Advanced signalling and automation system Completion of activities for enhance...
Advanced signalling and automation system Completion of activities for enhanced automation systems train integrity traffic management evolution and smart object controllers
X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonst...
X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 Advanced Traffic Management & Control Systems domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs):
-Railway line capacity increase (ATO up to GoA4)–TD2.2 (WP3, WP4, WP5): Finalize the activities started in X2Rail-1 by completing the GoA2 Specification. Develop ATO GoA4 prototypes. Integrate and test Obstacle Detection devices and environment sensors in cooperation with IP5 TD5.1.3.
-On-Board Train Integrity–TD2.5 (WP6, WP7): Finalize the activities started in X2Rail-2. Define, develop and test complete On-Board Train Integrity system prototypes able to be applied in every train typology (i.e. Passengers and Freight trains with wired and wireless communication).
-Traffic Management Evolution–TD2.9 (WP8, WP9, WP10): Finalize the activities started in X2Rail-2. Define, develop and test various elements of a Traffic Management System platform. Define and design a communication platform (Integration Layer) using standardized data structures and processes to manage the Communication/Data exchange between different services/clients and supporting TMS applications connected to other multimodal operational systems.
-Smart radio-connected all-in-all wayside objects–TD2.10 (WP11, WP12): Finalize the activities started in X2Rail-1.Develop, implement and validate technical demonstrator. Develop and test prototype providing data exchange between trackside equipment and signalling devices via wireless connection; reduction of required cabling; increase on the availability of Maintenance Data, reduction of maintenance costs; support to preventive maintenance.ver más
02-11-2024:
Generación Fotovolt...
Se ha cerrado la línea de ayuda pública: Subvenciones destinadas al fomento de la generación fotovoltaica en espacios antropizados en Canarias, 2024
01-11-2024:
ENESA
En las últimas 48 horas el Organismo ENESA ha otorgado 6 concesiones
01-11-2024:
FEGA
En las últimas 48 horas el Organismo FEGA ha otorgado 1667 concesiones
Seleccionando "Aceptar todas las cookies" acepta el uso de cookies para ayudarnos a brindarle una mejor experiencia de usuario y para analizar el uso del sitio web. Al hacer clic en "Ajustar tus preferencias" puede elegir qué cookies permitir. Solo las cookies esenciales son necesarias para el correcto funcionamiento de nuestro sitio web y no se pueden rechazar.
Cookie settings
Nuestro sitio web almacena cuatro tipos de cookies. En cualquier momento puede elegir qué cookies acepta y cuáles rechaza. Puede obtener más información sobre qué son las cookies y qué tipos de cookies almacenamos en nuestra Política de cookies.
Son necesarias por razones técnicas. Sin ellas, este sitio web podría no funcionar correctamente.
Son necesarias para una funcionalidad específica en el sitio web. Sin ellos, algunas características pueden estar deshabilitadas.
Nos permite analizar el uso del sitio web y mejorar la experiencia del visitante.
Nos permite personalizar su experiencia y enviarle contenido y ofertas relevantes, en este sitio web y en otros sitios web.