Innovating Works
JTI-CS2-2014-CFP01-AIR-01...
JTI-CS2-2014-CFP01-AIR-01-03: CROR Engine debris Impact. Shielding design, manufacturing, simulation and Impact test preparation
Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy debris linked to the engine burst. It also includes the manufacturing and preparation for impact test for such shielding and panels.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 31-03-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy debris linked to the engine burst. It also includes the manufacturing and preparation for impact test for such shielding and panels.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")


Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy debris linked to the engine burst. It also includes the manufacturing and preparation for impact test for such shielding and panels.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents") Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy debris linked to the engine burst. It also includes the manufacturing and preparation for impact test for such shielding and panels.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals"
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015)
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (SEP).
 
Additional provisions: Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals"
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015)
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (SEP).
 
Additional provisions:
Clean Sky 2 Budget Flexibility:
See Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
 JTIs additional documents
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP01-2014-01 CROR Engine debris Impact. Shielding design, manufacturing, simulation and Impact test preparation Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy de...
Sin info.
JTI-CS2-2014-CFP01-AIR-01-03 CROR Engine debris Impact. Shielding design, manufacturing, simulation and Impact test preparation
en consorcio: Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy de...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-AIR-01-05 Blade FEM impact simulations and sample manufacturing for CROR Aircraft
en consorcio: Scope:These work package deals with the development and maturation of blade impact simulation model and physical specimen manufacturing to b...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-AIR-01-04 Aero-acoustic experimental characterization of a CROR (Contra Rotating Open Rotor) engine WT model with core flow in propellers architecture
en consorcio: Scope:The CROR engine architecture with primary flow ejection into propellers is a promising technology to reduce CROR engine weight. Unfort...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-AIR-02-04 New enhanced acoustic damping composite material
en consorcio: Scope:The activities will be oriented on development of innovative composite materials, from different suppliers, to meet future aircraft pr...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-AIR-02-06 Simulation tool development for a composite manufacturing process default prediction integrated into a quality control system
en consorcio: Scope:In the frame of non desctructive testing  integration on the manufacturing line, the activities will be oriented on the development of...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de