Innovating Works
EEB-07-2017
EEB-07-2017: Integration of energy harvesting at building and district level
Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of different renewable energy sources at building and district scale.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 19-01-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of different renewable energy sources at building and district scale.

The envelope should be considered as an active and/or adaptive skin that interacts with the external environment and strongly influences the building energy performance and indoor comfort. Indeed, in view of a large-scale deployment of nearly-zero energy solutions in existing buildings, besides reducing energy demand through highly insulating materials and reduction measures, the possibility to harvest energy in the building envelope is of great importance.

The district dimension should be taken into account, both because of a higher potential for integration and optimisation of renewable energy sources, and because of the potential of additional energy harvesting approaches.


Scope:Proposals should aim at maximising the harvesting of renewable energy (for heating, cooling, electricity, domestic hot water, etc.) at building and district scale (e.g. exploiting large renewable energy source installations and heating and cooling networks). Res... ver más

Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of different renewable energy sources at building and district scale.

The envelope should be considered as an active and/or adaptive skin that interacts with the external environment and strongly influences the building energy performance and indoor comfort. Indeed, in view of a large-scale deployment of nearly-zero energy solutions in existing buildings, besides reducing energy demand through highly insulating materials and reduction measures, the possibility to harvest energy in the building envelope is of great importance.

The district dimension should be taken into account, both because of a higher potential for integration and optimisation of renewable energy sources, and because of the potential of additional energy harvesting approaches.


Scope:Proposals should aim at maximising the harvesting of renewable energy (for heating, cooling, electricity, domestic hot water, etc.) at building and district scale (e.g. exploiting large renewable energy source installations and heating and cooling networks). Research results should contribute to drastic energy saving and CO2 emission reduction while enabling massive replication in low zero energy buildings and energy self-sufficient districts. the focus is on a cost-effective and easy installation in a wide variety of buildings and surroundings.

Buildings are connected with various entities like suppliers and distribution system operators through different networks (internet, smart meter linked to the grid, energy storage systems, electric vehicles, etc.). Therefore, proposals should take into account an appropriate integration of monitoring and control systems for the developed solutions, combining, where relevant, additional functionalities such as safety and security.

Proposals should be flexible enough to cope with different designs and architectural concepts, with components being especially shaped and integrating different material combinations (such as glass, pre-casted elements, membranes).

The modular dimension is important to allow a cost-effective and easy installation in a wide variety of buildings and processing practices.

Proposals should enable a reduction of maintenance and operation costs, in particular when many sensors and actuators are cost-effectively distributed throughout the envelope.

Applicability in different geographical areas is important.

Clear evidence of technical and economic viability should be provided by validating and demonstrating the proposed adaptable envelope in real case retrofitting projects.

Activities are expected to focus on Technology Readiness Levels 5 to 7 and to be centred around TRL 6.

A significant participation of SMEs with R&D capacities is encouraged.

The Commission considers that proposals requesting a contribution from the EU between 4 and 6 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requiring other amounts.


Expected Impact: The cost related to new technologies should not exceed conventional standard building costs by more than 20%. Demonstration of the replicability potential in a real case-study. Solutions with a payback period of below 10 years. The integrated harvesting systems will cover at least 30-40 % of the overall energy demand for new buildings and 20% for renovated buildings. Proposals should include a business case and exploitation strategy, as outlined in the Introduction to the LEIT part of this Work Programme.


Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)EeB


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Energy efficiency - general Energy management in buildings Energy efficient buildings

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of different renewable energy sources at building and district scale. Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of different renewable energy sources at building and district scale.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
 
LIST OF COUNTRIES and APPLICABLE RULES FOR FUNDING:
described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to Australia, Brazil, Canada, China, Hong Kong &Macau, India, Japan, Republic of Korea, Mexico, Russia, Taiwan).
 
