Innovating Works

CETEST

Desconocido
FP2 - R2DATO: Europe’s Rail Flagship Project 2 - Rail to Digital automated up to autonomous train operation CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un HORIZON EUROPE: HORIZON-ER-JU-2022-01 To meet the increasing demand for transportation of both passengers and freight, FP2-R2DATO will take the advantages of digitalisation and a...
2022-12-21 - 2026-05-31 | Financiado
FP3 - IAM4RAIL: Europe s Rail Flagship Project 3 Holistic and Integrated Asset Management for Europe s RAIL System CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un HORIZON EUROPE: HORIZON-ER-JU-2022-01 The IAM4RAIL project focuses on seven (7) different integrated demonstrators for rail assets which are key for research and innovation (R&I)...
2022-12-15 - 2026-11-30 | Financiado
PINTA3: IP1 Traction TD1 Phase 3 and HVAC TD8 CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2020 This proposal has been developed as the last phase of the work which will be developed within the Technical Demonstrators Traction (TD1.1) a...
2020-12-16 - 2023-05-31 | Financiado
FCH2RAIL: Fuel Cell Hybrid PowerPack for Rail Applications CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-JTI-FCH-2020-1 The main objective of the FCH2RAIL project is to develop, build, test, demonstrate and homologate a scalable, modular and multi-purpose Fuel...
2020-12-10 - 2024-12-31 | Financiado
CONNECTA-3: CONtributing to Shift2Rail s NExt generation of high Capable and safe TCMS PhAse 3 CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2020 Continuation project of CONNECTA-2 (GA 826098) which targets the high TRL deployment and validation in two relevant laboratory demonstrators...
2020-12-09 - 2023-11-30 | Financiado
PIVOT2: Performance Improvement for Vehicles on Track 2 CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2019 PIVOT2 is a continuation of the PIVOT project which was scheduled to finish in September 2019. PIVOT2 will build on the work and concepts of...
2019-12-19 - 2023-06-30 | Financiado
FR8RAIL II: Digitalization and Automation of Freight Rail CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2018 Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by...
2018-12-25 - 2022-12-31 | Financiado
PINTA2: IP1 Traction TD1 and Brakes TD5 Phase 2 CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2018 The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-...
2018-12-19 - 2021-02-28 | Financiado
CONNECTA-2: CONtributing to Shift2Rail s NExt generation of high Capable and safe TCMS. PhAse 2. CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2018 Continuation project of CONNECTA (GA 730539) which targets the implementation and deployment in two laboratory demonstrators (for regional a...
2018-12-19 - 2021-07-31 | Financiado
TEST-inn: TEST INNOVATIVE LOAD APPLICATION MONITORING SYSTEMS CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-CS2-CFP06-2017-01 The objective of this proposal is to overcome the conventional experimental set-up commonly used in structural testing as the proposed for m...
2018-02-19 - 2020-02-29 | Financiado
PIVOT: Performance Improvement for Vehicles on Track CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2017 PIVOT takes the Roll2Rail Lighthouse project and addresses mechanical systems within rail vehicles: Carbodies, Running Gear, Brakes, Entry S...
2017-11-07 - 2019-12-31 | Financiado
TR4EMACS: Flexible Test Rig of Aircraft Control Surfaces powered by EMAs CENTRO DE ENSAYOS Y ANALISIS CETEST SL tramitó un H2020: H2020-CS2-CFP03-2016-01 The objective of this project is the design, manufacture and power on of a flexible and complete test rig for the on ground complete evaluat...
2016-12-22 - 2022-11-30 | Financiado
PINTA: IP1 Traction TD1 and Brakes TD5 Phase 1 CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-S2RJU-2016-01 The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic...
2016-08-04 - 2018-12-31 | Financiado
STARS: Satellite Technology for Advanced Railway Signalling CENTRO DE ENSAYOS Y ANALISIS CETEST SL participó en un H2020: H2020-Galileo-GSA-2014-2015 The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed an...
2015-12-01 - 2018-11-30 | Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.