Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. Shipping is bound to grow together with global trade and against other sectors decarbonising more quickly. The International Maritime Organisation (IMO) has found that GHG emissions from ships have already increased by 70% since 1990 [33] and the European Commission strategy [34] estimates that without action the global share of shipping's GHG emissions may reach 17% by 2050. IMO has set a 50% reduction target for emissions related to maritime transport by 2050 compared to 2008, and an ambition of full decarbonization by 2100. In this context, the shipping market is forced to identify more sustainable fuels on the route to full decarbonisation and adopt new technologies for on-board energy conversion for all its fields (cargo, passenger ferries, cruise, service/supply vessels…).
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 29-04-2020.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. Shipping is bound to grow together with global trade and against other sectors decarbonising more quickly. The International Maritime Organisation (IMO) has found that GHG emissions from ships have already increased by 70% since 1990 [33] and the European Commission strategy [34] estimates that without action the global share of shipping's GHG emissions may reach 17% by 2050. IMO has set a 50% reduction target for emissions related to maritime transport by 2050 compared to 2008, and an ambition of full decarbonization by 2100. In this context, the shipping market is forced to identify more sustainable fuels on the route to full decarbonisation and adopt new technologies for on-board energy conversion for all its fields (cargo, passenger ferries, cruise, service/supply vessels…).

Hydrogen as a fuel can enable zero-emission shipping in both GHG and pollutant emissions. However, the volumetric energy density of gaseous hydrogen is a limiting factor in terms of range which is critical for several types of ships. Hydrogen in its liq... ver más

Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. Shipping is bound to grow together with global trade and against other sectors decarbonising more quickly. The International Maritime Organisation (IMO) has found that GHG emissions from ships have already increased by 70% since 1990 [33] and the European Commission strategy [34] estimates that without action the global share of shipping's GHG emissions may reach 17% by 2050. IMO has set a 50% reduction target for emissions related to maritime transport by 2050 compared to 2008, and an ambition of full decarbonization by 2100. In this context, the shipping market is forced to identify more sustainable fuels on the route to full decarbonisation and adopt new technologies for on-board energy conversion for all its fields (cargo, passenger ferries, cruise, service/supply vessels…).

Hydrogen as a fuel can enable zero-emission shipping in both GHG and pollutant emissions. However, the volumetric energy density of gaseous hydrogen is a limiting factor in terms of range which is critical for several types of ships. Hydrogen in its liquid form at approx. 20Kelvin (LH2) is a promising solution to address this issue but little knowledge related to the handling and use of LH2 within the shipping sector exists today due to a lack of demonstration projects. In turn, it hampers the progression of its inclusion in relevant regulations. Similarly, managing LH2 within a port environment (where industrial clusters users of hydrogen are often found) is yet to be demonstrated, with its subsequent learnings.

There are currently several challenges associated with using liquid hydrogen as a fuel in shipping:

The total system's energy and power density as well as redundancy should be adequately secured for the specific applications;Not sufficiently mature/developed regulations, codes and standards (RCS), apply currently to hydrogen-related technologies in maritime environment. The time-consuming and ship type specific Alternative Design process may exhibit an unavoidable challenge, as IMO rules are not yet in place;Market deployment, cost reduction strategies (including maintenance for marine environments) leading to viable business models need to be developed;The public domain needs to be addressed, ensuring the acceptance of these new propulsion systems by the shipping industry and public. [33] http://www.imo.org/en/OurWork/Environment/PollutionPrevention/AirPollution/Pages/GHG-Emissions.aspx

[34] https://ec.europa.eu/clima/policies/transport/shipping_en


Scope:The scope of this topic is to develop a prototype of a maritime power system operating on LH2 including bunkering concept with the potential for scaling-up (for larger amount of stored energy in adequacy with a 20 MW system, preferably fuel cell based), ensuring minimisation of hydrogen loss/leakage/boil-off. The system should be capable to deliver to the ship propulsion and/or on-board energy needs. The prototype's scalability needs to be proven ensuring the capability to completely replace prevailing ship propulsion systems.

