Innovating Works
LC-SC3-NZE-4-2019
LC-SC3-NZE-4-2019: Integrated solutions for flexible operation of fossil fuel power plants through power-to-X-to-power and/or energy storage
Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingly shift their role from providing base-load power to providing fluctuating back-up power (i.e. ramping up and down) in order to control and stabilise the grid. These strong fluctuations result not only in increased wear-and-tear, but (more importantly) also in a lower efficiency and hence higher greenhouse gas emissions per unit of produced electricity. Severe ramping up and down can be limited through load-levelling i.e. storing power during periods of light loading on the system and delivering it during periods of high demand.
Sólo fondo perdido 20M €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 27-08-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingly shift their role from providing base-load power to providing fluctuating back-up power (i.e. ramping up and down) in order to control and stabilise the grid. These strong fluctuations result not only in increased wear-and-tear, but (more importantly) also in a lower efficiency and hence higher greenhouse gas emissions per unit of produced electricity. Severe ramping up and down can be limited through load-levelling i.e. storing power during periods of light loading on the system and delivering it during periods of high demand.


Scope:Validation and pilot demonstration of the integration of energy storage and/or use of excess energy (including via power-to-X-to-power in fossil fuel power plants and showing that EU emission limits for such installations can not only still be met, but that emissions of air pollutants can even be reduced. This could include the enabling of the combustion system to deal with synthetic fuels and/or hydrogen enriched fuels, as well as a better integration of combined production of heat and power i... ver más

Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingly shift their role from providing base-load power to providing fluctuating back-up power (i.e. ramping up and down) in order to control and stabilise the grid. These strong fluctuations result not only in increased wear-and-tear, but (more importantly) also in a lower efficiency and hence higher greenhouse gas emissions per unit of produced electricity. Severe ramping up and down can be limited through load-levelling i.e. storing power during periods of light loading on the system and delivering it during periods of high demand.


Scope:Validation and pilot demonstration of the integration of energy storage and/or use of excess energy (including via power-to-X-to-power in fossil fuel power plants and showing that EU emission limits for such installations can not only still be met, but that emissions of air pollutants can even be reduced. This could include the enabling of the combustion system to deal with synthetic fuels and/or hydrogen enriched fuels, as well as a better integration of combined production of heat and power into the overall system.

Proposals are expected to bring technologies to TRL 6-7 (please see part G of the General Annexes). Technology development has to be complemented by activities to create awareness, gain feedback on societal impact and advancing society’s readiness for the proposed solutions.

The Commission considers that proposals requesting a contribution from the EU in the range of EUR 6 to 10 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:Solutions will contribute to a smart, secure and more resilient power system through the integration of energy storage for the purpose of load levelling in fossil fuel power generation. Results of the project(s) should allow a smoother operation of these plants at optimal efficiency and environmental performance in order to better adapt to an energy systems that will increasingly be dominated by intermittent renewable energy.


Cross-cutting Priorities:Socio-economic science and humanities


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingly shift their role from providing base-load power to providing fluctuating back-up power (i.e. ramping up and down) in order to control and stabilise the grid. These strong fluctuations result not only in increased wear-and-tear, but (more importantly) also in a lower efficiency and hence higher greenhouse gas emissions per unit of produced electricity. Severe ramping up and down can be limited through load-levelling i.e. storing power during periods of light loading on the system and delivering it during periods of high demand. Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingly shift their role from providing base-load power to providing fluctuating back-up power (i.e. ramping up and down) in order to control and stabilise the grid. These strong fluctuations result not only in increased wear-and-tear, but (more importantly) also in a lower efficiency and hence higher greenhouse gas emissions per unit of produced electricity. Severe ramping up and down can be limited through load-levelling i.e. storing power during periods of light loading on the system and delivering it during periods of high demand.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome of evaluation (two-stage call):
For stage 1: maximum 3 months from the deadline for submission.
For stage 2: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Innovation Action:
Specific provisions and funding rates
Standard prop...
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome of evaluation (two-stage call):
For stage 1: maximum 3 months from the deadline for submission.
For stage 2: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
8. Additional documents:
1. Introduction WP 2018-20
10. Secure, clean and efficient energy WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
El presupuesto total de la convocatoria asciende a
Presupuesto total de la convocatoria.
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LC-SC3-2018-2019-2020 Integrated solutions for flexible operation of fossil fuel power plants through power-to-X-to-power and/or energy storage Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingl...
Sin info.
LC-SC3-NZE-6-2020 Smart Cities and Communities
en consorcio:
Cerrada hace 10 meses | Próxima convocatoria prevista para el mes de
LC-SC3-NZE-5-2020 Low carbon industrial production using CCUS
en consorcio: Specific Challenge:CCUS in industrial applications faces significant challenges due to its high cost and the fierce international competitio...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
LC-SC3-NZE-4-2019 Integrated solutions for flexible operation of fossil fuel power plants through power-to-X-to-power and/or energy storage
en consorcio: Specific Challenge:With a growing share of energy produced from renewable resources (RES), fossil fuel power plants will have to increasingl...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-SC3-NZE-5-2019-2020 Low carbon industrial production using CCUS
en consorcio: Specific Challenge:CCUS in industrial applications faces significant challenges due to its high cost and the fierce international competitio...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-SC3-NZE-3-2018 Strategic planning for CCUS development
en consorcio: Specific Challenge:Establishing the necessary infrastructure for safe and cost-effective CO2 transport and storage is of high importance in...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de