Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to the design of a main landing gear bay for a landing gear attached to the fuselage. The most promising solution has to be found disregarding the load compatibility, the best material utilization through a quantitative assessment, taking into account manufacturing requirement (recurring cost, high production rate, process stability…) at high level of integration for design to cost. Please refer to the full and formal topic descriptions published in this call.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 18-11-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to the design of a main landing gear bay for a landing gear attached to the fuselage. The most promising solution has to be found disregarding the load compatibility, the best material utilization through a quantitative assessment, taking into account manufacturing requirement (recurring cost, high production rate, process stability…) at high level of integration for design to cost. Please refer to the full and formal topic descriptions published in this call.


Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to the design of a main landing gear bay for a landing gear attached to the fuselage. The most promising solution has to be found disregarding the load compatibility, the best material utilization through a quantitative assessment, taking into account manufacturing requirement (recurring cost, high production rate, process stability…) at high level of integration for design to cost. Please refer to the full and formal topic descriptions published in this call. Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to the design of a main landing gear bay for a landing gear attached to the fuselage. The most promising solution has to be found disregarding the load compatibility, the best material utilization through a quantitative assessment, taking into account manufacturing requirement (recurring cost, high production rate, process stability…) at high level of integration for design to cost. Please refer to the full and formal topic descriptions published in this call.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call: 
Proposal templates are accessed via the proposal submission system (SEP).
 
 Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
JTIs additional documents:
Clean Sky 2 Joint Technical Programme...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call: 
Proposal templates are accessed via the proposal submission system (SEP).
 
 Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
JTIs additional documents:
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU – Regulation of establishment
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP02-2015-01 Integrated main landing gear bay Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to...
Sin info.
JTI-CS2-2015-CFP02-LPA-01-05 Validation of aero-vibro-acoustic model on new aerodynamic configurations.
en consorcio: Specific Challenge:Due to new fuselage shape and different cruise mach numbers, this project aims at improving knowledge on turbulent bounda...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2015-CFP02-LPA-01-07 Design, test and manufacturing of robust fluidic actuators
en consorcio: Specific Challenge:Design, test and manufacturing of robust, energy-efficient, aerodynamically effective actuators without moving parts for...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2015-CFP02-LPA-01-04 Active technologies for acoustic and vibration comfort
en consorcio: Specific Challenge:To progress on airframe efficiency while supporting the high level of the customer comfort requested, new technologies of...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2015-CFP02-LPA-03-06 Head Up System integration in next generation cockpits
en consorcio: Specific Challenge:The Head Up Display is now becoming more and more a standard equipment in aircraft, both for economical reasons (the cost...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2015-CFP02-LPA-02-09 Integrated main landing gear bay
en consorcio: Specific Challenge:This topic aims at developing a new generation of Lower Center Fuselage, with a Body Landing Gear. This topic relates to...
Cerrada hace 9 años | Próxima convocatoria prevista para el mes de