Innovating Works

PINTA2

Financiado
IP1 Traction TD1 and Brakes TD5 Phase 2
The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems... The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management. PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems. On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion. The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22. ver más
28/02/2021
13M€
Duración del proyecto: 26 meses Fecha Inicio: 2018-12-19
Fecha Fin: 2021-02-28

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2021-02-28
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 13M€
Líder del proyecto
ALSTOM TRANSPORT SA No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5