FCH-02-7-2017: Development of flexible large fuel cell power plants for grid support
Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than ever. A zero emission alternative for fossil fuel based (backup) power supply is needed. Excess electricity, from wind and solar renewable generation, can be converted into hydrogen and stored for re-electrification during periods of energy shortage.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 20-04-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than ever. A zero emission alternative for fossil fuel based (backup) power supply is needed. Excess electricity, from wind and solar renewable generation, can be converted into hydrogen and stored for re-electrification during periods of energy shortage.

Grid operators need power supply technologies on MW scale that have fast response times and excellent load-following capabilities. With such a technology they can facilitate efficient and reliable interaction with the grid on both transmission and distribution level, and ensure energy security for end users. Flexible hydrogen fuelled fuel cell power plants (FCPP) could be perfectly suited for this purpose as, compared to other technologies, they have very high efficiency, potential for fast and effective load-following capabilities, zero emission, and can be used for both short and long term grid support (winter months). Together with large (MW scale) rapid response electrolysers, which are developed and demonstrated in previous calls, large hydrogen-fuelled FCPPs have the potential to... ver más

Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than ever. A zero emission alternative for fossil fuel based (backup) power supply is needed. Excess electricity, from wind and solar renewable generation, can be converted into hydrogen and stored for re-electrification during periods of energy shortage.

Grid operators need power supply technologies on MW scale that have fast response times and excellent load-following capabilities. With such a technology they can facilitate efficient and reliable interaction with the grid on both transmission and distribution level, and ensure energy security for end users. Flexible hydrogen fuelled fuel cell power plants (FCPP) could be perfectly suited for this purpose as, compared to other technologies, they have very high efficiency, potential for fast and effective load-following capabilities, zero emission, and can be used for both short and long term grid support (winter months). Together with large (MW scale) rapid response electrolysers, which are developed and demonstrated in previous calls, large hydrogen-fuelled FCPPs have the potential to become one of the key enabling technologies for the future renewable energy based infrastructure of Europe.

1-2 MW size hydrogen FCPP’s have both been built and successfully demonstrated via European programs in recent years. However, these systems, its fuel cells, and other key components were not designed for flexible dynamic power to power operation. Moreover, with the applied fuel cells and system design the required cost levels cannot be reached, even not if the units are built in high volumes. This is because the fuel cells applied were not designed for MW size applications, the system and component development was not well integrated, and a modular approach and capital equipment cost level (Capex) did not have priority. So, significant (design) improvements of the system and the fuel cells are required. Furthermore, we need experience how to connect flexible FCPP to the grid.

Only via a joint step-by-step innovative approach the European technology, the European supply/value chain, and the market can be further developed. Europe is still leading with large-scale hydrogen FCPP technology but the basis of the European supply chain is small. To be competitive with existing technologies (e.g. diesel gen sets), Capex of < 1,500 Euro/kW is required to open this market for large-scale hydrogen FCPP technology.


Scope: Design of a modular highly flexible MW size fuel cell power plant for dynamic P2P applications of H2 and baseload operation to be connected to the grid. Next to the complete design of the FCPP, it includes the design and development of key components and validation of their performance and scale up potential, with the purpose to optimise performance and minimise Capex for a MW size system (e.g. 2 MW). The Capex reduction could for example be accomplished by a reduction in the materials costs, the number of components and connections, the production steps, costs power electronics, and most importantly the development of larger fuel cell stacks. The chosen concepts should be modular and integrating manufacturability approach, resulting in a design that is fit for mass production. Validation via a pilot scale flexible FCPP in an industrially relevant environment and compatible with large scale manufacturing. H2 can originate from P2G and/or industry H2 vents. The selected size of the pilot installation should be logical in view of the modular design of the MW size FCPP and validation purposes (e.g. 75 – 200 KW). The individual fuel cells stacks should have the same power output during the validation period as envisaged for the MW size FCPP and are fully integrated into the pilot FCPP system. The project should strive to validate a sufficient level of responsiveness to meet the requirements of the grid services and dynamic electricity price opportunities (e.g. for rapid modulation, rapid start, frequency response, as required by services offered to the grid). It should include control systems, diagnostics and monitoring, management of unbalanced stack (due to e.g. degradation), management and forecasting for better grid integration and will be connected to the grid. The duration of the validation in an industrial relevant environment should be at least 8 months. The proposal must include an initial plan for use of the pilot installation after the project. In order to optimize the design of system and components the suppliers and system integrators should work closely together and show that they apply a joint, open, integrated and multidisciplinary approach. Learnings from other (national and international) projects, including the projects in the frame of the LCE topic for smart grid, storage and system integration technologies for distribution system, should be included where possible. Further develop and reinforce (repeatable) business models, plans, and service strategy. This topic puts significant focus on the further development of the FC stack and is a prerequisite for the success and competitiveness of the European sector in future.

