Innovating Works
SESAR-ER4-05-2019
SESAR-ER4-05-2019: Environment and Meteorology for ATM
Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the improvements to be derived from new aircraft and engine technologies. Research is needed to better understand the ways in which ATM can help reduce the impact of aviation on the environment, considering not only fuel burn but other aspects such as CO and NOx and contrails.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 10-09-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the improvements to be derived from new aircraft and engine technologies. Research is needed to better understand the ways in which ATM can help reduce the impact of aviation on the environment, considering not only fuel burn but other aspects such as CO and NOx and contrails.

Also, over the last few years important improvements in observational (e.g., satellites, LIDARs) and numerical weather prediction (NWP) models in the atmospheric sciences have taken place leading to improved meteorological products, however they are not in systematic use by ATM actors. Increasingly weather is becoming a significant causal factor for delay, in the Network Operations Report for 2017 (issued by the Network Manager) it is stated “A great number of en-route weather events combined with capacity and staffing issues in some ACCs accounted for much of the delay in 2017. En-route weather delay increased by 30% compared to 2016 and was the double of 2015 weather delay. Airport ATFM delay decreased by 3.6% in 2017. Airport capacity and weather contributed... ver más

Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the improvements to be derived from new aircraft and engine technologies. Research is needed to better understand the ways in which ATM can help reduce the impact of aviation on the environment, considering not only fuel burn but other aspects such as CO and NOx and contrails.

Also, over the last few years important improvements in observational (e.g., satellites, LIDARs) and numerical weather prediction (NWP) models in the atmospheric sciences have taken place leading to improved meteorological products, however they are not in systematic use by ATM actors. Increasingly weather is becoming a significant causal factor for delay, in the Network Operations Report for 2017 (issued by the Network Manager) it is stated “A great number of en-route weather events combined with capacity and staffing issues in some ACCs accounted for much of the delay in 2017. En-route weather delay increased by 30% compared to 2016 and was the double of 2015 weather delay. Airport ATFM delay decreased by 3.6% in 2017. Airport capacity and weather contributed to 83.9% of the total airport delays”. Global and/or long-term phenomena such as climate change, the frequency and severity of extreme weather may even further increase this effect in the future.


Scope:Proposals may investigate innovative operational changes to ATM aiming at reducing the environmental impact from aviation. These activates should considered different aspects of environmental impact, e.g. climate impact through CO2 and other emissions, local air quality and noise and the effect this will have in the context of global and/or long-term phenomena such as climate change, global warming, and changes in the frequency and severity of extreme weather or ash-cloud formation on ATM operations.

Also proposals may research to secure the proper integration of existing and possible new meteorological products into ATM for example to reduce the vulnerability of the ATM system to local weather phenomena and to improve the prediction of 4D Trajectories and network forward planning to enable a minimisation of consequential weather-related delays.

Research activities may focus on the development of a concept for using very high-resolution, very short-range forecasts using numerical weather prediction models and observational data assimilation, and assess the need of new MET data/products. The incorporation of ensemble weather information into decision-support tools, adapted for different ATM stakeholders may also to be investigated.

With respect to the local (airport) operations, the accurate prediction of weather conditions (e.g. visibility, glide-path wind) influencing airport arrival and departure operations along with a consolidated climate risk assessment methodology may be investigated.

This topic is linked to ACARE Challenge 3.


Expected Impact:The environmental research should enhance the understanding of how the environmental impacts of ATM operations can be reduced during different phases of flight.

The Meteorological research should contribute to enhance ATM efficiency by integrating meteorological information and by leading to a better understanding of the resilience of the ATM system to local weather and global and/or long-term phenomena to better manage consequential delays in the Network.