A reference ship should be selected for the ship’s operational profile, the power/energy requirements and volume/weight constraints defined. A type of ship within an early adopters' segment of maritime transport preferably with potential for extensive use and widespread deployment is recommended, to secure the overall impact of the effort.The proposals should address the following technical components/issues of the prototype system:

LH2 fuel supply/bunkering infrastructure;LH2 storage and distribution in a ship, with a minimum of 1.5 tons of tank capacity;A power system of minimum 2 MW output, preferably based on fuel cell technology; other conventional technology solutions (such as combustion engines) could be offered, but their development is not considered within the scope of the topic and therefore not supported by funding;Evaluate the technical feasibility and the benefit of cogeneration to provide additionally heat to the ship and, if possible tri-generation including cooling;Identify best configuration of electrical architecture for an optimal integration (e.g. AC/DC grids, power management system, batteries, etc…), allowing for hybridizing potential with different combination of fuel cells, batteries, super cap, or combustion engines if desired;The performance, durability and efficiency of the prototype system should be demonstrated according to the operational profiles defined by the reference ship. The project should include an operational/testing period of at least 12 months (including both winter and summer season) and a minimum of 3,000 operational hours. Bunkering to sustain the normal operational profile of the system should be considered;Scalability to suit larger 20 MW applications should be proven at design phase including definition and design of physical on-board integration and interconnection with other main ship’s systems (e.g. fuel, electric, thermal) for the 20 MW scale system with corresponding energy storage requirements. In addition, the project should address the regulatory, economic and societal issues such as:

Address and contribute to develop regulations, codes and standards (RCS) needed for shipping application, including the safety issues related to H2 fuelling protocols/bunkering and the H2 fuel storage;Establish/include a ship design where storage of LH2 is fully integrated into the ship, in order to pave the way for more integrated solutions and contribute to the establishment and further development of maritime rules and guidelines for selected H2 powered vessel design(s) in line with class/flag/port approval requirements;Assess and propose suitable business models, to foster further commercialisation of technical hydrogen solutions both on board the vessel and bunkering/refuelling;Quantify the potential for cost reductions as the hydrogen technologies mature and define the necessary roadmap;Assess the advantages of using hydrogen systems in combination with the liquid hydrogen (LH2) in terms of emission reduction during operation, noise reduction, availability and reliability;Discuss /share experiences with the shipping industry to contribute to raise awareness of the potential of hydrogen-based technology, and accelerate the development of LH2 for different types of ships;Define training requirements for operator and crews. The project should contribute towards the activities of Mission Innovation - Hydrogen Innovation Challenge. Cooperation with entities from Hydrogen Innovation Challenge member countries, which are neither EU Member States nor Horizon 2020 Associated countries, is encouraged (see chapter 3.3 for the list of countries eligible for funding, and point G. International Cooperation).

The project should closely follow the developments in the IGF Code Correspondence Group at the IMO [35], works of the European Sustainable Shipping Forum (Sub-group on alternative fuels) [36] and relevant work of the certification bodies.Finally, the following activities should be also included:

Validate in laboratory system components' performance, durability and efficiency for use profiles defined by reference ship application;Evaluate ship’s performance through two dimensions Least Cost Path (LCP) Analysis: horizontally i.e. spanning the entire lifecycle of the ship and vertically i.e. assessing the overall impact of fuel chain (production, distribution and utilization) for prototype while the LH2 market matures;Evaluate the economics of the proposed solution and lay out a pathway towards a positive business case through the entire value chain;Define a go-to market strategy supported by marine industry and ships operators;Address project’s activities complementing the projects funded under the following calls:Horizon 2020: LC-MG-1.8-2019, “Retrofit Solutions and Next Generation Propulsion for Waterborne Transport” [37];FCH-01-2-2019 “Scaling up and demonstration of a multi-MW Fuel Cell system for shipping” [38]. TRL at start of the project: 5 and TRL at the end of the project: 7.

Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC) dedicated mailbox [email protected] , which manages the European hydrogen safety reference database, HIAD and the Hydrogen Event and Lessons LEarNed database, HELLEN. A draft safety plan at project level should be provided in the proposal and further updated during project implementation (deliverable to be reviewed by the European Hydrogen Safety Panel (EHSP)).

