On-Board Monitoring of In-Service Trains for the Structural Health Monitoring of...
On-Board Monitoring of In-Service Trains for the Structural Health Monitoring of Railway Bridges
Railway systems are expanding rapidly worldwide as a 'green' means of transportation. Such rapid expansion poses a challenge to
guaranteeing safety and ensuring the quality of railway systems. Continuous monitoring of tracks and r...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Proyectos interesantes
PLEC2021-007798
[SMART-BRIDGES] MONITORIZACIÓN INTELIGENTE DEL ESTADO ESTRUC...
144K€
Cerrado
CPP2021-008617
DESARROLLO DE SENSORES DE FIBRA ÓPTICA EMBEBIDOS EN HORMIGÓN...
141K€
Cerrado
FJC2018-038071-I
Application of optic sensors in the structural health monito...
50K€
Cerrado
RTC-2016-5164-8
Desarrollo de un KIT Autoinstalable de Monitorización Estruc...
178K€
Cerrado
BIA2009-08012
OBSERVATORIO DE PUENTES DE ARCO DE FABRICA. SISTEMA INTEGRAL...
151K€
Cerrado
PID2021-124236OB-C31
ENFOQUE INTERDISCIPLINAR EFICIENTE PARA ANTICIPAR LA PROPAGA...
154K€
Cerrado
Información proyecto OMoRail
Duración del proyecto: 45 meses
Fecha Inicio: 2023-05-11
Fecha Fin: 2027-02-28
Líder del proyecto
POLITECNICO DI MILANO
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
297K€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
Railway systems are expanding rapidly worldwide as a 'green' means of transportation. Such rapid expansion poses a challenge to
guaranteeing safety and ensuring the quality of railway systems. Continuous monitoring of tracks and rail bridges can help diagnose
and prognose damage timely, increasing railway transportation reliability. In this project, we focus on rail bridges, whose condition
assessment traditionally relies on a static network of sensors. Although well-established, this technique lacks portability, entails
considerable cost and effort, and, crucially, inhibits continuous monitoring, as the lifespan of sensors is generally smaller than that of
the bridge. To tackle these limitations, indirect monitoring practices have recently gained attraction. Such methods extract the
dynamic properties of bridges via measurements from traversing vehicles by exploiting the Vehicle-Bridge Interaction (VBI) principle.
This way they offer mobility and lower installation and maintenance costs. However, the majority of studies on indirect monitoring of
bridges focus on highways. Despite the similarities of VBI modelling between highways and railways, distinct differences (e.g., vehicle
and contact models, moving speed, loading patterns) do not allow the direct application of current indirect monitoring methods to
railway bridges. Another challenge is the blurring effect of surface roughness, which, simplistically, is typically considered as known or
is eliminated. To this end, this project proposes a consistent methodology to continuously monitor railway bridges via On-Board
Monitoring of in-service trains, with a simultaneous characterization of the involved roughness profiles. Accordingly, it proposes a
hybrid modelling procedure that considers a VBI model (which represents actual train-bridge systems and considers the roughness of
the involved track system) fused with vibration measurements collected from traversing trains.