ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 26-04-2022.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio..
Esta ayuda financia Proyectos:

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

Performance and reliability improvement of geothermal systems. Reduced environmental impact of geothermal plants.Increased citizen engagement.Reduction of LCOE approaching SET Plan targets (actions should clearly justify the estimated LCOE at project start and end).
Scope:High-temperature underground thermal energy storage (HT-UTES) covers the 25-90°C temperature range, and the targets of interest can reach up to 2000 m in depth. The development of UTES is linked to a multidisciplinary understanding of the whole system, including waste-heat source, exploration and subsurface characterisation, production, implementation and distribution systems, as well as the adaptation of the regulatory framework and social acceptance. The main technical challenges are the adaptation of the return temperature from the surface site to the subsurface temperature and to the regulatory frameworks, identification, characterisation and monitoring the reservoirs for UTES, the geo-mechanical effects of the reservoir linked to the seasonal injection/ production operations related to pr... ver más

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

Performance and reliability improvement of geothermal systems. Reduced environmental impact of geothermal plants.Increased citizen engagement.Reduction of LCOE approaching SET Plan targets (actions should clearly justify the estimated LCOE at project start and end).
Scope:High-temperature underground thermal energy storage (HT-UTES) covers the 25-90°C temperature range, and the targets of interest can reach up to 2000 m in depth. The development of UTES is linked to a multidisciplinary understanding of the whole system, including waste-heat source, exploration and subsurface characterisation, production, implementation and distribution systems, as well as the adaptation of the regulatory framework and social acceptance. The main technical challenges are the adaptation of the return temperature from the surface site to the subsurface temperature and to the regulatory frameworks, identification, characterisation and monitoring the reservoirs for UTES, the geo-mechanical effects of the reservoir linked to the seasonal injection/ production operations related to pressure and temperature changes, hydrogeochemical problems associated with scaling and corrosion of the piping system, circular design and optimisation of the distribution network.

The proposal is expected to:

Develop and demonstrate appropriate control systems and infrastructure to manage geothermal heat and electricity production, heat demand and storage connected to the installation.Use the flexibility of geothermal reservoirs as thermal energy storage systems and flexibility in the network coping with daily, weekly and seasonal variations in heat demand.Demonstrate the innovative technologies in at least 2 different plants with different characteristics. This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.


Specific Topic Conditions:Activities are expected to achieve TRL 7 by the end of the project – see General Annex B.




Cross-cutting Priorities:Societal EngagementDigital AgendaSocial sciences and humanitiesArtificial Intelligence


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Subcontracting costs.
Purchase costs.
Other cost categories.
Indirect costs.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 6:. Representa un paso importante en demostrar la madurez de una tecnología. Se construye un prototipo de alta fidelidad que aborda adecuadamente las cuestiones críticas de escala, que opera en un entorno relevante, y que debe ser a su vez una buena representación del entorno operativo real. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Para el presupuesto subvencionable la intensidad de la ayuda en formato fondo perdido podrá alcanzar desde un 70% hasta un 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.