Innovating Works
FCH-04-5-2017
FCH-04-5-2017: Definition of Accelerated Stress Testing (AST) protocols deduced from understanding of degradation mechanisms of aged stack components in Fuel Cell systems
Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack components as MEA or bipolar plates. Targeting the understanding of realistic failure modes and the development of ASTs that addresses those failure modes is a valuable contribution in order to shorten the development time of new materials to be integrated in the next system generation. Actually, ASTs will allow faster evaluation of new materials and provide a standardized test to benchmark materials and/or stack components, and will accelerate the development to meet cost (100€/kW @system for passenger cars in 2020 and between 1500 and 10000 €/kW for stationary fuel cells depending on their size in 2020) and durability targets (6,000h for automotive and 80,000h in stationary applications). While different ASTs are already available (DOE-FCTT, Japan-FCCJ but no European ones), there is still a lack of correlation or transfer function to “Real World” data. As far as PEMFC are concerned, AST on electrocatalyst is the most critical, AST for membrane and support appear consolidated but have been recently adapted by DOE and no tests are available for GDLs. AST depend both on the application and on the technology. Therefore specific AST have to be developed for PEMFC and SOFC stack components in different user profiles. For SOFC, first accelerated testing have been done, but they are less advanced than in PEMFC, and in all cases they will be different in terms of solicitations.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 20-04-2017.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack components as MEA or bipolar plates. Targeting the understanding of realistic failure modes and the development of ASTs that addresses those failure modes is a valuable contribution in order to shorten the development time of new materials to be integrated in the next system generation. Actually, ASTs will allow faster evaluation of new materials and provide a standardized test to benchmark materials and/or stack components, and will accelerate the development to meet cost (100€/kW @system for passenger cars in 2020 and between 1500 and 10000 €/kW for stationary fuel cells depending on their size in 2020) and durability targets (6,000h for automotive and 80,000h in stationary applications). While different ASTs are already available (DOE-FCTT, Japan-FCCJ but no European ones), there is still a lack of correlation or transfer function to “Real World” data. As far as PEMFC are concerned, AST on electrocatalyst is the most critical, AST for membrane and support appear consolidated but have been recently adapted by DOE and no tests are available for... ver más

Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack components as MEA or bipolar plates. Targeting the understanding of realistic failure modes and the development of ASTs that addresses those failure modes is a valuable contribution in order to shorten the development time of new materials to be integrated in the next system generation. Actually, ASTs will allow faster evaluation of new materials and provide a standardized test to benchmark materials and/or stack components, and will accelerate the development to meet cost (100€/kW @system for passenger cars in 2020 and between 1500 and 10000 €/kW for stationary fuel cells depending on their size in 2020) and durability targets (6,000h for automotive and 80,000h in stationary applications). While different ASTs are already available (DOE-FCTT, Japan-FCCJ but no European ones), there is still a lack of correlation or transfer function to “Real World” data. As far as PEMFC are concerned, AST on electrocatalyst is the most critical, AST for membrane and support appear consolidated but have been recently adapted by DOE and no tests are available for GDLs. AST depend both on the application and on the technology. Therefore specific AST have to be developed for PEMFC and SOFC stack components in different user profiles. For SOFC, first accelerated testing have been done, but they are less advanced than in PEMFC, and in all cases they will be different in terms of solicitations.

As of today, a growing number of FCH JU demonstration projects involving hydrogen technologies (buses, cars, stationary applications) are ongoing and expected in Europe. Some monitoring is in place providing feedback regarding evolution of the performance of the system in correlation with user profile. In order to retrieve most benefits from these past or on-going demonstration projects, it is important to link these evolutions to materials evolution with quantitative data for various usages.


Scope:The objectives of this project dealing with either transport or energy pillars and PEMFC or SOFC technology may include:

(1) Identification of degradation mechanisms and quantification of degradation on aged stack components (bipolar plates, electrodes, gas diffusion layers, membranes, cells, sealing’s …) coming from FCH JU demonstration projects,

(2) development of advanced in situ and ex situ characterization techniques and accelerated stress test (AST) protocols, compatible to existing test station hardware, with the identification of transfer functions of the component degradation measured in an AST to real-world behavior of that component. For PEMFC technology, finalization and validation of the new single cell design initiated by the working group coordinated by JRC has to be taken into account. Proposal and validation of AST from materials to stack components and optionally stack level, the latter potentially more application specific when relevant,

(3) development of models related to degradation mechanisms, implementing models describing degradation mechanisms into performance models. Evaluation of the capability of performance/degradation models to confirm and quantify the accelerating impact by adapting some operating or load profiles should be considered.

A key requisite for the project is the certainty of acquisition of at least 6 aged samples of a given stack component (MEA for PEMFC or cell for SOFC, bipolar plate) of at least 3 different stacks and of the corresponding user profiles. Projects are open to any application (transport or stationary) and should focus on a fuel cell technology (PEMFC, SOFC). Therefore the relevant actors should be included in the consortium and/or letters of intent of the materials providers should be provided. Availability of comparable non aged materials or stack components should be envisioned to ensure relevant comparison between “real-world” ageing and ageing caused by selected AST.

Any safety-related event that may occur during execution of the project shall be reported to the European Commission's Joint Research Centre (JRC), which manages the European hydrogen safety reference database, HIAD (dedicated mailbox [email protected]).

A collaboration mechanism needs to be developed with the JRC, in relation to the ongoing EU protocols harmonization and validation activities performed in support to the whole FCH2 JU program.

International collaboration through scientific exchanges or an advisory board with entities outside Europe (e.g. IPHE countries) investigating this field is highly recommended in so far proposals include a specific activity to frame and justify their work and its contribution within the international activity.

