Innovating Works
SESAR-VLD1-01-2016
SESAR-VLD1-01-2016: Arrival Management Extended to En-route airspace
Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Management systems (AMAN) with an extended horizon in accordance with the Pilot Common Project (PCP)[1] First Air Traffic Management (ATM) Functionality (AF#1), as well as the demonstration of AU involvement in the operation of two AMAN-related advanced concepts: the Target Time (TT) management concept and the Arrival Flexibility (A-FLEX) concept, which connect the Extended AMAN concept to the PCP Fourth ATM Functionality (AF#4).
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 11-05-2017.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Management systems (AMAN) with an extended horizon in accordance with the Pilot Common Project (PCP)[1] First Air Traffic Management (ATM) Functionality (AF#1), as well as the demonstration of AU involvement in the operation of two AMAN-related advanced concepts: the Target Time (TT) management concept and the Arrival Flexibility (A-FLEX) concept, which connect the Extended AMAN concept to the PCP Fourth ATM Functionality (AF#4).

With reference to the SJU Annual Work Programme 2016, this topic covers Section 3.5.4, sub Work area 2.1 topic a).

Specific challenge

The use of an extended horizon for Arrival Management (AMAN) creates an overlap in terms of look-ahead time between queue management processes and Air Traffic Flow Control Management (ATFCM) Target Time (TT) management processes, as well as introducing an increased need for cross-border coordination. These challenges also create new opportunities for the development of operating methods that make it possible the increased participation of AUs through Collabo... see more

Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Management systems (AMAN) with an extended horizon in accordance with the Pilot Common Project (PCP)[1] First Air Traffic Management (ATM) Functionality (AF#1), as well as the demonstration of AU involvement in the operation of two AMAN-related advanced concepts: the Target Time (TT) management concept and the Arrival Flexibility (A-FLEX) concept, which connect the Extended AMAN concept to the PCP Fourth ATM Functionality (AF#4).

With reference to the SJU Annual Work Programme 2016, this topic covers Section 3.5.4, sub Work area 2.1 topic a).

Specific challenge

The use of an extended horizon for Arrival Management (AMAN) creates an overlap in terms of look-ahead time between queue management processes and Air Traffic Flow Control Management (ATFCM) Target Time (TT) management processes, as well as introducing an increased need for cross-border coordination. These challenges also create new opportunities for the development of operating methods that make it possible the increased participation of AUs through Collaborative Decision Making (CDM) Processes, including A-FLEX processes. The active involvement of AUs in this demonstration is needed for the evaluation in a live environment of these concepts and the quantification of their benefits.


Scope:Extended AMAN and TT management have been subject to research and development in the SESAR programme, with deployment-ready results published as solution packs (SESAR Solution 5, Extended Arrival Management Horizon, and SESAR solution 18, Calculated Takeoff Time (CTOT) and Target Time of Arrival (TTA)). The Extended AMAN, the AFLEX and the TT management concepts are subject to continuing current Industrial Research (IR) and Very Large Scale Demonstration (VLD) activities within the SESAR 2020 programme. This project will demonstrate the airspace user perspective of these concepts, and it must ensure that its activities are to be coordinated with parallel projects working in this area. In particular, this action follows on from the Project PJ25 XSTREAM funded under call H2020-SESAR-2015-2.

Consortia applying to this topic must include at least one AU, and they may include additional entities provided their role in supporting the demonstration from the AU perspective is adequately justified in the proposal. Participation of AUs with a variety of airframe/engine configurations so as to be representative of the fleet composition currently operating in Europe is considered as significant added value. Applicants should demonstrate how their flying programme will provide the benefits expected to be derived from the project.

For the Extended AMAN trials there is no need for specific avionics equipment beyond what is currently required for operating in European airspace, and there will be no need for updating Airline Operations Centre (AOC) systems either. For the demonstration of the TT management and A-FLEX concepts, no avionics modifications are required, but AOC systems and processes may need to be updated.

AUs shall perform the demonstrations in collaboration with parallel demonstration projects dealing with the same subject to develop the concept of the demonstrations, participation in activities preparing the trials, participation in periodic follow-up meetings, production of all the documentation related to the demonstration as well as results dissemination and communication activities. Output from the demonstration shall include a report by each participating AU containing a full analysis of the impact of the procedures on AU performance.

Participating AUs will not need to dispatch any flights for the sole purpose of the demonstrations, i.e. participation shall always be through revenue flights. The demonstration flights shall land at the following major European Hubs: London Heathrow and Gatwick, Paris CDG/ORLY, or Zurich; their route must overfly one or more of the following ACCs: Maastricht, Reims, Paris, London, Karlsruhe, Brest, Shannon, Prestwick, Langen, Munich, Genève, Marseille, or Bordeaux.

The consortium shall provide support to the ANSPs running the demonstrations in which they participate through this grant all along the demonstration lifecycle. This expected support includes collaboration for developing the concept of the demonstrations, participation in activities preparing the trials, periodic follow-up meetings and support for the production of all the documentation related to the demonstration, as well as participation in the demonstration dissemination and communication activities. Output from the demonstration shall include a report by each participating AU containing a full analysis of the impact of the procedures on AU performance.

