Innovating Works
JTI-CS2-2016-CFP03-LPA-01-15
JTI-CS2-2016-CFP03-LPA-01-15: High Fidelity time-accurate CFD Simulations
Specific Challenge:
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 02-06-2016.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Specific Challenge:

The framework is given by applying pulsed air blowing with Zero Net Mas Flux (ZNMF) to control the flow separation at the engine/pylon junction. For this application the objective of the partner is to determine the optimal flow control actuation parameters. These parameters presume a deep insight into the partially unknown flow phenomena of interacting shear layers and vortices to be obtained with high fidelity time-accurate numerical simulations for provided relevant configurations and under relevant conditions. For the full topic description see the Call Text Document (Annex of Workplan) published with this call.

Temáticas Obligatorias del proyecto: Temática principal: CFD Computational Fluid Dynamics

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge: Specific Challenge:
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call:
The proposal templates will be available in the submission system (SEP).
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Anne...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call:
The proposal templates will be available in the submission system (SEP).
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Background documents:
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
Clean Sky 2 Summary list of topics in the call 2014
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP03-2016-01 High Fidelity time-accurate CFD Simulations Specific Challenge: The framework is given by applying pulsed air blowing with Zero Net Mas Flux (ZNMF) to control the flow separa...
Sin info.
JTI-CS2-2016-CFP03-LPA-01-13 Manufacturing of prototype elements for hybridation of titanium and epoxy resin - Characterisation of the Titanium TiCP40 - CFRP adhesive joint
en consorcio: Specific Challenge: The objective of this call for proposal is the manufacturing, development and experimental testing for the cha...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2016-CFP03-LPA-01-12 High cycle fatigue prediction methodology for fiber reinforced laminates for aircraft structures in CROR environment – development and validation
en consorcio: Specific Challenge: For the design of airframe structure regions facing CROR blades, the reinforcement of CFRP has to be laid out...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2016-CFP03-LPA-01-16 Aerodynamic Isolated and Installed Methods for UHBR Adaptable Area Nozzles
en consorcio: Specific Challenge: The aim of the project is to experimentally evaluate the performance and installation effects of Ultra High By...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2016-CFP03-LPA-02-12 Development of System Components for automated Cabin and Cargo Installation
en consorcio: Specific Challenge: Development of modular system components and accomplishment of feasibility and validation tests with respect t...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2016-CFP03-LPA-01-15 High Fidelity time-accurate CFD Simulations
en consorcio: Specific Challenge: The framework is given by applying pulsed air blowing with Zero Net Mas Flux (ZNMF) to control the flow separa...
Cerrada does 9 years | next call scheduled for the month of