MiniStor

Financiado
Minimal Size Thermal and Electrical Energy Storage System for In-Situ Residential Installation The EU building stock has large potential to increase its energy efficiency with solutions that can be integrated to existing dwellings and through different measures. One of them is optimizing the use and management of thermal en... The EU building stock has large potential to increase its energy efficiency with solutions that can be integrated to existing dwellings and through different measures. One of them is optimizing the use and management of thermal energy by allowing it to be stored, levelling demand peaks and increasing use of renewables affected by intermittency such as solar-based heating. The MiniStor project aims at designing and producing a novel compact integrated thermal storage system for achieving sustainable heating, cooling and electricity storage that can be adapted to existing systems in residential buildings. It is based on a high-performing CaCl2/NH3 (calcium chloride/ammonia) thermochemical material reaction combined with parallel hot and cold phase-change materials for flexibility and usage year-round. It also stores electrical energy in a Li-ion battery that responds to grid signals and can sell to the electrical grid. The system is managed by a smart Building Energy Management System that connects to the Internet of Things. The system can have as input energy obtained from a variety of renewable energy sources such as hybrid photovoltaic thermal panels. This arrangement is demonstrated and validated in four demonstration sites (Ireland, France, Greece and Hungary), testing its effectiveness at different local climatic conditions and facilitating market replication. The system provides stability, performance and use of at least 20 years, an estimated compact storage material volume of 0.72 m3, reduced net energy consumption in a building by at least 44% and a return-on-investment period of 6.7 years, using high energy density storage materials that reach storage densities up to 10.6 times higher than water. ver más
30/04/2024
9M€
Duración del proyecto: 53 meses Fecha Inicio: 2019-11-01
Fecha Fin: 2024-04-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2024-04-30
H2020 No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 9M€
Líder del proyecto
UNIVERSITY COLLEGE CORK NATIONAL UNIVERSITY... No se ha especificado una descripción o un objeto social para esta compañía.