Activities developing test protocols and procedures for the performance and durability assessment of fuel cell components should foresee a collaboration mechanism with JRC (see section 3.2.B "Collaboration with JRC"), in order to support EU-wide harmonisation. Test activities should adopt the already published FCH 2 JU harmonized testing protocols to benchmark performance and quantify progress at programme level.

“CertifHy Green H2“ guarantees of origin should be used through the CertifHy platform39 to ensure that the hydrogen produced and used is of renewable nature.

The maximum FCH 2 JU contribution that may be requested is EUR 8 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.

Expected duration: 5 years (including 12 months of ship operation, all seasons included).

[35] http://www.imo.org/en/MediaCentre/PressBriefings/Pages/28-CCC1IGF.aspx#.XclUo1dKg2w

[36] https://ec.europa.eu/transparency/regexpert/index.cfm?do=groupDetail.groupDetail&groupID=2869

[37] https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/lc-mg-1-8-2019

[38] https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/fch-01-2-2019

[39] https://fch.europa.eu/page/certifhy-designing-first-eu-wide-green-hydrogen-guarantee-origin-new-hydrogen-market


Expected Impact:As the aim of this topic is to develop and demonstrate a prototype of a large hydrogen system capable of providing large autonomy under usual maritime operational conditions, it should prove that the developed technology is viable on-board a given vessel and that the scalability is possible for providing full propulsion and auxiliary loads for ships.

The expected impact should include:

Validating that the power system may reach a durability of 25,000 h (by applying AST protocols);Demonstrating the relevance of LH2 as a solution to decarbonise relevant segments of the shipping sector;Approval of specific ship type following the Alternative Design process, thereby facilitating faster deployment of more ships of same type;Ensuring that appropriate training processes are in place to safety manage LH2 both in a port environment and on a ship;Demonstrating an availability of 97 % for the entire prototype system during operation;Improving environmental performance of waterborne transport towards achieving a goal of low-to-zero-emission;Increasing EU's competitive lead in green shipping technology;Fostering further development of regulations, codes and standards for maritime hydrogen applications;The proposed solution, when implemented in a vessel, should be able to reduce the CO2 and NOx emissions by 90%, compared to incumbent technologies (i.e., heavy fuel oil converted in combustion engines), in a tank to wake perspective. The conditions related to this topic are provided in the chapter 3.3 of the FCH2 JU 2020 Annual Work Plan and in the General Annexes to the Horizon 2020 Work Programme 2018– 2020 which apply mutatis mutandis.


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Decarbonisation in maritime Thermodynamics Propulsion systems engineering Chemical process engineering Boat and yacht construction Shipbuilding and marine equipment manufacturing

