Innovating Works

Inspecta

Desconocido
APAL: Advanced PTS Analysis for LTO KIWA INSPECTA TECHNOLOGY AB participó en un H2020: NFRP-2019-2020 In the EU, most of the nuclear power plants (NPPs) are currently in the second half of their designed lifetime, making lifetime extension an...
2020-05-19 - 2024-09-30 | Financiado
ATLASplus: Advanced Structural Integrity Assessment Tools for Safe Long Term Operation KIWA INSPECTA TECHNOLOGY AB participó en un H2020: NFRP-2016-2017 NFRP 1: 2016-2017 notes that A number of current Generation II reactors should continue operating for a few decades and Generation III shoul...
2017-05-19 - 2021-11-30 | Financiado
APAL: Advanced PTS Analysis for LTO KIWA INSPECTA TECHNOLOGY AB participó en un FP6: NFRP-2019-2020 In the EU, most of the nuclear power plants (NPPs) are currently in the second half of their designed lifetime, making lifetime extension an...
2020-10-01 - 2024-09-30 | Financiado
ATLASplus: Advanced Structural Integrity Assessment Tools for Safe Long Term Operation KIWA INSPECTA TECHNOLOGY AB participó en un FP6: NFRP-2016-2017 NFRP 1: 2016-2017 notes that A number of current Generation II reactors should continue operating for a few decades and Generation III shoul...
2017-06-01 - 2021-11-30 | Financiado
NUGENIA-PLUS: Preparing NUGENIA for HORIZON2020 KIWA INSPECTA TECHNOLOGY AB participó en un FP7: Preparing NUGENIA for HORIZON 2020 The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and...
Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.