Innovating Works
JTI-CS2-2016-CFP03-FRC-02...
JTI-CS2-2016-CFP03-FRC-02-11: Design and realization of equipped engine compartments for a fast compound rotorcraft
Specific Challenge:
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 02-06-2016.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:

The scope of this WP includes firewalls, cowlings, engine air inlet systems, engine bay ventilation and halon-free fire extinguishing system For the full topic description see the Call Text Document (Annex of Workplan) published with this call.

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge: Specific Challenge:
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call:
The proposal templates will be available in the submission system (SEP).
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Anne...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call:
The proposal templates will be available in the submission system (SEP).
Proposal templates are available after entering the submission tool below.
H2020 Clean Sky 2 JU MGA for Partners - Multi-Beneficiary
H2020 Clean Sky 2 JU MGA for Partners - Mono-Beneficiary
Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Background documents:
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
Clean Sky 2 Summary list of topics in the call 2014
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP03-2016-01 Design and realization of equipped engine compartments for a fast compound rotorcraft Specific Challenge: The scope of this WP includes firewalls, cowlings, engine air inlet systems, engine bay ventilation and halon-...
Sin info.
JTI-CS2-2016-CFP03-FRC-02-15 Advanced Health Monitoring System for next generation materials
en consorcio: Specific Challenge: The aim of this Call for Partner is to define an advanced Health Monitoring System (HMS) for the Lateral Rotor...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2016-CFP03-FRC-01-09 Power Distribution
en consorcio: Specific Challenge: Design, development, testing and flight qualification of high power Power Distribution Units (PDUs) for the sa...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2016-CFP03-FRC-02-11 Design and realization of equipped engine compartments for a fast compound rotorcraft
en consorcio: Specific Challenge: The scope of this WP includes firewalls, cowlings, engine air inlet systems, engine bay ventilation and halon-...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2016-CFP03-FRC-02-09 Light weight, impact resistant, canopy for fast compound rotorcraft
en consorcio: Specific Challenge: The primary structure to be designed and produced constitutes the fuselage front section from radar-transparen...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2016-CFP03-FRC-01-02 Development and demonstration of materials and manufacturing process for high power density homokinetic drive joints for civil rotor applications
en consorcio: Specific Challenge: The objective is to deliver flight cleared homokinetic drive units for tilrotor proprotor units. Representativ...
Cerrada hace 8 años | Próxima convocatoria prevista para el mes de