FCH-01-3-2019: Cyber-physical platform for hybrid Fuel Cell systems
Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and systems for all kinds of applications, mobile and stationary. In many of these applications, fuel cell technology is and will be competing with other well-established technologies. The market price, durability and performance of the established technologies (internal combustion engines, gas turbines, partly batteries) have been optimized over many years, so that it is hard to compete with for the rather new fuel cell technology, which is a complex and highly integrated mechatronic and chemical system of systems.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 23-04-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and systems for all kinds of applications, mobile and stationary. In many of these applications, fuel cell technology is and will be competing with other well-established technologies. The market price, durability and performance of the established technologies (internal combustion engines, gas turbines, partly batteries) have been optimized over many years, so that it is hard to compete with for the rather new fuel cell technology, which is a complex and highly integrated mechatronic and chemical system of systems.

Durability and performance, especially for transport applications with high dynamic performance requirements are ‘must-haves’ for fuel cells, and both production and development cost will influence a fast market penetration significantly. To reach these goals, drivetrains are usually an optimized hybrid system composed of a fuel cell system and a battery.

The way and the degree of coupling between batteries and fuel cells is the result of trade-off between autonomy range, weight and costs, and up to now limited ana... ver más

Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and systems for all kinds of applications, mobile and stationary. In many of these applications, fuel cell technology is and will be competing with other well-established technologies. The market price, durability and performance of the established technologies (internal combustion engines, gas turbines, partly batteries) have been optimized over many years, so that it is hard to compete with for the rather new fuel cell technology, which is a complex and highly integrated mechatronic and chemical system of systems.

Durability and performance, especially for transport applications with high dynamic performance requirements are ‘must-haves’ for fuel cells, and both production and development cost will influence a fast market penetration significantly. To reach these goals, drivetrains are usually an optimized hybrid system composed of a fuel cell system and a battery.

The way and the degree of coupling between batteries and fuel cells is the result of trade-off between autonomy range, weight and costs, and up to now limited analysis/development of hybridization strategies has been performed (see example of project SWARM). The development of a model-based tool and its experimental validation for designing a hybrid system in early phases is of particular importance to accelerate the understanding and development of new products. This environment needs to be available soon to enable the European fuel cell industry, in particular the SMEs to develop and optimize fully functional, highly reliable and cost-effective products. Such highly integrated product design and development environment should combine virtual (i.e. simulation based) and physical (i.e. experiment based) aspects seamlessly over the whole development process. For example, numerical/physical models used in the first phase of fuel cell system development have to be continuously replaced by emulators for physical components that do not yet exist and combined with already available real hardware. This versatile mixed virtual / real development environment serves as a basis for control development, pre-calibration, functional and performance optimization and validation, sensitivity analysis etc. throughout the entire development process.


Scope:The overall objective of the topic is to develop a validated fuel cell system model and its hybridization, and use it to assess design-point, part-load, dynamic performance and customized energy management strategies for automotive applications (also using results and data of previous research activities in this area). The proposal should address both numerical development (design and validation of an open-access modelling tool) and technological development (design, achievement and validation of the physical platform) with the following possible and successive steps:

Design of a multi-application physical platform consistent with a wide variety of applications and hybridized architectures;Building and qualification of such a platform and validation of coupling with the open access software to be developed in parallel;Testing and validation of the platform with a real example (e.g. hybridized bus, truck, ship etc.) to validate the robustness of the platform. This step should produce optimised components of the FC system from the preliminary dimensioning steps and then should test them on the platform with operating conditions as close as possible to real operation conditions; some adjustments of both numerical and physical components of the platform might be foreseen. In a first step and with the support/feed-back of an end-user, the most critical issues related to hybridization (e.g. energy management, system and component lifetime etc.) should be identified. The impact of system design and energy demand profile on the system performance, reliability and the durability should also be assessed. This should rely on two aspects:

An open, seamless and highly integrated development platform for fast prototyping described as X-in-the-Loop (XiL) where X stands for model, software or hardware (MiL, SiL or HiL) of complex hybrid FC systems which goes far beyond existing specific simulation and experimental tools. Such a development platform should enable the combination and utilization of best in class or specialized tools, integrate XiL and real-time systems, allow massively parallel simulations and experimental tools for optimization and complex multi-scenario validation, fully support high performance and cloud computing as well as cross-company product validation, based on technologies like co-simulation and experimental testing as a service;Creating a common simulation, experimental and validation platform to exchange code libraries, models and best practices; UML 2.0 standard [1] should be used. Physical based model for lifetime prediction should also be included as well as an off-line (based on on-field data provided by end-users) or on-line (experimental characterisation at approx. 1kWe scale) study of different strategies on the system behaviour. The system definition should start from the stack level to optimize the operating conditions of the fuel cell and to minimize the degradation of the MEAs. Therefore, a hybrid fuel cell system could be developed with a reduced time comparable to development time frames of today’s conventional powertrains and taking into consideration the aspects from the material performance and durability (using experimental and model-based development approaches) and up to the assembly process and control strategies development. The integration and validation of advanced control including physical or signal treatment-based models, specifically for lifetime optimization (as state observers), should be validated both experimentally and in a modular mixed virtual/physical XiL platform. The modularity of this platform should allow the continuously and seamlessly integration of already developed components of the fuel cell system, including controllers, Balance of Plant (BoP) components, power electronics, etc. with the stack, even with different fuel cell system architectures.

