FCH-02.10-2014: Demonstrating the feasibility of central large scale electrolysers in providing grid services and hydrogen distribution and supply to multiple high value markets
Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the potential and importance of using central large scale electrolysis for provision of grid balancing and energy storage purposes in European regions with increasing share of intermittent renewable energy. Intelligent operation of the electrolyser in periods with excess or lack of renewable electricity production could help balance the grid and store energy.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 06-11-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the potential and importance of using central large scale electrolysis for provision of grid balancing and energy storage purposes in European regions with increasing share of intermittent renewable energy. Intelligent operation of the electrolyser in periods with excess or lack of renewable electricity production could help balance the grid and store energy.

This conceptual use of electrolysis is however faced with several challenges that are to be addressed by large scale demonstration. As for existing technologies such as central power plants the use of electrolysis for provision of grid balancing services alone is not sufficient for a feasible business case. Where power plants needs several electricity production hours per year to supplement grid balancing revenue, electrolysis needs multiple high value markets where the produced hydrogen can be stored, distributed and used. This is in particular of importance if green electrolysis hydrogen is to be cost competitive with central SMR fossil production.  

Recent years of R&... ver más

Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the potential and importance of using central large scale electrolysis for provision of grid balancing and energy storage purposes in European regions with increasing share of intermittent renewable energy. Intelligent operation of the electrolyser in periods with excess or lack of renewable electricity production could help balance the grid and store energy.

This conceptual use of electrolysis is however faced with several challenges that are to be addressed by large scale demonstration. As for existing technologies such as central power plants the use of electrolysis for provision of grid balancing services alone is not sufficient for a feasible business case. Where power plants needs several electricity production hours per year to supplement grid balancing revenue, electrolysis needs multiple high value markets where the produced hydrogen can be stored, distributed and used. This is in particular of importance if green electrolysis hydrogen is to be cost competitive with central SMR fossil production.  

Recent years of R&D have significantly improved the production ramp up and down flexibility of electrolysis technology and improved the scalability from kW to MW size. What is still lacking is large scale infield demonstration as sites where both multiple grid services are required and where hydrogen at the same time can be distributed and offered for multiple high value markets, such as e.g. industrial gases, transport fuel and power-to-gas. Only such applications can provide both the scale for providing grid balancing and reaching cost levels where additional revenue can be generated from hydrogen distribution and sales.   

Little evidence has been gathered yet of the way electrolysers could operate to maximise their benefits to the grid and revenues from hydrogen supply to multiple markets.

This demonstration call seeks proposals which demonstrate state of the art electrolyser technologies providing and receiving revenue by providing these balancing services, whilst distributing (and receiving revenues from) hydrogen for high value markets.

Scope:  The objective of the project is to deploy and monitor state of the art (2015) electrolyser systems and supporting hydrogen distribution and supply systems configured to attract revenues from grid services in addition to providing hydrogen for multiple high value markets.

The scope of the project should include efforts such as:

•             Large scale electrolyser in excess of 1 MW must be tested in order to be in relationship with the grid scale. Power installed should be duly justified along with the advantages offered to the grid and the resulting long term business model

•             This topic focuses on the inclusion of specific improvements of the current SoA related to the electrolyser operation under partial loads, quick response, system for reserve and frequency response services, forecasting models for electricity price and renewable energy production

•             The technology must demonstrate an electricity consumption of 55 - 60 kWh/kgH2; capital cost of 930 EUR/kW for alkaline electrolysers and 1,570 EUR/kWh for PEM electrolysers. Those target costs do not include the specific tailoring of the electrolysis to be compatible with the grid services to be brought

•             Electrolyser system operators will demonstrate that they are able to benefit from grid services revenue streams. Here, the consortium will demonstrate that they are able to obtain these revenues by entering into commercial contracts with the grid operators or utilities who value these services

•             A comprehensive operation plan must be put in place. State of the art electrolysers and downstream systems must be installed and operated for a minimum period of two years

