Innovating Works
CE-SC5-29-2020
CE-SC5-29-2020: A common European framework to harmonise procedures for plastics pollution monitoring and assessments
Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important, including consistent monitoring and mapping of plastic litter. These activities are indeed necessary in order to enable a comprehensive inventory to be carried out to classify the occurrence, to identify pollution priorities and to determine changes in the occurrence by means of subsequent investigations. At present, there are no harmonised EU-wide methods for determining the composition and occurrence of plastics in various relevant environmental compartments (e.g. marine waters, marine sediments, freshwater, soil, air). A commonly accepted terminology is the prerequisite for data comparability, collaboration, meta-level analysis and assessment. Rather than continuing to have different organisations and bodies at international, European and Member State level proposing their own definitions, a coordinated approach needs to be promoted. With research on the scale of the problem rapidly evolving, a systematic collection of available data and a critical assessment is missing.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 13-02-2020.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important, including consistent monitoring and mapping of plastic litter. These activities are indeed necessary in order to enable a comprehensive inventory to be carried out to classify the occurrence, to identify pollution priorities and to determine changes in the occurrence by means of subsequent investigations. At present, there are no harmonised EU-wide methods for determining the composition and occurrence of plastics in various relevant environmental compartments (e.g. marine waters, marine sediments, freshwater, soil, air). A commonly accepted terminology is the prerequisite for data comparability, collaboration, meta-level analysis and assessment. Rather than continuing to have different organisations and bodies at international, European and Member State level proposing their own definitions, a coordinated approach needs to be promoted. With research on the scale of the problem rapidly evolving, a systematic collection of available data and a critical assessment is missing.


Scope:The aim of this action is to develop a comm... ver más

Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important, including consistent monitoring and mapping of plastic litter. These activities are indeed necessary in order to enable a comprehensive inventory to be carried out to classify the occurrence, to identify pollution priorities and to determine changes in the occurrence by means of subsequent investigations. At present, there are no harmonised EU-wide methods for determining the composition and occurrence of plastics in various relevant environmental compartments (e.g. marine waters, marine sediments, freshwater, soil, air). A commonly accepted terminology is the prerequisite for data comparability, collaboration, meta-level analysis and assessment. Rather than continuing to have different organisations and bodies at international, European and Member State level proposing their own definitions, a coordinated approach needs to be promoted. With research on the scale of the problem rapidly evolving, a systematic collection of available data and a critical assessment is missing.


Scope:The aim of this action is to develop a common European framework to harmonise procedures for plastics pollution monitoring and assessments. This action should do so by bringing together the main national research groups in the field of physicochemical analysis of plastics in the environment, covering nano-, micro- and macro-plastics, to present jointly designed process proposals for the determination of plastics in different environmental matrices. A critical mass of actors and increased synergies between all relevant research areas (e.g. marine, surface, groundwater, drinking and waste water, soil, air), industry, regulators, associations and relevant EU services and standardisation bodies will be a key element to address the challenge. It is expected that different sampling, extraction and analysis methods are evaluated for their suitability and feasibility (availability, cost-effectiveness, quality of data generated) for use within future monitoring activities.

This action should ensure adequate flexibility for taking into account all relevant aspects prior to formal standardisation procedures and provide:

a) harmonised methods for sampling, sample preparation and analytical detection of different kind of plastics in different environmental compartments and connected matrices, including realistic matrix reference materials;

b) methods for monitoring to enable a comprehensive inventory to be carried out to classify the occurrence, to identify emission and pollution priorities and to determine changes in the occurrence by means of subsequent investigations;

c) methods for identification and analysis of plastics in the environment;

d) proposals as a basis for international and European standards (ISO / CEN);

e) recommendations for future relevant EU policy and legislation;;

f) increased knowledge on the occurrence of plastics in the environment with respect to related questions, such as physical and chemical adverse effects on biota.

In addition, this action should deliver guidance on data management, including the need for relevant infrastructures, cooperation on sharing data, creation of joint databases and the promotion of meta-analysis of existing data. This action does not involve data collection. It should also inform future strategic programming for research and innovation for plastics by identifying knowledge gaps and needs.

