LCE-30-2017
LCE-30-2017: Geological storage pilots
Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). A key challenge in the short-term for driving CCS to deployment is the development of geological storage.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 05-01-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). A key challenge in the short-term for driving CCS to deployment is the development of geological storage.


Scope:Projects should enable, under "real life" conditions, the development and demonstration of best practices for the entire storage cycle, from site characterisation to operation, including key components of CO2 transport infrastructure, monitoring and mitigation/remediation of leakage, and including education and training.

Focus should be on progressing technologies that already reached TRL 4-5 to TRL 6 (please see part G of the General Annexes).

Knowledge sharing with a wide range of stakeholders, as well... ver más

Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). A key challenge in the short-term for driving CCS to deployment is the development of geological storage.


Scope:Projects should enable, under "real life" conditions, the development and demonstration of best practices for the entire storage cycle, from site characterisation to operation, including key components of CO2 transport infrastructure, monitoring and mitigation/remediation of leakage, and including education and training.

Focus should be on progressing technologies that already reached TRL 4-5 to TRL 6 (please see part G of the General Annexes).

Knowledge sharing with a wide range of stakeholders, as well as early and sustained engagement and involvement of concerned communities through targeted information and dissemination activities, is essential.

In this particular context, new types of interactions between societal actors are encouraged. Projects should identify the key drivers and influencers of public attitude, identify distorted perceptions and develop sound arguments to address them.

International cooperation is encouraged, in particular activities between EU project(s) under this topic and non-EU projects (e.g. from Australia and/or North-America).

The Commission considers that proposals requesting a contribution from the EU in the range of EUR 9 to 16 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:Demonstration of safe and environmentally sound CO2 storage will play a key role in optimising the safe operation of storage sites and in fine-tuning regulatory issues, in promoting confidence in CO2 storage and building public awareness of CCS. Pilot-scale demonstration projects should contribute to accelerating the development and deployment of CCS through an enhanced and effective cooperation in research and innovation between various stakeholders and Member States/Associated Countries, thereby allowing a more efficient use and stronger leverage of financial resources and promoting knowledge sharing.


Cross-cutting Priorities:International cooperation


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). A key challenge in the short-term for driving CCS to deployment is the development of geological storage. Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). A key challenge in the short-term for driving CCS to deployment is the development of geological storage.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
IMPORTANT: Please also read the introductory policy context for the activity TOWARDS AN INTEGRATED EU ENERGY SYSTEM of the COMPETITIVE LOW CARBON ENERGY call under the Societal Challenge 3 'Secure, Clean and Efficient Energy' of the Work Programme 2016 - 2017.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process.
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadli...
Please read carefully all provisions below before the preparation of your application.
IMPORTANT: Please also read the introductory policy context for the activity TOWARDS AN INTEGRATED EU ENERGY SYSTEM of the COMPETITIVE LOW CARBON ENERGY call under the Societal Challenge 3 'Secure, Clean and Efficient Energy' of the Work Programme 2016 - 2017.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process.
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
H2020 General MGA -Multi-Beneficiary
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
- Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs.
- Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Additional documents
H2020 Work Programme 2016-17: Introduction
H2020 Work Programme 2016-17: Secure, clean and efficient energy
H2020 Work Programme 2016-17: Dissemination, Exploitation and Evaluation
H2020 Work Programme 2016-17: General Annexes
Legal basis: Horizon 2020 - Regulation of Establishment 
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
Please note that the topic LCE-01-2016-2017 will open again on 20/09/2016 with the deadline of 14/02/2017, subject to the final decision on 2017 budget appropriations.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LCE-2016-2017 Geological storage pilots Specific Challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuel...
Sin info.
LCE-03-2014 Demonstration of renewable electricity and heating/cooling technologies
en consorcio:
Cerrada hace 3 años | Próxima convocatoria prevista para el mes de
LCE-Prize-CO2Reuse-01-2016 Horizon prize for CO2 reuse
en consorcio: Specific Challenge:Preventing dangerous climate change is a key priority for the European Union. Europe is working hard to cut its greenhous...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-RenewableHospital-01-2016 Horizon prize for a Combined Heat and Power (CHP) Installation in a hospital using 100% Renewable Energy Sources
en consorcio: Specific Challenge:The integration and use of renewable energy in buildings for heat and power generation still encounter unsolved technolog...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-PhotovoltaicsHistory-01-2016 Horizon prize for Integrated Photovoltaic System in European Protected Historic Urban districts
en consorcio: Specific Challenge:In Europe, architectural and planning rules for protected historic buildings lead to major technical constrains in integr...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-20-2016-2017 Enabling pre-commercial production of advanced aviation biofuel
en consorcio:
Cerrada hace 7 años | Próxima convocatoria prevista para el mes de