Innovating Works
S2R-CFM-IP2-01-2015
S2R-CFM-IP2-01-2015: Start-up activities for advanced signalling and automation system
Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Work Plan.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 17-03-2016.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Work Plan.


Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Work Plan. Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Work Plan.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
[Shift2Rail JU 2015 call for proposals]
Topic for S2R JU Members
Please read carefully all provisions below before the preparation of your application.
 
Full description of the topics: Shift2Rail JU 2015 Annual Work Plan (Annex I call for S2R members, Annex II call for non-members)
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the main H2020 Work Programme and the Shift2Rail JU 2015 Annual Work Plan.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the main H2020 Work Programme and the Shift2Rail JU 2015 Annual Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria, scoring and threshold: described in part H of the General Annexes and the Shift2Rail JU 2015 Annual Work Plan.
3.2 Submission and evaluation process: Guide to the submission and evaluation process and the Shift2Rail JU 2015 Annual Work Plan.
 
Indicative timetable for evaluation and grant agreement:
maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms:
Proposal templates for Shift2Rail JU members and non-members are available after entering the SEP submission tool
Shift2Rail Multi-Beneficiary Model Grant Agr...
[Shift2Rail JU 2015 call for proposals]
Topic for S2R JU Members
Please read carefully all provisions below before the preparation of your application.
 
Full description of the topics: Shift2Rail JU 2015 Annual Work Plan (Annex I call for S2R members, Annex II call for non-members)
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the main H2020 Work Programme and the Shift2Rail JU 2015 Annual Work Plan.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the main H2020 Work Programme and the Shift2Rail JU 2015 Annual Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria, scoring and threshold: described in part H of the General Annexes and the Shift2Rail JU 2015 Annual Work Plan.
3.2 Submission and evaluation process: Guide to the submission and evaluation process and the Shift2Rail JU 2015 Annual Work Plan.
 
Indicative timetable for evaluation and grant agreement:
maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms:
Proposal templates for Shift2Rail JU members and non-members are available after entering the SEP submission tool
Shift2Rail Multi-Beneficiary Model Grant Agreement 
Shift2Rail Mono-Beneficiary Model Grant Agreement
H2020 Annotated Grant Agreement (for information)
Standard evaluation form 
 
Additional provisions:
Horizon 2020 budget flexibility
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to third parties - where a topic description foresees financial support to Third Parties, these provisions apply.
 
Additional documents
Shift2Rail JU 2015 Annual Work Plan 
Shift2Rail Master Plan
Shift2Rail Multi Annual Action Plan (MAAP)
Shift2Rail Establishment Regulation
Shift2Rail Joint Undertaking Members
Horizon 2020 Rules for Participation
Horizon 2020 Regulation of Establishment
Horizon 2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-S2RJU-2015-01 Start-up activities for advanced signalling and automation system Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Wo...
Sin info.
S2R-CFM-IP2-01-2020 Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security
en consorcio: Specific Challenge:For the full topic description, please refer to Annex I of the 2020 Annual Work Plan (2020 Call for proposals for the JU...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
S2R-CFM-IP2-01-2019 Completion of activities for enhanced automation systems (including Freight ATO GoA4), train integrity, object controller (IP2 and IP5).
en consorcio: Specific Challenge:For the full topic description, please refer to Annex I of the 2019 Annual Work Plan (2019 Call for proposals for the JU...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
S2R-CFM-IP2-01-2018 Advanced Signalling, Automation and Communication System (IP2 and IP5)
en consorcio: Specific Challenge:For the full topic description, please refer to Annex I of the 2018 Annual Work Plan (2018 Call for proposals for the JU...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
S2R-CFM-IP2-01-2017 Enhancing railway signalling systems thanks to applying satellite positioning; developing an on-board safe Train Integrity; applying formal methods approach and standardised interfaces, and e
en consorcio: Specific Challenge:For the full topic description, please refer to Annex I (2017 Call for proposals for the JU members) of the 2017 Annual W...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
S2R-CFM-IP2-01-2015 Start-up activities for advanced signalling and automation system
en consorcio: Specific Challenge:For the full topic description please refer to Annex I (2015 Call for proposals for the JU members) of the 2015 Annual Wo...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de