Finally, the environment should also allow the consideration and investigation of hybrid systems to optimize the sizing of fuel cell and battery hybrid systems simultaneously within their constraints, including on-line power management strategies.

Real time capability of emulators and related numerical models for the components and the entire environment should be a prerequisite to validate the different algorithms (fuel cell system control and power management) and control strategies.

The increasing complexity of models on various levels (from subcomponent to system-of-systems level) should be approached with automated parameterization functionalities and algorithms, and a seamless switching between real and emulated parts.

Fuel cell technology would profit from such a development platform significantly, as product development and optimization could be performed here “ab initio” on these new standards rather than needing to replace existing classical development routes and in development time frames suitable for typical industrial product cycles in the range of 36 to 60 months.

The XiL platform should be open regarding the interfaces to other third party simulation and testing modules and tools (including co-simulation etc.). The XiL platform should also consider interfaces for future web-based services and data exchange.

It is expected that at least several end-users or vehicle manufacturers to be part of the consortium.

TRL at start: 4-5 and TRL at end: 6.

Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC) dedicated mailbox [email protected], which manages the European hydrogen safety reference database, HIAD and the Hydrogen Event and Lessons LEarNed database, HELLEN.

Test activities should collaborate and use the protocols developed by the JRC Harmonisation Roadmap (see section 3.2.B "Collaboration with JRC – Rolling Plan 2019"), in order to benchmark performance of components and allow for comparison across different projects.

The FCH 2 JU considers that proposals requesting a contribution from the EU of EUR 1.8 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

A maximum of 1 project may be funded under this topic.

Expected duration: 3 years.

[1] UML = Unified Modelling Language


Expected Impact:Expected impacts of the project should include:

Significant reduction of development times from >60 months down to 36 months for new fuel cell – battery hybrid systems;A better understanding of hybridization strategies on the performance, reliability and durability, for reference cases representing typical transport industrial applications. This includes a benchmark of current optimization algorithms (off-line and on-line);The expected tool/platform will be not only a software but an optimized and versatile combination of real or emulated components of the complete FCEV propulsion system (stack and BOP, battery pack, power electronics, electric engine…) associated with XiL open to any users of the value chain from component suppliers to Original Equipment Manufacturers (OEMs) for different transport applications (land, air, water etc.);Development of high-performant real-time BoP-emulators surrogating and realistically emulating the highly dynamic behaviour of real components or sub-systems needed for transport applications;Create a modular open development platform (SiL, MiL, HiL) for hybrid fuel cell systems with integration capabilities for BoP components, controllers, energy management strategies, etc. and corresponding simulation models along with analytical tools and advanced instrumentation to validate the different methodologies developed;Enable multi-tool combinations with massive parallel computing;Exchanging best practicing and harmonizing models and algorithms to optimize hybrid fuel cell system architecture and power management strategies and validation in a XiL platform in order to achieve at least 5,000 h durability, a hydrogen consumption lower than 1.15 kg/100km for fuel cell light duty vehicles and at least 20,000 h durability, a hydrogen consumption lower than 8 kg/100km for large vehicles (bus, trucks, ships, trains);Promote the exchanges and create sound links between software development, software implementation as well as experimental tools and FC industry along the entire supply chain;Enable the establishment of a EU based supply industry for hybrid FC system simulation and experimental tool environment (XiL platform) to order to boost the competitiveness of EU FC industry. At the end of the project, open and free access to the platform it is expected for EU industry, in particular SMEs with limited costs to the operational costs. Type of action: Research and Innovation Action

The conditions related to this topic are provided in the chapter 3.3 and in the General Annexes to the Horizon 2020 Work Programme 2018– 2020 which apply mutatis mutandis.


