Innovating Works
SESAR-VLD1-04-2016
SESAR-VLD1-04-2016: Initial Trajectory Information sharing
Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajectory based on the downlinking of the Automatic Dependent Surveillance (Contract) (ADS-C) Aeronautical Telecommunications Surveillance Baseline 2 (ATN B2) Extended Projected Profile (EPP) data from aircraft to the ground systems, in accordance with the provisions of the PCP AF#6.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 11-05-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajectory based on the downlinking of the Automatic Dependent Surveillance (Contract) (ADS-C) Aeronautical Telecommunications Surveillance Baseline 2 (ATN B2) Extended Projected Profile (EPP) data from aircraft to the ground systems, in accordance with the provisions of the PCP AF#6.

With reference to the SJU Annual Work Programme 2016, this topic covers Section 3.5.4, sub Work area 2.1 topic d).

The collection of ADS-C data from revenue flights operated from different AUs in a variety of operational conditions is necessary in order to understand the impact of a diversity of operating practices on the data that is effectively downlinked. This will allow the fine tuning of the requirements for the integration of the downlinked data into the ground systems.


Scope:Initial trajectory sharing has been researched in the SESAR programme. Full details of the SESAR Solutions can be found on the SESAR web site[1] or in the Solutions Catalogue[2]. As a guide, SESAR solution 115 “Initial Trajectory Information Shari... ver más

Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajectory based on the downlinking of the Automatic Dependent Surveillance (Contract) (ADS-C) Aeronautical Telecommunications Surveillance Baseline 2 (ATN B2) Extended Projected Profile (EPP) data from aircraft to the ground systems, in accordance with the provisions of the PCP AF#6.

With reference to the SJU Annual Work Programme 2016, this topic covers Section 3.5.4, sub Work area 2.1 topic d).

The collection of ADS-C data from revenue flights operated from different AUs in a variety of operational conditions is necessary in order to understand the impact of a diversity of operating practices on the data that is effectively downlinked. This will allow the fine tuning of the requirements for the integration of the downlinked data into the ground systems.


Scope:Initial trajectory sharing has been researched in the SESAR programme. Full details of the SESAR Solutions can be found on the SESAR web site[1] or in the Solutions Catalogue[2]. As a guide, SESAR solution 115 “Initial Trajectory Information Sharing” is the most relevant solution demonstration activity. Note that Solution 115 is under development and is, at the time of writing, not yet published.

The airborne trajectory prediction done by the Flight Management System (FMS) takes into account flight performance data that is updated in real time during the execution phase, such as descent planning information, aircraft weight, and the most updated temperature and wind predictions. This solution allows the downlinking of data based on the airborne trajectory prediction using the Extended Projected Profile (EPP), as defined by the Aeronautical Telecommunications Network Baseline 2 (ATN B2). The downlinked data is used by the ground systems to enrich their trajectory prediction.

The topic is subject to on-going Industrial Research (IR) and Very Large Scale Demonstration (VLD) activities within the SESAR 2020 programme. This project must ensure that its activities are coordinated with parallel projects working in this area. In particular, this action follows on from the project PJ31 DIGITS funded under call H2020-SESAR-2015-2. Consortia applying for this topic must include at least one AU, and may include additional entities provided their role in supporting the demonstration from the AU perspective is adequately justified in the proposal.

Demonstration flights shall take place in the area controlled by the following ACCs: Maastricht, Karlsruhe and London. Participating Airspace Users (AU) will not need to dispatch any flights for the sole purpose of the demonstrations, i.e. participation shall always be through revenue flights. It is desirable that a variety of airframes participate in this demonstration, so as to be representative of the fleet operating in the International Civil Aviation Organization (ICAO) EUR region. Applicants should demonstrate how their flying programme will provide the benefits expected to be derived from the project.

It is a pre-requisite for each airframe taking part in this demonstration that it is equipped with datalink able to deliver “Best in Class” performance as defined by the ELSA report [8] Each airframe taking part in this demonstration will need to be equipped with ATN B2 communications equipment, potentially including the full automatic upload onto the FMS of uplinked Controller Pilot Datalink Communications (CPDLC) commands. ATN B2 upgraded aircraft will need to retain their ATN B1 equipment, and will need to be capable of either switching between one and the other or operating them in parallel as required by the demonstration. The upgrade of Flight Management Systems (FMS) to DO236C standards may also be necessary.

The final equipment and configuration will need to have final airworthiness approval by EASA. The cost of those upgrades to the avionics that are necessary for the demonstration will be eligible for co-financing under this grant.

During the demonstration flights, flight crews will be required to perform the tasks associated with the management of the newly installed equipment, but will otherwise be expected to conduct their flights as usual in order to provide realistic data for the operational evaluation of the concept of air/ground trajectory synchronization. The demonstration may include the uplink through ATB B2 CPDLC of 3D routes (e.g. descent routes with constraint along the way). 3D routes may be uplinked without a clearance (e.g. through EXPECT CPLDC messages) in accordance with the innovative share-the-ground-plan concept, in order to allow the FMS to anticipate the descent profile before a clearance can be effectively delivered by ATC.

