Innovating Works

VAS

Desconocido
FP3 - IAM4RAIL: Europe s Rail Flagship Project 3 Holistic and Integrated Asset Management for Europe s RAIL System VOESTALPINE RAIL TECHNOLOGY GMBH participó en un HORIZON EUROPE: HORIZON-ER-JU-2022-01 The IAM4RAIL project focuses on seven (7) different integrated demonstrators for rail assets which are key for research and innovation (R&I)...
2022-12-15 - 2026-11-30 | Financiado
IN2TRACK3: IN2TRACK3 VOESTALPINE RAIL TECHNOLOGY GMBH participó en un H2020: H2020-S2RJU-2020 The European railway industry faces great challenges in need for increased network capacity. Ageing infrastructure assets require efficient...
2021-05-12 - 2023-12-31 | Financiado
IN2TRACK2: Research into enhanced track and switch and crossing system 2 VOESTALPINE RAIL TECHNOLOGY GMBH participó en un H2020: H2020-S2RJU-2018 The IN2TRACK2 proposal addresses the topic of Research into optimised and future railway infrastructure of the 2018 HORIZON 2020 SHIFT2RAIL...
2019-03-14 - 2022-02-28 | Financiado
IN2TRACK: Research into enhanced tracks switches and structures VOESTALPINE RAIL TECHNOLOGY GMBH participó en un H2020: H2020-S2RJU-2016-01 Research into Enhanced Track, Switches and Structure The railway of the future needs to meet the predicted growth in societal demand in te...
2016-08-31 - 2019-04-30 | Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.