Innovating Works
FCH-01-6-2017
FCH-01-6-2017: Large scale demonstration of Hydrogen Refuelling Stations and Fuel Cell Electric Vehicle (FCEV) road vehicles operated in fleet(s)
Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehicles (FCEVs) and Hydrogen Refuelling Stations (HRS) remains well under the level currently experienced with conventional technologies.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 20-04-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehicles (FCEVs) and Hydrogen Refuelling Stations (HRS) remains well under the level currently experienced with conventional technologies.

For FCEVs, the low level of utilisation is defined in terms of limited number of vehicles being in operation in the field and of limited number of kilometres driven per year, thus limiting conditions in usage allowing for a real field experience to be gained.

For HRS, typical utilisation rates are in the range of 5 to 10% on average compared with the 90%+ level encountered in forecourts distributing more conventional fuels. Limitations in improved HRS technology reliability and operations are therefore faced.

This situation is calling for a large scale “market test” with sufficient vehicle numbers per station to generate relevant data based on demonstration of the HRS under high load conditions. Moreover, the project will target a B to B market, gaining experience in higher mileage and more bearable business case for the infrastructure operator. Building on the achievements... ver más

Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehicles (FCEVs) and Hydrogen Refuelling Stations (HRS) remains well under the level currently experienced with conventional technologies.

For FCEVs, the low level of utilisation is defined in terms of limited number of vehicles being in operation in the field and of limited number of kilometres driven per year, thus limiting conditions in usage allowing for a real field experience to be gained.

For HRS, typical utilisation rates are in the range of 5 to 10% on average compared with the 90%+ level encountered in forecourts distributing more conventional fuels. Limitations in improved HRS technology reliability and operations are therefore faced.

This situation is calling for a large scale “market test” with sufficient vehicle numbers per station to generate relevant data based on demonstration of the HRS under high load conditions. Moreover, the project will target a B to B market, gaining experience in higher mileage and more bearable business case for the infrastructure operator. Building on the achievements obtained today through the launch and follow-up operations of large scale FCEVs and HRS demonstration projects [1], it is now necessary to revisit the conditions of such demonstrations in order to allow a pre-commercial evaluation of the FCEVs & HRS technologies.

With respect to the above, consideration to controlled fleets operators can provide such necessary conditions. Fleets of vehicle are also attracting increased attention from public authorities and private stakeholders involved in transport decarbonisation.

[1] Such as the FCH2 JU funded projects HyFive, H2ME and H2ME2 in Europe


Scope:This topic calls for a large scale pre-commercial demonstration project covering of FCEVs and HRSs under high utilization conditions such as those encountered by commercial fleets operators.

Vehicles

For vehicles, the project will consist in identifying at least two operators of commercial fleets of vehicles such as, but not limited to, taxis, light commercial vehicles parcel delivery services but also potentially new mobility services such as car sharing.

The identified fleet operators will cover the roll-out of at least 180 FCEVs in total with a minimum deployment of 60 FCEVs per site / geographical location, in at least 3 sites.

The vehicles can comprise OEM supplied passenger cars and utility vehicles (light duty vans). The FCEVs are expected to be using a fuel cell system as the key power source and 70MPa storage.

The minimum operation for vehicles is 90 000 km per vehicle within the project with annual mileages equal to the average values observed currently for the equivalent vehicles performing comparable services, running on more conventional fuels. Commercial arrangements for extending operations after the end of the project are expected to be provided.

HRS

In this topic, the focus is on demonstrating the feasibility to operate HRS under pre-commercial conditions in terms of utilization rate.

The minimum number of HRS needed to fulfil the H2 demand and the geographical coverage of the FCVs fleet operated at a given location must be considered.

The HRS must be designed to investigate the specific problems arising from the need to provide high volumes of hydrogen per day while offering satisfactory service to HRS customers in terms of refuelling duration per vehicle and availability (back to back refuelling performance).

When addressing the utility vehicle market or local fleets (as is the main intent of this topic), HRS facilities may be located on private grounds, with or without public access. The latter should be favoured, as long as several other customers are identified as long term users of the HRS. Whenever appropriate to the fleet operators, the use of existing HRS, for example HRS being deployed for FCH JU projects, must be considered subject, when required, to the implementation of upgrades designed to bring the performances of the HRS in line with the users' expectations.

The targeted operation for the HRS is at minimum 5 years (operation beyond the project life is expected and should be demonstrated in the proposal).

Safety assessment shall include the social acceptance dimension.

Overall

Measurement, monitoring and evaluation of specific vehicle and fuelling station parameters should be done using methodologies such as those used in current projects funded by the FCH JU1. The project shall prepare for the use of low-carbon hydrogen and aim to reduce the carbon intensity of the hydrogen refuelled by at least 50% on a well-to-wheel basis as compared with new gasoline and diesel vehicles. The results of the CertifHy Project should be taken into account in the analysis of the total well-to-wheel emissions.

A formal, inclusive and creative dissemination programme is required which ensures that the lessons learnt by the project are made available to wider public. In particular, it should be ensured that countries considering development of similar FCEVs/HRS roll-out initiatives should have an easy access to information generated by the consortium.

Proposal may include some provision for funding support to existing HRS upgrades (performance and availability/reliability focus)

Proposers should provide a clear evidence of:

A comprehensive strategy for commercialization, including (novel) ways to attract the customers by appropriate customer value proposition scenarios An evidence of political support for the project together with commitment to further involvement in the roll out must be provided as part of the proposal, through a Letter of Intent Justification of the way in which the project will contribute to de-risking commercialization of FCEVs in Europe A comprehensive business-plan for the project should also form part of the proposal. Where contributions from end users to vehicles’ costs are assumed, this should be clearly indicated in the project proposal The consortium should include vehicle fleet operators, , refuelling infrastructure providers and operators, and other actors as appropriate and relevant to the effective delivery of the programme.