​This topic is in support of the European Strategy for Plastics in a Circular Economy. Selected projects under this topic as well as projects selected under other topics in H2020 supporting the Plastics Strategy are strongly encouraged to participate in joint activities as appropriate. These joint activities could take the form of clustering of projects, participation in workshops, common exploitation and dissemination etc. The projects should describe how they will be complementary with already existing relevant national activities or other multilateral activities funded by the EU or funded jointly by several Member States. The proposals are expected to demonstrate support to common coordination and dissemination activities. Applicants should plan the necessary budget to cover those activities without the prerequisite to define concrete common actions at this stage.

The Commission considers that proposals requesting a contribution from the EU in the range of EUR 2 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:The project results are expected to contribute to:

achieving the objectives of the EU Plastics Strategy, in particular with regard to the possibilities for future prioritisation of measures in Europe and to the possibilities of reviewing their effectiveness in terms of reducing emissions, and contributing to the implementation of Strategic Research and Innovation Agenda foreseen in that strategy;fostering innovative policymaking through robust methodologies and uniformed tools and reduction of analytical uncertainties;bringing the EU to the forefront of international discussion and collaboration in the field of plastic pollution monitoring and assessing through the know-how generated (planned publications and templates for standardisation procedures);improving the economic viability of analytical instrument manufacturers;establishing a framework and foundation for the implementation of European and global level monitoring programmes for nano-, micro- and macro-plastic.
Cross-cutting Priorities:Blue Growth


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important, including consistent monitoring and mapping of plastic litter. These activities are indeed necessary in order to enable a comprehensive inventory to be carried out to classify the occurrence, to identify pollution priorities and to determine changes in the occurrence by means of subsequent investigations. At present, there are no harmonised EU-wide methods for determining the composition and occurrence of plastics in various relevant environmental compartments (e.g. marine waters, marine sediments, freshwater, soil, air). A commonly accepted terminology is the prerequisite for data comparability, collaboration, meta-level analysis and assessment. Rather than continuing to have different organisations and bodies at international, European and Member State level proposing their own definitions, a coordinated approach needs to be promoted. With research on the scale of the problem rapidly evolving, a systematic collection of available data and a critical assessment is missing. Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important, including consistent monitoring and mapping of plastic litter. These activities are indeed necessary in order to enable a comprehensive inventory to be carried out to classify the occurrence, to identify pollution priorities and to determine changes in the occurrence by means of subsequent investigations. At present, there are no harmonised EU-wide methods for determining the composition and occurrence of plastics in various relevant environmental compartments (e.g. marine waters, marine sediments, freshwater, soil, air). A commonly accepted terminology is the prerequisite for data comparability, collaboration, meta-level analysis and assessment. Rather than continuing to have different organisations and bodies at international, European and Member State level proposing their own definitions, a coordinated approach needs to be promoted. With research on the scale of the problem rapidly evolving, a systematic collection of available data and a critical assessment is missing.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome of evaluation (two-stage call):
For stage 1: maximum 3 months from the deadline for submission.
For stage 2: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Coordination and Support Action:...
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome of evaluation (two-stage call):
For stage 1: maximum 3 months from the deadline for submission.
For stage 2: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Coordination and Support Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
 
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
8. Additional documents:
1. Introduction WP 2018-20
12. Climate action, environment, resource efficiency and raw materials WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
 
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
 
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-SC5-2018-2019-2020 A common European framework to harmonise procedures for plastics pollution monitoring and assessments Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important...
Sin info.
CE-SC5-30-2020 Plastics in the environment: understanding the sources, transport, distribution and impacts of plastics pollution
en consorcio: Specific Challenge:To date, efforts to understand the sources, transport and distribution of plastic pollution have mainly focused on the ma...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
CE-SC5-24-2020 Improving the sorting, separation and recycling of composite and multi-layer materials
en consorcio: Specific Challenge:Composite or multi-layer materials are increasingly used in different applications. Products and materials are getting mo...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
CE-SC5-25-2020 Understanding the transition to a circular economy and its implications on the environment, economy and society
en consorcio: Specific Challenge:The transition to a circular economy entails a systemic transformation of entire value chains, covering design, productio...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
CE-SC5-29-2020 A common European framework to harmonise procedures for plastics pollution monitoring and assessments
en consorcio: Specific Challenge:To develop long-term solutions to reduce plastic pollution, a thorough understanding of the emission problem is important...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
CE-SC5-28-2020 Develop and pilot circular systems in plastics, textiles and furniture sectors
en consorcio: Specific Challenge:Innovation is an indispensable part of the systemic transition towards a circular economy. In the past, innovation in sec...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de