The FCH 2 JU considers that proposals requesting a contribution from the EU of EUR 2.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected duration: 3 years


Expected Impact: Enhanced understanding of the correlation between user profile and degradation mechanisms on at least two stack components (gas diffusion layer, catalyst layer , membrane for PEMFC, cell for SOFC, bipolar plate and potentially its sealing) and its validation with models related to degradation mechanisms Define updated testing hardware for PEMFC, testing methods and evaluation criterion / criteria to allow faster evaluation than current AST of new materials and standardised tests to benchmark materials on at least two stack components (gas diffusion layer, catalyst, membrane for PEMFC, cell for SOFC, , bipolar plate) with a quantified correlation or between AST results and lifetime in a user profile (transport, stationary) Validation of the methodology (i.e. comparison and correlation between “real-world” behaviour and AST caused degradation) should be achieved owing to experimental and/or modelling results showing at least similar ranking between materials or stack components with a good correlation between quandtitative degradation features (to be selected such as performaces degradation rates, properties losses, microstucture modifications) Provide recommendations about improvements of monitoring and tracking systems for future deployments in order to capitalise on return of experience. Integration of the developed AST with the EU harmonized test protocols (for PEMFC). Final document with reference to existing global SoA AST, explaining differences and additional valuable information. Recommendations for international standardisation of Accelerated Stress Testings within IEC TC105 which should lead to a New Working Item Proposal (NWIP)
Cross-cutting Priorities:International cooperation


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack components as MEA or bipolar plates. Targeting the understanding of realistic failure modes and the development of ASTs that addresses those failure modes is a valuable contribution in order to shorten the development time of new materials to be integrated in the next system generation. Actually, ASTs will allow faster evaluation of new materials and provide a standardized test to benchmark materials and/or stack components, and will accelerate the development to meet cost (100€/kW @system for passenger cars in 2020 and between 1500 and 10000 €/kW for stationary fuel cells depending on their size in 2020) and durability targets (6,000h for automotive and 80,000h in stationary applications). While different ASTs are already available (DOE-FCTT, Japan-FCCJ but no European ones), there is still a lack of correlation or transfer function to “Real World” data. As far as PEMFC are concerned, AST on electrocatalyst is the most critical, AST for membrane and support appear consolidated but have been recently adapted by DOE and no tests are available for GDLs. AST depend both on the application and on the technology. Therefore specific AST have to be developed for PEMFC and SOFC stack components in different user profiles. For SOFC, first accelerated testing have been done, but they are less advanced than in PEMFC, and in all cases they will be dif... Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack components as MEA or bipolar plates. Targeting the understanding of realistic failure modes and the development of ASTs that addresses those failure modes is a valuable contribution in order to shorten the development time of new materials to be integrated in the next system generation. Actually, ASTs will allow faster evaluation of new materials and provide a standardized test to benchmark materials and/or stack components, and will accelerate the development to meet cost (100€/kW @system for passenger cars in 2020 and between 1500 and 10000 €/kW for stationary fuel cells depending on their size in 2020) and durability targets (6,000h for automotive and 80,000h in stationary applications). While different ASTs are already available (DOE-FCTT, Japan-FCCJ but no European ones), there is still a lack of correlation or transfer function to “Real World” data. As far as PEMFC are concerned, AST on electrocatalyst is the most critical, AST for membrane and support appear consolidated but have been recently adapted by DOE and no tests are available for GDLs. AST depend both on the application and on the technology. Therefore specific AST have to be developed for PEMFC and SOFC stack components in different user profiles. For SOFC, first accelerated testing have been done, but they are less advanced than in PEMFC, and in all cases they will be different in terms of solicitations.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
The following exceptions apply (see 'chapter 3.3. Call management rules' from the FCH2 JU 2017 Work Plan and specific topic description):
- “For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium”;
- “For all Innovation Activities, an additional eligibility criterion has been introduced to limit the FCH 2 JU requested contribution”.
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH2 JU Model Grant Agreement
Annotated Model Grant Agreement
 
         6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
 
         7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved. See Part L of the General Annexes of the General Work Programme. 
 
        8. Additional documents:
FCH2 JU 2017 Work Plan
FCH2 JU Multi Annual Work Plan 
FCH2 JU – Regulation of establishment
Horizon 2020 Regulation of Establishment
Horizon 2020 Rules for Participation
Horizon 2020 Specific Programme
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2017-1 Definition of Accelerated Stress Testing (AST) protocols deduced from understanding of degradation mechanisms of aged stack components in Fuel Cell systems Specific Challenge:This approach addresses key aspects of interest for the industry related to durability particularly regarding the stack c...
Sin info.
FCH-04-5-2020 Guidelines for Life Cycle Sustainability Assessment (LCSA) of fuel cell and hydrogen systems
en consorcio: Specific Challenge:The ambition of the FCH 2 JU is to develop clean, efficient and affordable solutions that fully demonstrate the potential...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-04-2-2020 PNR on hydrogen-based fuels solutions for passenger ships
en consorcio: Specific Challenge:In April 2018, the International Maritime Organisation, IMO adopted an initial strategy on reduction of GHG emissions fro...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-04-1-2020 Overcoming technical and administrative barriers to deployment of multi-fuel hydrogen refuelling stations (HRS)
en consorcio: Specific Challenge:The development of a widely available hydrogen vehicle refuelling infrastructure across EU will need hydrogen to be able...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-04-3-2020 Development of eco-design guidelines for FCH products
en consorcio: Specific Challenge:The path towards a well-established hydrogen economy requires the deployment of sustainable FCH systems. Moreover, such a...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
FCH-04-4-2020 Development and validation of existing and novel recycling technologies for key FCH products
en consorcio: Specific Challenge:Previous research initiatives, such as HyTechCycling project [89],[90] have identified the current absence of viable and...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de