The following TRLs are at least required:

8 for FCEVs at start of project and 8 - 9 at the end 7 for the HRS at start of project and 7 – 8 at the end. Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC), which manages the European hydrogen safety reference database, HIAD (dedicated mailbox [email protected]).

The maximum FCH 2 JU contribution that may be requested is EUR 5 million per project. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.

A maximum of 1 project may be funded under this topic.

Expected duration: 6 years with minimum 4 years of operation


Expected Impact:The learning experience obtained is specifically intended to trigger further technological improvements of both stations and vehicles and to provide the necessary experience and confidence on the part of investors and policy makers in the business plans for the multi-billion euros of investments needed to establish the HRS infrastructure required for mass market roll-out.

Therefore priority will be given to proposals presenting a comprehensive programme to gather new learning from the project in terms of: customer acceptance, techniques for the operation of a station network, business models for national HRS roll-out, FCEV reliability operated at a high mileage level, technology performance (and requirements for improvement, using the HyLights methodology.

Vehicles

At least 80% of the vehicles to be deployed in the project should be designed to meet the requirements resulting from the severity of usage facing the fleets (e.g. availability, durability)

Technical targets for vehicles:

>6,000h vehicle operation lifetime The key power source of vehicles must be a fuel cell system (full traction FCEV) Vehicle range > 500 km Availability >98% (to be measured against available operational time) Tank-to-wheel efficiency >45%, measured in the New European Drive Cycle (NEDC) The funding contribution will not exceed 20 k€ per vehicle.

HRS

Assessment of progress towards overcoming the barriers to the roll-out of FCEVs (it is expected that substantial advances in comparison to the state-of-the-art to five of nine of the issues below will be proposed and trialled in the project):

Quality Assurance issues around hydrogen purity: Progress towards definition of an industry acceptable hydrogen quality compliance system is targeted. Current investigations made at ISO level to be followed. Achieving a high level of availability for HRS: Improvements towards 98% HRS availability Improved efficiency/performance for HRS: level of back to back vehicle performance to be defined as function of the fleet operational constraint Increased availability of hydrogen from renewable sources: level of targeted decarbonization of the hydrogen fuel must be defined according to the national/regional sustainable on-going production roadmap(s) (whenever available.).. Furthermore, HRS are expected to comply with the following requirements:

High capacity HRS facilities are encouraged for fleet refuelling. The minimum refuelling capacity should be 200 kg of daily refuelling capacity for all stations. Back-up solutions to be considered and clearly described. The cost of dispensed hydrogen offered in the project needs to be consistent with the national or regional strategy on hydrogen pricing. Cost improvements due to increased hydrogen production capacity, and especially higher utilization rates of the HRS, is anticipated in the course of the project. On the other hand the efforts required to lower the carbon footprint could offset these improvements. Thus, the target at the pump is fixed at 10€/kg excl. taxes. The fulfilment of the ISO standard 14687-2 is not compulsory for the Hydrogen purity and has to be at least 99.999 % but the actual quality of refuelled hydrogen shall be duly controlled and justified with regards to fuel cells performance preservation.. Vehicle refuelling process must comply with SAE J2601 (2014) and IR communication needs to comply with SAE J 2799. Exceptions may be allowed, if justified by the application.
ver menos

Temáticas Obligatorias del proyecto: Temática principal: Automotive engineering Powertrain Fuel cell technology New industrial value chains

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehicles (FCEVs) and Hydrogen Refuelling Stations (HRS) remains well under the level currently experienced with conventional technologies. Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehicles (FCEVs) and Hydrogen Refuelling Stations (HRS) remains well under the level currently experienced with conventional technologies.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH2 JU Model Grant Agreement
Annotated Model Grant Agreement
 
         6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 
         7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved. See Part L of the General Annexes of the General Work Programme.
 
        8. Additional documents:
FCH2 JU 2017 Work Plan
FCH2 JU Multi Annual Work Plan 
FCH2 JU – Regulation of establishment
Horizon 2020 Regulation of Establishment
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2017-1 Large scale demonstration of Hydrogen Refuelling Stations and Fuel Cell Electric Vehicle (FCEV) road vehicles operated in fleet(s) Specific Challenge:Despite significant improvements achieved over the recent years, the level of utilisation of both Fuel Cell Electric Vehi...
Sin info.
FCH-01-4-2020 Standard Sized FC module for Heavy Duty applications
en consorcio: Specific Challenge:Hydrogen is considered to play an essential role in future zero-emissions Heavy Duty (HD) mobility. There is a growing co...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-8-2020 Scale-up and demonstration of innovative hydrogen compressor technology for full-scale hydrogen refuelling station
en consorcio: Specific Challenge:Hydrogen compression remains a major bottleneck in the development of the refuelling infrastructure for H2 mobility. The...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-5-2020 Demonstration of FC Coaches for regional passenger transport
en consorcio: Specific Challenge:For intercity and long-distance transport of passengers, coaches are used normally. About 20% of all registered buses for...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-3-2020 Liquid Hydrogen on-board storage tanks
en consorcio: Specific Challenge:Commercial trucks, that are responsible for a quarter of road transport CO2 emissions, are particularly sensitive to H2 s...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-1-2020 Development of hydrogen tanks for electric vehicle architectures
en consorcio: Specific Challenge:It is expected that vehicle architectures will change significantly in the next few years due to major trends in the auto...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de