integrity system prototypes able to be applied in every train typology (i.e. Passengers and Freight trains with wired and wireless communication). -Traffic Management Evolution–TD2.9 (WP8, WP9, WP10): Finalize the activities started in X2Rail-2. Define, develop and test various elements of a Traffic Management System platform. Define and design a communication platform (Integration Layer) using standardized data structures and processes to manage the Communication/Data exchange between different services/clients and supporting TMS applications connected to other multimodal operational systems. -Smart radio-connected all-in-all wayside objects–TD2.10 (WP11, WP12): Finalize the activities started in X2Rail-1.Develop, implement and validate technical demonstrator. Develop and test prototype providing data exchange between trackside equipment and signalling devices via wireless connection; reduction of required cabling; increase on the availability of Maintenance Data, reduction of maintenance costs; support to preventive maintenance. ver más
31/12/2023
18M€
Duración del proyecto: 48 meses Fecha Inicio: 2019-12-19
Fecha Fin: 2023-12-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2023-12-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 18M€
Líder del proyecto
ALSTOM TRANSPORT SA No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5