Innovating Works
HERA: Hybrid-Electric Regional Architecture DREAM INNOVATION SRL participó en un HORIZON EUROPE: HORIZON-JU-Clean-Aviation-2022-01 HERA will identify and trade-off the concept of a regional aircraft, its key architectures, develop required aircraft-level technologies and...
2022-12-09 - 2026-12-31 | Financiado
AMBER: InnovAtive DeMonstrator for hyBrid-Electric Regional Application DREAM INNOVATION SRL participó en un HORIZON EUROPE: HORIZON-JU-Clean-Aviation-2022-01 Climate change poses an unprecedented challenge on today’s society. Numerous studies highlight the urgent need to decarbonize global industr...
2022-12-09 - 2026-03-31 | Financiado
MYTHOS: Medium-range hybrid low-pollution flexi-fuel/hydrogen sustainable engine DREAM INNOVATION SRL participó en un HORIZON EUROPE: HORIZON-CL5-2022-D5-01 MYTHOS proposes to develop a demonstrated innovative and disruptive design methodology for future short/medium range civil engines capable o...
2022-11-28 - 2026-12-31 | Financiado
CA3ViAR: Composite fan Aerodynamic Aeroelastic and Aeroacoustic VAlidation Rig DREAM INNOVATION SRL participó en un H2020: H2020-CS2-CFP09-2018-02 The main aim of the CA3ViAR project is the design of an Open-Test-Case Fan geometry that will develop instability mechanisms which are repre...
2019-06-25 - 2023-12-31 | Financiado
ESTRO: Experimental and theoretical aSsessmenT of laminaR flow rObusteness at high mach and reynolds number... DREAM INNOVATION SRL participó en un H2020: H2020-CS2-CFP08-2018-01 According to the requirements of the topic JTI-CS2-2018-CFP08-REG-03-01, the proposal ESTRO will produce experimental and numerical data in...
2019-03-05 - 2022-12-31 | Financiado
GUDGET: GUst generators and model DesiGn for transonic wind tunnel tEsTs DREAM INNOVATION SRL participó en un H2020: H2020-CS2-CFP08-2018-01 GUDGET answers the CfP JTI-CS2-2018-CfP08-AIR-01-38 and aims at providing an innovative experimental set-up for the investigation of gust lo...
2019-02-13 - 2023-02-28 | Financiado
PRODIGE: PRediction of aerOdynamics and hinge moment loaDs at hIgh mach and fliGht rEynolds number DREAM INNOVATION SRL participó en un H2020: H2020-CS2-CFP06-2017-01 According to the requirements of the topic, the proposal PRODIGE will produce experimentally accurate loads and hinge moment data at high Ma...
2018-02-08 - 2021-09-30 | Financiado
POLITE: Powered modular Wind Tunnel model for low and high Reynolds tests DREAM INNOVATION SRL participó en un H2020: H2020-CS2-CFP02-2015-01 POLITE answers the CfP JTI-CS2-2015-CFP02-REG-02-02, published in the second batch of the JTI-Cleansky 2. Within the work-package linked to...
2016-12-06 - 2019-12-31 | Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.