•             Electrolysers systems will demonstrate a sufficient level of responsiveness to meet the requirements of the grid services they will seek to offer (e.g. rapid modulation, rapid start, as required by the services offered to the grid)

•             Proportional scaled hydrogen distribution and supply systems for downstream provision of the produced hydrogen will be valuable strong added value for the proposal, as e.g. innovative hydrogen distribution concepts for industrial gas or transport fuel applications and/or power-to-gas. Correspondingly, the distribution and supply concepts for downstream hydrogen provision should show improvement on scale and current market utilization. In order to the hydrogen to final customers, activities may include the hydrogen distribution and supply systems and market access, such as innovative trailers and filling port and connection concepts at industrial gas customers. Safety of such innovative solutions shall be fully assessed, as part of the project. Additionally local hydrogen pipeline grids or power-to-gas applications can also be included 

A technology neutral approach is envisaged, not precluding any of the different technologies. Furthermore, various technologies may apply in the same project and regulatory regimes, while strongly promoting cross-over learning, which enriches the knowledge obtained, provided sufficient information exchange among participating stakeholders and with the broader community is put in place.

Eligible consortia should reflect the value chain for the business case considered, such as for instance electrolyser and hydrogen technology developers, electricity grid operators, gas companies, HRS network operators, industrial hydrogen customers, utilities and energy companies. Specifically, the partnership must include strong links to:

•             the necessary contractual and commercial expertise to access revenues from the grid services

•             technical expertise for the design, provision and operation of the electrolyser and associated hydrogen distribution and supply technologies

•             market access for downstream provision of hydrogen for high value markets such as industrial gas, transport fuel or power-to-gas

It will be valuable if consortia build upon already feasible business cases, so that potential customers (transport use, industry or utility) do not discontinue the use of the installation after project end, but on the contrary support continued market roll-out efforts.

Expected impact: The proposal is expected to demonstrate in an operational environment state of the art electrolysis technology configured to attract revenues from grid services in addition to providing hydrogen for multiple high value markets.

The consortium will ensure that actions are included in the project in order to generate learning and reach KPI and commercial targets, such as:

•             Confirm and validate feasible operation of large scale central electrolysis, together with the necessary grid interfaces as well as hydrogen distribution and supply systems that captures revenue from balancing services and sale of hydrogen for multiple markets

•             The environmental performance of the system – with a particular attention to the CO2 intensity of the hydrogen produced, which should include an understanding of the CO2 impact of the grid services mode selected and CO2 footprint impact in the addressed hydrogen end-user markets

•             Techno-economic analysis of the performance of these systems

•             Projections of the value and size of the markets addressed by provision of the grid balancing services and supply to multiple hydrogen markets

•             Assessment and operation experience of the contractual and hardware arrangements required to access the balancing services and operate the electrolyser systems

•             Assessment and operation experience, including safety, of the contractual and hardware arrangements required to distribute and supply hydrogen to multiple markets such as industrial gas, transport fuel and/or power-to-gas

•             Assessment of the legislative and RCS implications of these systems and any issues identified in obtaining consents to operate the system

•             Recommendations for policy makers and regulators on measures required to stimulate the market for these systems

Public-facing versions of these ‘lessons learnt’ reports should be prepared and disseminated across Europe and potentially wider


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Hydrogen from renewable energy sources Grid integration and balancing Electrolysers Hydrogen storage and distribution Water electrolysis Renewable electricity Hydrogen refuelling station HRS Hydrogen Infrastructures Hydrogen

