Innovating Works
HORIZON-CL5-2024-D3-01-12
HORIZON-CL5-2024-D3-01-12: Energy Management Systems for flexibility services
Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 16-01-2024.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos:

Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:

Contribute to the use of smart buildings and smart industrial sites for the integration of renewables in the energy system in an efficient way.Demonstrate aggregation of multiple (building or industrial) energy management systems to provide flexibility services (wholesale market price signals, demand response, flexible production, smart charging, balancing & frequency services, congestion management) to the electricity network.Demonstrate interoperability and data exchange technologies to aggregate data from different sources and in different formats through cooperation between aggregators and energy management system developers.Piloting and demonstration of flexibility pool operations at the local and regional levels. The selected projects should propose recommendations how current products, markets and market processes for flexibility should be adapted to accommodate these new services and/or fully benefit from the potential these improved energy management services will bring.

Scope:Projects are expected to:

Develop solutions to ag... see more

Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:

Contribute to the use of smart buildings and smart industrial sites for the integration of renewables in the energy system in an efficient way.Demonstrate aggregation of multiple (building or industrial) energy management systems to provide flexibility services (wholesale market price signals, demand response, flexible production, smart charging, balancing & frequency services, congestion management) to the electricity network.Demonstrate interoperability and data exchange technologies to aggregate data from different sources and in different formats through cooperation between aggregators and energy management system developers.Piloting and demonstration of flexibility pool operations at the local and regional levels. The selected projects should propose recommendations how current products, markets and market processes for flexibility should be adapted to accommodate these new services and/or fully benefit from the potential these improved energy management services will bring.

Scope:Projects are expected to:

Develop solutions to aggregate flexibility from different (types of) energy consumers that use different energy management systems to develop interoperable solutions to optimise the energy management systems and valorise its flexibility in wholesale markets and for balancing and/or congestion management services).Define and demonstrate the type of flexibility services that clusters of smart buildings and smart industrial sites can provide.Cooperate with (one or more) TSOs and/or DSOs, preferably making use of day-to-day operational flexibility markets (i.e. not R&I projects or regulatory sandboxes).Include at least 3 different energy management systems in case of industry, or 5 in case of buildings, developed by different technology providers and that use different protocols/standards/proprietary solutions for the energy management system.Involve at least 3 different energy system management service companies in case of industry, or 5 in case of buildings.Include at least 2 aggregators to ensure that developed solutions are based on standards and to avoid proprietary solutions.Include at least 1 home appliances producer in case of buildings. To ensure interoperability and integration into the grid, specific demonstrators will make use of operational end-to-end architectures, digital platforms and other data exchange infrastructure for the energy system being developed under ongoing Horizon 2020, Horizon Europe as well as under other EU programs such as the Digital Europe Program. Preferably semantically interoperable interactions, as enabled by the ETSI SAREF ontologies, are used. Design and demonstrate appropriate concepts for acquiring and activating flexibility (implicit and explicit) that allow to maximally benefit from the potential of these new services. The project should demonstrate or recommend how the coordination and cooperation between TSO and DSO has to be organized to adopt the different concepts for services, products and markets.

The selected projects are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.

[1] https://www.h2020-bridge.eu/

see less

Temáticas Obligatorias del proyecto: Temática principal: Energy systems (production distribution application)

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Expenses related to personnel working directly on the project are based on actual hours spent, based on company costs, and fixed ratios for certain employees, such as the company's owners.
Subcontracting costs.
Payments to external third parties to perform specific tasks that cannot be performed by the project beneficiaries.
Purchase costs.
They include the acquisition of equipment, amortization, material, licenses or other goods and services necessary for the execution of the project
Other cost categories.
Miscellaneous expenses such as financial costs, audit certificates or participation in events not covered by other categories
Indirect costs.
Overhead costs not directly assignable to the project (such as electricity, rent, or office space), calculated as a fixed 25% of eligible direct costs (excluding subcontracting).
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 6:. Se cuenta con prototipos piloto capaces de desarrollar todas las funciones necesarias dentro de un sistema determinado, habiendo superado pruebas de factibilidad en condiciones de operación o funcionamiento real. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
For the eligible budget, the intensity of the aid in the form of a lost fund may reach From a 70% up to a 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2024-D3-01 Energy Management Systems for flexibility services Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Contribute to the use of smart build...
Sin info.
HORIZON-CL5-2024-D3-02-01 Digital tools for CSP and solar thermal plants
en consorcio: Expected Outcome:Project results are expected to contribute to some of the following expected outcomes: Improved performance of concentrate...
Cerrada does 3 months | next call scheduled for the month of
HORIZON-CL5-2024-D3-02-05 PV-integrated electric mobility applications
en consorcio: Expected Outcome:Photovoltaic power generation is pivotal to a clean energy system and the achievement of the net zero-emissions target. To...
Cerrada does 3 months | next call scheduled for the month of
HORIZON-CL5-2024-D3-02-08 Minimisation of environmental, and optimisation of socio-economic impacts in the deployment, operation and decommissioning of offshore wind farms
en consorcio: Expected Outcome:If the project is on the first action 1) than the project results are expected to contribute to at least three of the outco...
Cerrada does 3 months | next call scheduled for the month of
HORIZON-CL5-2024-D3-02-12 DACCS and BECCS for CO2 removal/negative emissions
en consorcio: Expected Outcome:The European Union aims at reducing its net greenhouse gas emissions by at least 55% by 2030 compared to 1990 levels, and a...
Cerrada does 3 months | next call scheduled for the month of
HORIZON-CL5-2024-D3-02-03 Development of smart concepts of integrated energy driven bio-refineries for co-production of advanced biofuels, bio-chemicals and biomaterials
en consorcio: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Expand the portfolio of cost-effect...
Cerrada does 3 months | next call scheduled for the month of