The expected involvement of consortia answering to this open call shall be in accordance to the following requirements:

AUs shall perform the demonstrations in collaboration with parallel demonstration projects dealing with the same subject to develop the concept of the demonstrations, participation in activities preparing the trials, participation in periodic follow-up meetings, production of all the documentation related to the demonstration as well as results dissemination and communication activities. Output from the demonstration shall include a report by each participating AU containing a full analysis of the impact of the procedures on AU performance.

Participating AUs will not need to dispatch any flights for the sole purpose of the demonstrations, i.e. participation shall always be through revenue flights. Participating AUs shall provide to the ANSP relevant data from their revenue flights for the operational evaluation of the performance of the concepts under demonstration. These data may include, among others, questionnaires or other feedback by airline staff (flight-crews and/or Airline Operations Centre (AOC) personnel), fuel burn data (potentially including suitably aggregated and de-identified FDR data), scheduling and punctuality data and descent efficiency data.

In addition to the aforementioned data, it would be preferable that a log of how each individual demonstration flight was managed (flight crew FMS/Flight Control Unit (FCU) automatically-recorded flight-crew input log and data and voice communications log) was made available for the portion of the flight in which the demonstration takes place. This detailed log is valuable in order to perform a comparison against the downlinked EPP data logs, with the objective of better understanding the interrelation of operational flight management actions and the data that is downlinked from the aircraft. AUs applying for this call must specify in their bid if they will provide these logs, and if so they must also describe how they will ensure that the confidentiality and access rights of the participating flight crews are respected.


Expected Impact:This demonstration will pave the way for the implementation of the AF6 of the PCP. The synchronization of the air and ground trajectories is expected to bring benefits in terms of flight efficiency, mainly by enabling better descent profiles and improved arrival sequencing. The better quality of the ground trajectory prediction will also allow the improvement of the tools that support controllers, thereby increasing ANS productivity. Results of the demonstration should quantify performance improvements resulting from the demonstration flights, using, as a minimum, relevant KPAs from the performance framework defined in the ATM Master Plan.


[1]http://www.sesarju.eu/solutions

[2]http://www.sesarju.eu/newsroom/all-news/sesar-solutions-catalogue-and-interactive-map

ver menos

Temáticas Obligatorias del proyecto: Temática principal: FDR Flight Data/Flight Recording FCM Flow and Capacity Management APT Airport Traffic Management CSY Communications Systems OVA Overall ATM AMG Airspace Management Navigation Systems NAV Navigation / Flight Management / Autoland CST Communications and Systems Technology AAS ATM Automated Support

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajectory based on the downlinking of the Automatic Dependent Surveillance (Contract) (ADS-C) Aeronautical Telecommunications Surveillance Baseline 2 (ATN B2) Extended Projected Profile (EPP) data from aircraft to the ground systems, in accordance with the provisions of the PCP AF#6. Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajectory based on the downlinking of the Automatic Dependent Surveillance (Contract) (ADS-C) Aeronautical Telecommunications Surveillance Baseline 2 (ATN B2) Extended Projected Profile (EPP) data from aircraft to the ground systems, in accordance with the provisions of the PCP AF#6.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme and in the SJU Annual Work Programme.
Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in the SJU Annual Work Programme. 
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s)...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme and in the SJU Annual Work Programme.
Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in the SJU Annual Work Programme. 
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form 
SJU Model Grant Agreement 
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
This topic participates per default in the open access to research data pilot which aims to improve and maximise access to and re-use of research data generated by projects:
- The pilot applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available for open access and need to describe their approach in a Data Management Plan (to be provided within six months after the project start).
- Note that the evaluation phase proposals will not be evaluated more favourably because they are part of the Pilot, and will not be penalised for opting out of the Pilot.
- Projects can at any stage opt-out of the pilot.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
Further information on the Open Research Data Pilot is made available in the H2020 Online Manual.
 
SJU Additional documents:
 
ER/VLD Call Technical Specifications
SJU Annual Work Programme
ATM Master Plan
Project Execution Guidance for SESAR 2020 VLD (VLD1)
Horizon 2020 Rules for Participation
Horizon 2020 Regulation of Establishment
Horizon 2020 Specific Programme  
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-SESAR-2016-2 Initial Trajectory Information sharing Specific Challenge:This demonstration will demonstrate the airborne aspects of the synchronization of the air and ground views of the trajec...
Sin info.
SESAR-VLD1-01-2016 Arrival Management Extended to En-route airspace
en consorcio: Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Managemen...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
SESAR-VLD1-02-2016 Integrated Airport
en consorcio: Specific Challenge:This demonstration project will coordinate the Airspace User (AU) involvement in the demonstration of innovative airport...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
SESAR-VLD1-07-2016 Applications for trajectory based and queue management using EPP extended into oceanic/intercontinental operations: inter-continental trajectory based operations enabled by Satellite based CN
en consorcio: Specific Challenge:Aviation is a global industry and interoperability together with global harmonisation are key for its safe and sustained...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
SESAR-VLD1-03-2016 Network collaborative Management
en consorcio: Specific Challenge:Network Collaborative Management (NCM) processes includes the participation of local actors in Air Traffic Flow Control M...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
SESAR-VLD1-10-2016 Safe integration of drones
en consorcio: Specific Challenge: This topic aims at performing demonstration activities for identifying quick-win solutions enabling the safe integration...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de