The consortium shall provide to the ANSP running the demonstrations in which they participate relevant data from their demonstration flights for the operational evaluation of the performance of the concepts under demonstration. These data may include, among others, questionnaires or other feedback by airline staff (flight-crews and/or Airline Operations Centre (AOC) personnel), fuel burn data (potentially including suitably aggregated and de-identified FDR data), scheduling and punctuality data and descent efficiency data.

Applicants should note that all flights operating in the areas where SESAR extended AMAN demonstrations are taking place will need to comply with all instructions issued by ATC that originate from the extended AMAN concept (typically speed commands or lateral route revisions).


Expected Impact:The demonstration will pave the way for implementing the E-AMAN as required in the PCP Regulation i.e. within an integrated global collaborative management of arrivals, including Airports, ACCs and Airlines, as well as for the implementation of the related advanced concepts AFLEX and advanced TT management. The objective is to reduce ATFCM and Arrival Sequencing and Metering Area (ASMA) delays in the TMA/E-TMA and also to increase flight efficiency. Results of the demonstration should quantify performance improvements resulting from the demonstration flights, using, as a minimum, relevant KPAs from the performance framework defined in the ATM Master Plan.


[1]EC IR (EU) No 716/2014

see less

Temáticas Obligatorias del proyecto: Temática principal: APT Airport Traffic Management OVA Overall ATM ALO Airline Operations FCM Flow and Capacity Management AAS ATM Automated Support APO Airport Operations

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Management systems (AMAN) with an extended horizon in accordance with the Pilot Common Project (PCP)[1] First Air Traffic Management (ATM) Functionality (AF#1), as well as the demonstration of AU involvement in the operation of two AMAN-related advanced concepts: the Target Time (TT) management concept and the Arrival Flexibility (A-FLEX) concept, which connect the Extended AMAN concept to the PCP Fourth ATM Functionality (AF#4). Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Management systems (AMAN) with an extended horizon in accordance with the Pilot Common Project (PCP)[1] First Air Traffic Management (ATM) Functionality (AF#1), as well as the demonstration of AU involvement in the operation of two AMAN-related advanced concepts: the Target Time (TT) management concept and the Arrival Flexibility (A-FLEX) concept, which connect the Extended AMAN concept to the PCP Fourth ATM Functionality (AF#4).
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme and in the SJU Annual Work Programme.
Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in the SJU Annual Work Programme. 
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s)...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme and in the SJU Annual Work Programme.
Proposal page limits and layout: Please refer to Part B of the SJU proposal template in the electronic submission system
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in the SJU Annual Work Programme. 
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form 
SJU Model Grant Agreement 
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
This topic participates per default in the open access to research data pilot which aims to improve and maximise access to and re-use of research data generated by projects:
- The pilot applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available for open access and need to describe their approach in a Data Management Plan (to be provided within six months after the project start).
- Note that the evaluation phase proposals will not be evaluated more favourably because they are part of the Pilot, and will not be penalised for opting out of the Pilot.
- Projects can at any stage opt-out of the pilot.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
Further information on the Open Research Data Pilot is made available in the H2020 Online Manual.
 
SJU Additional documents:
 
ER/VLD Call Technical Specifications
SJU Annual Work Programme
ATM Master Plan
Project Execution Guidance for SESAR 2020 VLD (VLD1)
Horizon 2020 Rules for Participation
Horizon 2020 Regulation of Establishment
Horizon 2020 Specific Programme  
 
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-SESAR-2016-2 Arrival Management Extended to En-route airspace Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Managemen...
Sin info.
SESAR-VLD1-01-2016 Arrival Management Extended to En-route airspace
en consorcio: Specific Challenge:The demonstration will demonstrate the benefits for Airspace User (AU) in the operation of cross-border Arrival Managemen...
Cerrada does 7 years | next call scheduled for the month of
SESAR-VLD1-02-2016 Integrated Airport
en consorcio: Specific Challenge:This demonstration project will coordinate the Airspace User (AU) involvement in the demonstration of innovative airport...
Cerrada does 7 years | next call scheduled for the month of
SESAR-VLD1-07-2016 Applications for trajectory based and queue management using EPP extended into oceanic/intercontinental operations: inter-continental trajectory based operations enabled by Satellite based CN
en consorcio: Specific Challenge:Aviation is a global industry and interoperability together with global harmonisation are key for its safe and sustained...
Cerrada does 7 years | next call scheduled for the month of
SESAR-VLD1-03-2016 Network collaborative Management
en consorcio: Specific Challenge:Network Collaborative Management (NCM) processes includes the participation of local actors in Air Traffic Flow Control M...
Cerrada does 7 years | next call scheduled for the month of
SESAR-VLD1-10-2016 Safe integration of drones
en consorcio: Specific Challenge: This topic aims at performing demonstration activities for identifying quick-win solutions enabling the safe integration...
Cerrada does 7 years | next call scheduled for the month of