TRL start: 3, TRL end: 6

MRL start 2, MRL end 6

Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC), which manages the European hydrogen safety reference database, HIAD (dedicated mailbox [email protected]).

The FCH 2 JU considers that proposals requesting a contribution from the EU of up to EUR 4 million would allow the specific challenges to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected duration: 3 years


Expected Impact: The proposal is expected to design and develop a modular flexible MW size FCPP for dynamic P2P applications of H2 and baseload operation for connection to the grid. Capex < 1500 Euro/kW system in case of series production of MW size FCPP with total capacity of 25 MW/year (not included cost for transport, installation, project management, and utilities). Development and validation of key components, in particular fuel cells, demonstrating scale up potential and Capex reduction. Lifetime expectation fuel cells > 20000 h, FC efficiency > 55%, Capex FC < 450 Euro/kW stack (series production with total capacity of 25 MW/year). Validation of operation flexibility and grid stabilisation capability via a pilot FCPP via fast (within seconds) response times and load following capacity over a 20-100% power range. 50% power in < 20 seconds and 100% power in < 60 seconds. Electrical efficiency FCPP > 50%. This number is higher than mentioned in the MAWP because the focus is to optimize electrical efficiency Availability expectation FCPP > 95% Design of competitive demand response programmes for the benefit of the grid and the consumers considering integration of FCPP systems. Strengthened and further develop European supply/value chains and sustainable partnerships between different European suppliers and stakeholders. Strengthen the European industry, by creating knowledge in support of the EU growth and jobs policy agenda. Increased public and market awareness and acceptance of fuel cells and the important role hydrogen and hydrogen technology can play in the future sustainable energy infrastructure. E.g. via press releases, conferences, workshops, television programs, etc. Overview of threats/barriers to achieve Capex and efficiency targets on full MW scale and recommendations to overcome these in future demonstration projects.
ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than ever. A zero emission alternative for fossil fuel based (backup) power supply is needed. Excess electricity, from wind and solar renewable generation, can be converted into hydrogen and stored for re-electrification during periods of energy shortage. Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than ever. A zero emission alternative for fossil fuel based (backup) power supply is needed. Excess electricity, from wind and solar renewable generation, can be converted into hydrogen and stored for re-electrification during periods of energy shortage.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH2 JU Model Grant Agreement
Annotated Model Grant Agreement
 
         6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 
         7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved. See Part L of the General Annexes of the General Work Programme. 
 
        8. Additional documents:
FCH2 JU 2017 Work Plan
FCH2 JU Multi Annual Work Plan 
FCH2 JU – Regulation of establishment
Horizon 2020 Regulation of Establishment
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2017-1 Development of flexible large fuel cell power plants for grid support Specific Challenge:With the Paris Climate Agreement, the need for short and long term sustainable grid support, has become more urgent than...
Sin info.
FCH-02-5-2020 Underground storage of renewable hydrogen in depleted gas fields and other geological stores
en consorcio: Specific Challenge:The increasing contribution of variable renewable energy (VRE) in the electricity grid is creating a substantial temporal...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-02-1-2020 Catalyst development for improved economic viability of LOHC technology
en consorcio: Specific Challenge:Hydrogen is a flexible energy carrier that can be produced from any energy source, and which can be converted into variou...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-02-8-2020 Demonstration of large-scale co-electrolysis for the Industrial Power-to-X market
en consorcio: Specific Challenge:In order to fight climate change, the need to reduce the emission of greenhouse gases will force the chemical industry to...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-02-6-2020 Electrolyser module for offshore production of renewable hydrogen
en consorcio: Specific Challenge:The foreseen magnitude of renewable electricity (RE) production requires the development of large-scale offshore wind and...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-02-7-2020 Cyclic testing of renewable hydrogen storage in a small salt cavern
en consorcio: Specific Challenge:The combination of variable renewable energy, electrolysers and geological stores can provide a means for capturing and h...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de