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. Shipping is bound to grow together with global trade and against other sectors decarbonising more quickly. The International Maritime Organisation (IMO) has found that GHG emissions from ships have already increased by 70% since 1990 [33] and the European Commission strategy [34] estimates that without action the global share of shipping's GHG emissions may reach 17% by 2050. IMO has set a 50% reduction target for emissions related to maritime transport by 2050 compared to 2008, and an ambition of full decarbonization by 2100. In this context, the shipping market is forced to identify more sustainable fuels on the route to full decarbonisation and adopt new technologies for on-board energy conversion for all its fields (cargo, passenger ferries, cruise, service/supply vessels…). Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. Shipping is bound to grow together with global trade and against other sectors decarbonising more quickly. The International Maritime Organisation (IMO) has found that GHG emissions from ships have already increased by 70% since 1990 [33] and the European Commission strategy [34] estimates that without action the global share of shipping's GHG emissions may reach 17% by 2050. IMO has set a 50% reduction target for emissions related to maritime transport by 2050 compared to 2008, and an ambition of full decarbonization by 2100. In this context, the shipping market is forced to identify more sustainable fuels on the route to full decarbonisation and adopt new technologies for on-board energy conversion for all its fields (cargo, passenger ferries, cruise, service/supply vessels…).
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1.   Eligible countries: described in Annex A of the H2020 main Work Programme.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 main Work Programme.
For some actions, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operation environment and with important involvement from industrial stakeholders and/or end-users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated.
FCH-01-4-2020: Standard Sized FC module for Heavy Duty applications
The maximum FCH 2 JU contribution that may be requested is EUR 7.5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-5-2020: Demonst...
1.   Eligible countries: described in Annex A of the H2020 main Work Programme.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 main Work Programme.
For some actions, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operation environment and with important involvement from industrial stakeholders and/or end-users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated.
FCH-01-4-2020: Standard Sized FC module for Heavy Duty applications
The maximum FCH 2 JU contribution that may be requested is EUR 7.5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-5-2020: Demonstration of FC Coaches for regional passenger transport
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-6-2020: Demonstration of liquid hydrogen as a fuel for segments of the waterborne sector
The maximum FCH 2 JU contribution that may be requested is EUR 8 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-7-2020: Extending the use cases for FC trains through innovative designs and streamlined administrative framework
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-8-2020: Scale-up and demonstration of innovative hydrogen compressor technology for full-scale hydrogen refuelling station
The maximum FCH 2 JU contribution that may be requested is EUR 3 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-5-2020: Underground storage of renewable hydrogen in depleted gas fields and other geological stores
The maximum FCH 2 JU contribution that may be requested is EUR 2.5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-6-2020: Electrolyser module for offshore production of renewable hydrogen
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-7-2020: Cyclic testing of renewable hydrogen storage in a small salt cavern
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-8-2020: Demonstration of large-scale co-electrolysis for the Industrial Power-to-X market
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-9-2020: Fuel cell for prime power in data-centres
The maximum FCH 2 JU contribution that may be requested is EUR 2.5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-03-2-2020: Decarbonising islands using renewable energies and hydrogen - H2 Islands
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
 
     Proposal page limits and layout: Please refer to Part B of the proposal template in the submission tool below.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the H2020 main Work Programme.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
      Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
      Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5.   Proposal templates, evaluation forms and model grant agreements (MGA):
FCH JU Research and Innovation Action (FCH-RIA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
FCH JU Innovation Action (FCH-IA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
FCH JU Coordination and Support Action (FCH-CSA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
 
6.   Additional requirements:
      Horizon 2020 budget flexibility
      Classified information
      Technology readiness levels (TRL)
      Financial support to Third Parties
 
Other conditions: For all actions of the call, the FCH 2 JU will activate the option for EU grants indicated under Article 30.3 of the Model Grant Agreement, regarding the FCH 2 JU’s right to object to transfers or licensing of results.
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
7.   Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the H2020 main Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
8.   Additional documents
FCH JU Work Plan
FCH2 JU Multi Annual Work Plan and its addendum
FCH2 JU – Regulation of establishment
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2020-1 Demonstration of liquid hydrogen as a fuel for segments of the waterborne sector Specific Challenge:Shipping contributes significantly to local air pollution in major harbour areas and around 3% of global CO2 emissions. S...
Sin info.
FCH-01-4-2020 Standard Sized FC module for Heavy Duty applications
en consorcio: Specific Challenge:Hydrogen is considered to play an essential role in future zero-emissions Heavy Duty (HD) mobility. There is a growing co...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-8-2020 Scale-up and demonstration of innovative hydrogen compressor technology for full-scale hydrogen refuelling station
en consorcio: Specific Challenge:Hydrogen compression remains a major bottleneck in the development of the refuelling infrastructure for H2 mobility. The...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-5-2020 Demonstration of FC Coaches for regional passenger transport
en consorcio: Specific Challenge:For intercity and long-distance transport of passengers, coaches are used normally. About 20% of all registered buses for...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-3-2020 Liquid Hydrogen on-board storage tanks
en consorcio: Specific Challenge:Commercial trucks, that are responsible for a quarter of road transport CO2 emissions, are particularly sensitive to H2 s...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-1-2020 Development of hydrogen tanks for electric vehicle architectures
en consorcio: Specific Challenge:It is expected that vehicle architectures will change significantly in the next few years due to major trends in the auto...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de