ELIGIBILITY and ADMISSIBILITY CONDITIONS:
described in part B and C of the General Annexes of the General Work Programme
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
EVALUATION
3.1  Evaluation criteria and procedure, scoring and threshold:
The criteria, scoring and threshold are described in General Annex H of the work programme.
The following exceptions apply:
For single-stage and second-stage evaluations, the threshold for the criteria Excellence and Impact will be 4. The overall threshold, applying to the sum of the three individual scores, will be 12.
The procedure for setting a priority order for proposals with the same score is given in General Annex H of the work programme. The following exceptions apply:<...
Please read carefully all provisions below before the preparation of your application.
&nbsp;
LIST&nbsp;OF&nbsp;COUNTRIES and APPLICABLE&nbsp;RULES&nbsp;FOR&nbsp;FUNDING:
described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to Australia, Brazil, Canada, China, Hong Kong &amp;Macau, India, Japan, Republic of Korea, Mexico, Russia, Taiwan).
&nbsp;
ELIGIBILITY and ADMISSIBILITY CONDITIONS:
described in part B and C of the General Annexes of the General Work Programme
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
&nbsp;
EVALUATION
3.1&nbsp; Evaluation criteria and procedure, scoring and threshold:
The criteria, scoring and threshold are described in General Annex H of the work programme.
The following exceptions apply:
For single-stage and second-stage evaluations, the threshold for the criteria Excellence and Impact will be 4. The overall threshold, applying to the sum of the three individual scores, will be 12.
The procedure for setting a priority order for proposals with the same score is given in General Annex H of the work programme. The following exceptions apply:
Under 3 (a)
Proposals are first ranked in separate lists according to the topics against which they were submitted (&lsquo;topic ranked lists&rsquo;). When comparing ex aequo proposals from different topics, proposals having a higher position in their respective 'topic ranked list' will be considered to have a higher priority in the overall ranked list.
Under 3 (b)
For all topics and types of action, the prioritisation will be done first on the basis of the score for Impact, and then on that for Excellence.
3.2&nbsp;Submission and evaluation process: Guide to the submission and evaluation process
&nbsp; &nbsp; &nbsp;&nbsp;
INDICATIVE TIMETABLE&nbsp;for EVALUATION and GRANT&nbsp;AGREEMENT:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
&nbsp;
&nbsp;
PROVISIONS, PROPOSAL&nbsp;TEMPLATES and EVALUATION FORMS
for the type of action under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
H2020 General MGA -Multi-Beneficiary
Annotated Grant Agreement
&nbsp;
ADDITIONAL&nbsp;PROVISIONS:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) &ndash; where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties &ndash; where a topic description foresees financial support to Third Parties, these provisions apply.
&nbsp;
OPEN&nbsp;ACCESS
Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
-&nbsp; Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs.
-&nbsp; Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
&nbsp;
&nbsp;ADDITIONAL DOCUMENTS
Legal basis: Horizon 2020 - Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
H2020 Work Programme 2016-17: Introduction
H2020 Work Programme 2016-17: Introduction to Leadership in enabling and industrial technologies (LEITs)
H2020 Work Programme 2016-17: Nanotechnologies, advanced materials, advanced manufacturing and processing, biotechnology
H2020 Work Programme 2016-17: Cross-cutting activities (Focus Areas)
H2020 Work Programme 2016-17: Dissemination, Exploitation and Evaluation
H2020 Work Programme 2016-17: General Annexes
&nbsp;
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EEB-2016-2017 Integration of energy harvesting at building and district level Specific Challenge:Integration of energy harvesting approaches is a major challenge, in particular the development and integration of differ...
Sin info.
LC-EEB-07-2020 Smart Operation of Proactive Residential Buildings (IA)
en consorcio: Specific Challenge:Rising energy costs and an increasing focus on environmental performance create challenges in building energy management...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-EEB-04-2020 Industrialisation of building envelope kits for the renovation market (IA)
en consorcio: Specific Challenge:A wide range of products dedicated to insulation, energy supply and comfort are available on the market. However, their i...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-EEB-08-2020 Digital Building Twins (RIA)
en consorcio: Specific Challenge:Construction industry in the European Union needs to follow the latest technological developments going beyond Building I...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-EEB-05-2019-20 Integrated storage systems for residential buildings (IA)
en consorcio: Specific Challenge:Optimised storage solutions for thermal and electric energy are needed in order to better synchronise the overall supply...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LC-EEB-03-2019 New developments in plus energy houses (IA)
en consorcio: Specific Challenge:Energy Efficiency targets set at EU level by legislation are currently being reviewed. The related SET-Plan rolls out con...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de