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the improvements to be derived from new aircraft and engine technologies. Research is needed to better understand the ways in which ATM can help reduce the impact of aviation on the environment, considering not only fuel burn but other aspects such as CO and NOx and contrails. Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the improvements to be derived from new aircraft and engine technologies. Research is needed to better understand the ways in which ATM can help reduce the impact of aviation on the environment, considering not only fuel burn but other aspects such as CO and NOx and contrails.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1.   List of countries and applicable rules for funding: described in Annex A of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
 
     Proposal page limits and layout:
The title, list of participants and sections 1, 2 and 3, together, should not be longer than 35 pages, as established in the Call conditions for this call.
Please note that this page limit is lower than the standard one for Research and Innovation Actions.
Please refer to Part B of the SJU proposal template in the electronic submission system.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in the SJU Single Programming Document 2019-2021.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
...
1.   List of countries and applicable rules for funding: described in Annex A of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
      A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2.   Eligibility and admissibility conditions: described in Annex B and Annex C of the H2020 Work Programme and in the SJU Single Programming Document 2019-2021.
 
     Proposal page limits and layout:
The title, list of participants and sections 1, 2 and 3, together, should not be longer than 35 pages, as established in the Call conditions for this call.
Please note that this page limit is lower than the standard one for Research and Innovation Actions.
Please refer to Part B of the SJU proposal template in the electronic submission system.
 
3.   Evaluation:
Evaluation criteria, scoring and thresholds are described in the SJU Single Programming Document 2019-2021.
Submission and evaluation processes are described in the Online Manual.
 
4.   Indicative time for evaluation and grant agreement:
      Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
      Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5.   Proposal templates, evaluation forms and model grant agreements (MGA):
SESAR JU Research and Innovation Action (SESAR-RIA)
Specific rules and funding rates
Proposal templates are available after entering the submission tool below.
ER4 Proposal templates
SESAR JU MGA - Multi-Beneficiary
H2020 Annotated Grant Agreement
 
6.   Additional requirements:
The SESAR JU considers that proposals addressing topics in Work Area 1 can request a contribution from the EU between EUR 500.000 minimum and EUR 1.000.000 maximum and should end no later than Q4 2022 (including 6 months for dissemination activities after delivering final results). These conditions are intended to allow the specific challenges to be addressed appropriately and if additional EU contribution is requested this must be strongly justified in any proposal.
 
      Horizon 2020 budget flexibility
      Classified information
      Financial support to Third Parties
 
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
 
7.   Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the H2020 main Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
8.   Additional documents
Please read carefully all documents below before the preparation of your application. The key reference documents below set out the purpose and scope of the Exploratory Research 4 Call for Proposals and describe the activities that will be implemented via the resulting Grant Agreements as well as the conditions for participation and award.
 
SJU Single Programming Document 2019-2021
Project Handbook of SESAR 2020 Exploratory Research Call ER4 - Programme Execution Guidance
Technical Specification of SESAR 2020 Exploratory Research 4 Call - ER4
ATM Master Plan
Communication Guidelines S2020 Projects
Frequently Asked Questions & Answers (all updates are constantly reflected in the document)
H2020 Regulation of Establishment
H2020 Rules for Participation
H2020 Specific Programme
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-SESAR-2019-2 Environment and Meteorology for ATM Specific Challenge:Air traffic management has an important role to play in reducing the environmental impact of aviation, in addition to the...
Sin info.
SESAR-ER4-14-2019 Meteorology at Airports
en consorcio: Specific Challenge:Weather has a significant impact on airport operations: snow, sleet, and freezing rain, which along with strong winds, lo...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-ER4-13-2019 Innovation in Airport Operation
en consorcio: Specific Challenge:The airport is at the heart of the air traffic management system and any improvement in the airport operations will likel...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-ER4-22-2019 Digital Evolution of Separation Minima in En-route and TMA
en consorcio: Specific Challenge:Keeping aircraft separated from each other is one of the core functions of ATM. In the SESAR concept, ground automation s...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-ER4-18-2019 Automation and CWP
en consorcio: Specific Challenge:Increasing the level of automation in air traffic control is a key enabler for the realization of the Master Plan vision....
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
SESAR-ER4-29-2019 Remain Well Clear for IFR RPAS Integration in Class D-G Airspace
en consorcio: Specific Challenge:SESAR industrial research is working on the accommodation and integration of IFR RPAS in airspaces A-C, where the separat...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de