Innovating Works
HORIZON-CL5-2022-D3-01-14
Thermal energy storage solutions
ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
Sólo fondo perdido 0 €
European
This call is closed Esta línea ya está cerrada por lo que no puedes aplicar.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos:

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

Develop and demonstrate novel modular, compact, high performances, thermal energy storage solutions (TES) for heating, hot tap water and cooling for electricity load shifting. The integration of the solution within the energy networks of the building and its system management should allow different functions, such as peak load reduction, energy saving, energy cost minimization.Develop and demonstrate a novel thermal energy storage system much more compact than state-of-the-art technologies, enabling the storage of heat and cold for domestic applications for periods typically of 4 weeks long.
Scope:The scope covers the whole spectrum of application of the thermal energy storage systems, ranging from short run to longer run, as well as from the smaller to bigger sizes:

Thermal end-uses (space heating, hot tap water, cooling) represent a major share of the European electricity demand with consumption often at peak times. Integration into the building heating system and in the smart electricity grid is a key development aspect, next to the storage mate... see more

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

Develop and demonstrate novel modular, compact, high performances, thermal energy storage solutions (TES) for heating, hot tap water and cooling for electricity load shifting. The integration of the solution within the energy networks of the building and its system management should allow different functions, such as peak load reduction, energy saving, energy cost minimization.Develop and demonstrate a novel thermal energy storage system much more compact than state-of-the-art technologies, enabling the storage of heat and cold for domestic applications for periods typically of 4 weeks long.
Scope:The scope covers the whole spectrum of application of the thermal energy storage systems, ranging from short run to longer run, as well as from the smaller to bigger sizes:

Thermal end-uses (space heating, hot tap water, cooling) represent a major share of the European electricity demand with consumption often at peak times. Integration into the building heating system and in the smart electricity grid is a key development aspect, next to the storage materials and technologies. Such storage devices reduces the demand for electricity from the grid at peak times during the day, allowing off peak electricity to be used in the building for satisfying cooling needs during summer and/or heating demand, for space heating and hot tap water at later times. The typical charging power is in the order of 3 kW, for periods of up to three hours. The TES system is conceived modularly. The high volumetric energy density is a basic requirement given its utilization.For buildings not connected to district heating and cooling network, a much more compact TES system is needed to optimize and to increase the integration of varying RES . Such systems need much less volume than state-of-the-art technologies, realized with materials that have extremely low heat losses and enable the storage of heat and cold for domestic applications for periods typically up to 4 weeks. Cost reduction is a very important target, as the present solutions are too expensive. The ideal thermochemical TES process should have high reaction heat; Good reversibility; Fast charging and discharging rates; Stable reaction products; Non-toxic, non-corrosive, non-flammable and non-explosive reactants and products; Large-scale availabilities and abundance, affordable price. The nature of the activities concerns:

The development of novel phase change materials (PCM) and thermochemical materials (TCM) and components of required characteristics for thermochemical and PCM TES, characterized by low starting TRL (4). The development & adaptation of available heat exchanger and novel reactor designs; design and development of controls and modelling for novel sensors for TCM and PCM, starting from a higher TRL (5).Ice cold storage having higher TRL (6). The achievable storage density (kWh/m3) depends on the technological approach (sensible heat, PCM and TCM) and decreases drastically moving from the component to the system level. Furthermore, with the exception of TCM, the charge of the store decreases with elapsed time. The expected system level storage density measured initially and after four weeks from the charge should be indicated.

The selected projects are expected to contribute to relevant BRIDGE[1] activities.


Specific Topic Conditions:Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.




Cross-cutting Priorities:Digital AgendaArtificial Intelligence


[1]https://www.h2020-bridge.eu/

see less

Temáticas Obligatorias del proyecto: Temática principal: Digital Agenda Energy fuels and petroleum engineering Artificial Intelligence Electrical engineering Electronic engineering In

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Expenses related to personnel working directly on the project are based on actual hours spent, based on company costs, and fixed ratios for certain employees, such as the company's owners.
Subcontracting costs.
Payments to external third parties to perform specific tasks that cannot be performed by the project beneficiaries.
Purchase costs.
They include the acquisition of equipment, amortization, material, licenses or other goods and services necessary for the execution of the project
Other cost categories.
Miscellaneous expenses such as financial costs, audit certificates or participation in events not covered by other categories
Indirect costs.
Overhead costs not directly assignable to the project (such as electricity, rent, or office space), calculated as a fixed 25% of eligible direct costs (excluding subcontracting).
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 6:. Se cuenta con prototipos piloto capaces de desarrollar todas las funciones necesarias dentro de un sistema determinado, habiendo superado pruebas de factibilidad en condiciones de operación o funcionamiento real. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
For the eligible budget, the intensity of the aid in the form of a lost fund may reach From a 70% up to a 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2022-D3-01 Thermal energy storage solutions ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Develop and demonstrate novel modular...
Sin info.
HORIZON-CL5-2022-D3-01-12 Replicable solutions for a cross sector compliant energy ecosystem
en consorcio: ExpectedOutcome:Project results are expected to contribute to most of the following expected outcomes: A catalogue of services and flexibil...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D3-01-14 Thermal energy storage solutions
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Develop and demonstrate novel modular...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D3-01-11 Demonstration of innovative forms of storage and their successful operation and integration into innovative energy systems and grid architectures
en consorcio: ExpectedOutcome:Project results are expected to contribute to most of the following expected outcomes: Demonstration of innovative storage...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D3-01-06 Novel Agro-Photovoltaic systems
en consorcio: ExpectedOutcome:Photovoltaic power generation is pivotal to a clean energy system and the achievement of the zero-emissions target. To that...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D3-01-04 Demonstrate the use of high temperature geothermal reservoirs to provide energy storage for the energy system
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Performance and reliability improveme...
Cerrada | next call scheduled for the month of