Innovating Works

NEMO

Financiado
Near-zero-waste recycling of low-grade sulphidic mining waste for critical-metal, mineral and construction raw-material production in a circular economy With an estimated volume of 600 Mtonne/yr and a historic stockpile of 28,000 Mtonne, sulphidic mining waste from the production of Cu, Pb, Zn and Ni, represents the largest volume of extractive waste in Europe. When poorly managed... With an estimated volume of 600 Mtonne/yr and a historic stockpile of 28,000 Mtonne, sulphidic mining waste from the production of Cu, Pb, Zn and Ni, represents the largest volume of extractive waste in Europe. When poorly managed, these tailings may cause major environmental problems such as acid mine drainage. In 2016 EIP Raw Materials launched a call to arms to transform the extractive-waste problem into a resource-recovery opportunity, as tailings still contain valuable & critical metals. Using a 4 PILOTS – 2 case-studies concept NEMO develops, demonstrates and exploits, therefore, new ways to valorise sulphidic tailings. The 2 cases are the Sotkamo Ni-Cu-Zn-REE/Sc mine in Finland and the Las Cruces Cu-mine in Spain; the 4 PILOTS are located at key points in the near-zero-waste flowsheet, encompassing the recovery of valuable & critical metals, the safe concentration of hazardous elements, the removal of sulphur as sulphate salts, while using the residual mineral fraction in cement, concrete and construction products. NEMO has established an interdisciplinary consortium, including 8 industrial partners (2 mining, 4 engineering, 1 machine manufacturing & 1 construction material company), 4 research institutes, 2 universities and 1 civil society group. NEMO’s near-zero-waste technology will provide the EU with both direct and long-term, indirect advantages. The former range from new resources (e.g. base metals: Cu, Zn, Ni, Pb; critical metals: Sc, Nd, Y, Sb; SCM and aggregates etc.), CO2 savings from metal recovery and the replacement of Ordinary Portland Cement), new job creation (> 150 FTEs), new revenues (> 200 M€/yr) while the latter represent the multiplication of the former benefits (cf. 28,000 Mtonne of these tailings), while eradicating acid-mine drainage and other environmental issues, and ensuring an enhanced dialogue (framework) between industry and civil society, to obtain and maintain the License to Operate mines in EU. ver más
31/10/2022
14M€
Duración del proyecto: 53 meses Fecha Inicio: 2018-05-01
Fecha Fin: 2022-10-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2022-10-31
H2020 No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 14M€
Líder del proyecto
TEKNOLOGIAN TUTKIMUSKESKUS VTT OY No se ha especificado una descripción o un objeto social para esta compañía.