Innovating Works
JTI-CS2-2014-CFP01-FRC-02-04
JTI-CS2-2014-CFP01-FRC-02-04: Tools development for aerodynamic optimization on engine air intake
Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to set up a workflow dedicated to engine air inlet aerodynamic optimization. This workflow will be used to define the next generation of rotorcraft engine air inlets.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 31-03-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to set up a workflow dedicated to engine air inlet aerodynamic optimization. This workflow will be used to define the next generation of rotorcraft engine air inlets.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")


Temáticas Obligatorias del proyecto: Temática principal: Simulation tools and technologies HAA Helicopter Aero-acoustics AER Aerodynamics of External and Removable items TPA Turbomachinery / Propulsion Aerodynamics

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to set up a workflow dedicated to engine air inlet aerodynamic optimization. This workflow will be used to define the next generation of rotorcraft engine air inlets.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents") Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to set up a workflow dedicated to engine air inlet aerodynamic optimization. This workflow will be used to define the next generation of rotorcraft engine air inlets.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
        Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals".
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015).
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
        Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals".
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015).
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (SEP).
 
Additional provisions:
Clean Sky 2 Budget Flexibility:
See Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
 JTIs additional documents
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP01-2014-01 Tools development for aerodynamic optimization on engine air intake Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to...
Sin info.
JTI-CS2-2014-CFP01-FRC-02-02 Aerodynamic and functional design study of a full-fairing semi-watertight concept for an articulated rotor head
en consorcio: Scope:Within the Lifting Rotor activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader, from pre...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-FRC-02-01 Support to the aerodynamic and aeroelastic analysis of a trimmed, complete compound R/C and related issues
en consorcio: Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader, fr...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-FRC-02-05 HVDC Starter/Generator
en consorcio: Scope:Objective: to develop up to TRL6 a High Voltage Direct Current (HVDC) controlled Starter/Generator (S/G) intended to be installed on t...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-FRC-02-06 High Voltage Network Battery
en consorcio: Scope:The work consists of design, development, manufacturing, qualification and support of a prototype battery for flight tests. This batte...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-FRC-02-04 Tools development for aerodynamic optimization on engine air intake
en consorcio: Scope:Within the Digital Wind Tunnel activity line of the Fast RotorCraft IADP the selected partner is asked to support the topic leader to...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de