Innovating Works

ELYntegration

Financiado
Grid Integrated Multi Megawatt High Pressure Alkaline Electrolysers for Energy Applications The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to pr... The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares. The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising:- cylindrical stack consisting of industrial size elementary cells (1,600 mm cell diameter)- balance of plant (BOP)- power electronics- advanced communication & control system In the early phase of the development process, great attention will be brought to the identification of end-user’s needs and relevant/critical operational requirements.The target behaviour of the industrial prototype will be thoroughly demonstrated in an operational environment reflecting different on-grid integration schemes using power facilities already available to the Consortium (notably, 635 kW wind and 100 kW photovoltaic power plants).As previously mentioned, the successful demonstration of the industrial prototype will be paving the way towards the implementation and the commercial deployment of the 4.5 T H2/day HP AWE technology in the frame of large scale demonstration projects which shall be the next step after the conclusion of ELYntegration. ver más
31/05/2019
3M€
Duración del proyecto: 44 meses Fecha Inicio: 2015-09-01
Fecha Fin: 2019-05-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-05-31
H2020 No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 3M€
Líder del proyecto
FUNDACION PARA EL DESARROLLO DE NUEVAS TECNOL... No se ha especificado una descripción o un objeto social para esta compañía.