FIND: Future Instrumentation and coNtrol based on innovative methods and Disruptive technologies for highe... The Long-Term Operation of Nuclear Power Plants (NPPs) calls for innovative methods to monitor the ageing of safety systems. New instrumenta...
2024-06-28 - 2028-09-30 | Financiado
GO-VIKING: Gathering expertise On Vibration ImpaKt In Nuclear power Generation IPPCENTER LIMITED LIABILITY COMPANY participó en un HORIZON EUROPE: HORIZON-EURATOM-2021-NRT-01 The Gathering expertise On Vibration ImpaKt In Nuclear power Generation (GO-VIKING) project takes over from the VIKING initiative that start...
2022-05-31 - 2026-05-31 | Financiado
DELISA- LTO: DELISA-LTO: DEscription of the extended LIfetime and its influence on the SAfety operation and const... IPPCENTER LIMITED LIABILITY COMPANY participó en un HORIZON EUROPE: HORIZON-EURATOM-2021-NRT-01 The aim of the project is to determine the most affected and threatened components from the point of view of the long-term operation (LTO) a...
2022-05-30 - 2026-05-31 | Financiado
ECC-SMART: Joint European Canadian Chinese development of Small Modular Reactor Technology IPPCENTER LIMITED LIABILITY COMPANY participó en un H2020: NFRP-2019-2020 The ECC-SMART is oriented towards assessing the feasibility and identification of safety features of an intrinsically and passively safe sma...
2020-05-19 - 2025-02-28 | Financiado
STRUMAT-LTO: STRUctural MATerials research for safe Long Term Operation of LWR NPPs IPPCENTER LIMITED LIABILITY COMPANY participó en un H2020: NFRP-2019-2020 One of the critical issues of long-term operation (LTO) of mainly pressurised water reactors (PWRs) is the embrittlement of the reactor pres...
2020-05-19 - 2024-08-31 | Financiado
APAL: Advanced PTS Analysis for LTO IPPCENTER LIMITED LIABILITY COMPANY participó en un H2020: NFRP-2019-2020 In the EU, most of the nuclear power plants (NPPs) are currently in the second half of their designed lifetime, making lifetime extension an...
2020-05-19 - 2024-09-30 | Financiado
APAL: Advanced PTS Analysis for LTO IPPCENTER LIMITED LIABILITY COMPANY participó en un FP6: NFRP-2019-2020 In the EU, most of the nuclear power plants (NPPs) are currently in the second half of their designed lifetime, making lifetime extension an...
2020-10-01 - 2024-09-30 | Financiado
ECC-SMART: Joint European Canadian Chinese development of Small Modular Reactor Technology IPPCENTER LIMITED LIABILITY COMPANY participó en un FP6: NFRP-2019-2020 The ECC-SMART is oriented towards assessing the feasibility and identification of safety features of an intrinsically and passively safe sma...
2020-09-01 - 2024-08-31 | Financiado
STRUMAT-LTO: STRUctural MATerials research for safe Long Term Operation of LWR NPPs IPPCENTER LIMITED LIABILITY COMPANY participó en un FP6: NFRP-2019-2020 One of the critical issues of long-term operation (LTO) of mainly pressurised water reactors (PWRs) is the embrittlement of the reactor pres...
2020-09-01 - 2024-08-31 | Financiado
Z-ultra: Z phase strengthened steels for ultra supercritical power plants IPPCENTER LIMITED LIABILITY COMPANY participó en un FP7: The aim is to develop a heat resistant steel with a 100 000 hour creep strength of 100 MPa at 650°C. This allows increasing the thermal effi...