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Electrochemistry batteries and fuel cells Automation and control systems Fuel cell technology Automotive engineering

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and systems for all kinds of applications, mobile and stationary. In many of these applications, fuel cell technology is and will be competing with other well-established technologies. The market price, durability and performance of the established technologies (internal combustion engines, gas turbines, partly batteries) have been optimized over many years, so that it is hard to compete with for the rather new fuel cell technology, which is a complex and highly integrated mechatronic and chemical system of systems. Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and systems for all kinds of applications, mobile and stationary. In many of these applications, fuel cell technology is and will be competing with other well-established technologies. The market price, durability and performance of the established technologies (internal combustion engines, gas turbines, partly batteries) have been optimized over many years, so that it is hard to compete with for the rather new fuel cell technology, which is a complex and highly integrated mechatronic and chemical system of systems.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1.   Eligible countries: described in Annex A of the H2020 main Work Programme.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 main Work Programme.
The following exception applies (see 'chapter 3.3. Call management rules' from the FCH2 JU 2018 Work Plan and specific topic description):
For some actions, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution, as follows:
FCH-01-1-2019: Demonstrating the blueprint for a zero-emission logistics ecosystem
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-2-2019: Scaling up and demonstration of a multi-MW Fuel Cell system for shipping
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-1-2019: Combined electrolyser...
1.   Eligible countries: described in Annex A of the H2020 main Work Programme.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 main Work Programme.
The following exception applies (see 'chapter 3.3. Call management rules' from the FCH2 JU 2018 Work Plan and specific topic description):
For some actions, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution, as follows:
FCH-01-1-2019: Demonstrating the blueprint for a zero-emission logistics ecosystem
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-01-2-2019: Scaling up and demonstration of a multi-MW Fuel Cell system for shipping
The maximum FCH 2 JU contribution that may be requested is EUR 10 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-1-2019: Combined electrolyser-HRS and Power-to-Gas system
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
 FCH-02-2-2019: Multi megawatt high-temperature electrolyser for valorisation as energy vector in energy intensive industry
The maximum FCH 2 JU contribution that may be requested is EUR 7 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
  FCH-02-3-2019: Continuous supply of green or low carbon H2 and CHP via Solid Oxide Cell based Polygeneration
The maximum FCH 2 JU contribution that may be requested is EUR 3 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-02-6-2019: New materials, architectures and manufacturing processes for Solid Oxide Cells
The maximum FCH 2 JU contribution that may be requested is EUR 5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
 FCH-02-7-2019: Development of highly efficient and flexible mini CHP fuel cell system based on HTPEMFCs
The maximum FCH 2 JU contribution that may be requested is EUR 1.5 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
FCH-03-1-2019: H2 Valley
The maximum FCH 2 JU contribution that may be requested is EUR 20 million. This is an eligibility criterion – proposals requesting FCH 2 JU contributions above this amount will not be evaluated.
 
For all actions of the call, the FCH 2 JU will activate the option for EU grants indicated under Article 30.3 of the Model Grant Agreement, regarding the FCH 2 JU’s right to object to transfers or licensing of results.
 
     Proposal page limits and layout: Please refer to Part B of the proposal template in the submission tool below.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the H2020 main Work Programme.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
      Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
      Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5.   Proposal templates, evaluation forms and model grant agreements (MGA):
FCH JU Research and Innovation Action (FCH-RIA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
FCH JU Innovation Action (FCH-IA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
FCH JU Coordination and Support Action (FCH-CSA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
 
6.   Additional requirements:
      Horizon 2020 budget flexibility
      Classified information
      Technology readiness levels (TRL)
      Financial support to Third Parties
 
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
7.   Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the H2020 main Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
8.   Additional documents
FCH JU Work Plan
FCH2 JU Multi Annual Work Plan and its addendum
FCH2 JU – Regulation of establishment
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2019-1 Cyber-physical platform for hybrid Fuel Cell systems Specific Challenge:One of the most important objectives of FCH 2 JU is the support of the industrialization of fuel cell technology and syst...
Sin info.
FCH-01-4-2020 Standard Sized FC module for Heavy Duty applications
en consorcio: Specific Challenge:Hydrogen is considered to play an essential role in future zero-emissions Heavy Duty (HD) mobility. There is a growing co...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-8-2020 Scale-up and demonstration of innovative hydrogen compressor technology for full-scale hydrogen refuelling station
en consorcio: Specific Challenge:Hydrogen compression remains a major bottleneck in the development of the refuelling infrastructure for H2 mobility. The...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-5-2020 Demonstration of FC Coaches for regional passenger transport
en consorcio: Specific Challenge:For intercity and long-distance transport of passengers, coaches are used normally. About 20% of all registered buses for...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-3-2020 Liquid Hydrogen on-board storage tanks
en consorcio: Specific Challenge:Commercial trucks, that are responsible for a quarter of road transport CO2 emissions, are particularly sensitive to H2 s...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-01-1-2020 Development of hydrogen tanks for electric vehicle architectures
en consorcio: Specific Challenge:It is expected that vehicle architectures will change significantly in the next few years due to major trends in the auto...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de