Innovating Works
JTI-CS2-2019-CfP10-SYS-02-61
Vapor Cycle System - Heat Exchanger performance 3D modeling with...
Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly in evaporators, and in particular to understand the impact on performance and pressure drop of the following parameters: gravity field, titer quantity and spacial distribution, mass flow rate of refrigerant, HX structure. Hence a multi-scale modeling approach is awaited in order to focus on various physical phenomenon induced in the heat exchanger. This numerical approach shall be validated by experimental developments led under a design of experiments. Please refer to the full topic descriptions document published in this call.
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 03-09-2019.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly in evaporators, and in particular to understand the impact on performance and pressure drop of the following parameters: gravity field, titer quantity and spacial distribution, mass flow rate of refrigerant, HX structure. Hence a multi-scale modeling approach is awaited in order to focus on various physical phenomenon induced in the heat exchanger. This numerical approach shall be validated by experimental developments led under a design of experiments. Please refer to the full topic descriptions document published in this call.


Temáticas Obligatorias del proyecto: Temática principal:

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly in evaporators, and in particular to understand the impact on performance and pressure drop of the following parameters: gravity field, titer quantity and spacial distribution, mass flow rate of refrigerant, HX structure. Hence a multi-scale modeling approach is awaited in order to focus on various physical phenomenon induced in the heat exchanger. This numerical approach shall be validated by experimental developments led under a design of experiments. Please refer to the full topic descriptions document published in this call. Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly in evaporators, and in particular to understand the impact on performance and pressure drop of the following parameters: gravity field, titer quantity and spacial distribution, mass flow rate of refrigerant, HX structure. Hence a multi-scale modeling approach is awaited in order to focus on various physical phenomenon induced in the heat exchanger. This numerical approach shall be validated by experimental developments led under a design of experiments. Please refer to the full topic descriptions document published in this call.
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
1. Countries eligible for funding: described in Annex A of the Clean Sky 2 Work Plan.
2. Eligibility and admissibility conditions: described in Annex B & Annex C of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the proposal template in the submission tool below.
3. Evaluation
Evaluation criteria, scoring and thresholds: described in Annex F of the Clean Sky 2 Work Plan.
Submission and evaluation processes: described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
4. Indicative time for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
5. Proposal templates and model grant agreements (MGA):
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
H2020 Annotated Grant Agreement
 
6. Additional provisions:
Clean Sky 2 Budget Flexibility: described in Annex G of the Clean Sky 2 JU Work Plan.
 
Members of consortium are required to conclude a consortium agreement prior to the signature of the grant agreement.
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will...
1. Countries eligible for funding: described in Annex A of the Clean Sky 2 Work Plan.
2. Eligibility and admissibility conditions: described in Annex B & Annex C of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the proposal template in the submission tool below.
3. Evaluation
Evaluation criteria, scoring and thresholds: described in Annex F of the Clean Sky 2 Work Plan.
Submission and evaluation processes: described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
4. Indicative time for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
5. Proposal templates and model grant agreements (MGA):
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
H2020 Annotated Grant Agreement
 
6. Additional provisions:
Clean Sky 2 Budget Flexibility: described in Annex G of the Clean Sky 2 JU Work Plan.
 
Members of consortium are required to conclude a consortium agreement prior to the signature of the grant agreement.
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the H2020 Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
8. Additional documents:
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of Establishment
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
 
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP10-2019-01 Vapor Cycle System - Heat Exchanger performance 3D modeling with different new low GWP refrigerants Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly...
Sin info.
JTI-CS2-2019-CfP10-SYS-02-60 Toward a Digital Twin ECS and thermal management architecture models : Improvement of MODELICA libraries and usage of Deep Learning technics
en consorcio: Specific Challenge:Following results from the MALET CfP, it underlines the major challenges of modelling Environmental Control System (ECS)...
Cerrada does 5 years | next call scheduled for the month of
JTI-CS2-2019-CfP10-SYS-03-23 Electro-Mechanical Landing Gear system integration for Small Aircraft [SAT]
en consorcio: Specific Challenge:This topic aims at integration of electro-mechanical landing gear and brake system (which are being developed as part of...
Cerrada does 5 years | next call scheduled for the month of
JTI-CS2-2019-CfP10-SYS-01-18 Low-profile/drag electronically steerable antennas for In-Flight Connectivity
en consorcio: Specific Challenge:The objective is to study and prototype the next generation of low-profile airborne antennas that will be used for In-Fli...
Cerrada does 5 years | next call scheduled for the month of
JTI-CS2-2019-CfP10-SYS-01-19 VOC filtration device for Inerting System
en consorcio: Specific Challenge:The aim of this topic is to increase the life duration and availability of an inerting system in protecting the separatio...
Cerrada does 5 years | next call scheduled for the month of
JTI-CS2-2019-CfP10-SYS-02-61 Vapor Cycle System - Heat Exchanger performance 3D modeling with different new low GWP refrigerants
en consorcio: Specific Challenge:The objective of this topic is to gain knowledge on physics involved inside two-phase heat exchangers and more explicitly...
Cerrada does 5 years | next call scheduled for the month of