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the potential and importance of using central large scale electrolysis for provision of grid balancing and energy storage purposes in European regions with increasing share of intermittent renewable energy. Intelligent operation of the electrolyser in periods with excess or lack of renewable electricity production could help balance the grid and store energy. Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the potential and importance of using central large scale electrolysis for provision of grid balancing and energy storage purposes in European regions with increasing share of intermittent renewable energy. Intelligent operation of the electrolyser in periods with excess or lack of renewable electricity production could help balance the grid and store energy.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Other Information: Expected TRL increasing from at least 5 (technology validated in relevant environment) to minimum 7 (system prototype demonstration in operational environment).
To be eligible for participation a consortium must contain at least one constituent entity of the Industry or Research Grouping.
Indicative funding and number of projects: The maximum FCH 2 JU contribution for this topic varies between EUR 14 million and EUR 16 million depending on the number of projects. This funding can be allocated to one large project including the additional activities suggested under the scope of the topic (hydrogen distribution and supply systems) with a maximum contribution of EUR 14 million. Alternatively, it can be allocated to maximum two smaller projects using different electrolyser technologies or using same technology in two demonstration sites addressing different market schemes, each requesting a maximum contribution of EUR 8 million.
Expected duration: 4 years
Type of action: Innovation Action
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the FCH2 JU Work Plan 2014.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the FCH2 JU Work Plan 2014.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring...
Other Information: Expected TRL increasing from at least 5 (technology validated in relevant environment) to minimum 7 (system prototype demonstration in operational environment).
To be eligible for participation a consortium must contain at least one constituent entity of the Industry or Research Grouping.
Indicative funding and number of projects: The maximum FCH 2 JU contribution for this topic varies between EUR 14 million and EUR 16 million depending on the number of projects. This funding can be allocated to one large project including the additional activities suggested under the scope of the topic (hydrogen distribution and supply systems) with a maximum contribution of EUR 14 million. Alternatively, it can be allocated to maximum two smaller projects using different electrolyser technologies or using same technology in two demonstration sites addressing different market schemes, each requesting a maximum contribution of EUR 8 million.
Expected duration: 4 years
Type of action: Innovation Action
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the FCH2 JU Work Plan 2014.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the FCH2 JU Work Plan 2014.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part E of the General Annexes of the FCH2 JU Work Plan 2014.
3.2 FCH2 Guide for applicants on submission and evaluation
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
Information on the outcome of two-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
FCH2 Innovation Action (FCH2-IA):
Specific provisions and funding rates: described in part D of the General Annexes of the FCH2 JU Work Plan 2014.
Standard proposal template
Standard evaluation form
FCH2 Model Grant Agreement
H2020 Annotated Model Grant Agreement
 
Additional provisions:
Technology readiness levels (TRL): described in part E of the General Annexes of the FCH2 JU Work Plan 2014.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
FCH2 additional documents:
FCH2 JU Vademecum/rules for proposals submission and evaluation
FCH2 JU Work Plan 2014
FCH2 JU Multi Annual Work Plan
FCH2 JU – Regulation of establishment
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2014-1 Demonstrating the feasibility of central large scale electrolysers in providing grid services and hydrogen distribution and supply to multiple high value markets Scope:Specific challenge:          A recent FCH JU “Development of water electrolysis in the European Union” has acknowledged both the poten...
Sin info.
FCH-02.2-2015 Improved electrolysis for Distributed Hydrogen production
en consorcio: Specific Challenge:Implemented energy policies have the objective of producing 65% of electricity from renewable energy sources by 2050, and...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
FCH-02.6-2015 Development of cost effective manufacturing technologies for key components or fuel cell systems
en consorcio: Specific Challenge:Currently most fuel cell systems and key components like stacks, BOP components, system integration, inverter, heat excha...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
FCH-02.1-2015 Improved electrolysis for Off-grid Hydrogen production
en consorcio: Specific Challenge:It is estimated that 1.2 billion people will be without electricity access globally by 2025. A further 1 billion people a...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
FCH-02.3-2015 Development of co-electrolysis using CO2 and water
en consorcio: Specific Challenge:The establishment of the hydrogen economy is constrained by different factors, such as handling and storage. On the other...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
FCH-02.9-2015 Large scale demonstration of µCHP fuel cells
en consorcio: Specific Challenge:According to COM(2015) 80 final, 25/02/2015 on the Energy Union Package, the vision of the Energy Union is a sustainable,...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de