Innovating Works
JTI-CS2-2014-CFP01-AIR-01-02
JTI-CS2-2014-CFP01-AIR-01-02: Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization
Scope:Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 31-03-2015.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Scope:Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")


Temáticas Obligatorias del proyecto: Temática principal: NUM Numerical Models (including Fast Time Simulati APS Aircraft Performance Analysis CAC Computational Acoustics

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents") Scope:Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization.  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals"
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015)
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic: 
The proposal templates will be available in the submission system (SEP).
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
   Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals"
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015)
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic: 
The proposal templates will be available in the submission system (SEP).
 
Additional provisions:
Clean Sky 2 Budget Flexibility:
See Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
 JTIs additional documents
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP01-2014-01 Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization Scope:Advanced predictive models development and simulation capabilities for Engine design space exploration and performance optimization. ...
Sin info.
JTI-CS2-2014-CFP01-AIR-01-03 CROR Engine debris Impact. Shielding design, manufacturing, simulation and Impact test preparation
en consorcio: Scope:These work package deals with the development and maturation of innovative shielding and panels able to sustain high and low energy de...
Cerrada does 10 years | next call scheduled for the month of
JTI-CS2-2014-CFP01-AIR-01-05 Blade FEM impact simulations and sample manufacturing for CROR Aircraft
en consorcio: Scope:These work package deals with the development and maturation of blade impact simulation model and physical specimen manufacturing to b...
Cerrada does 10 years | next call scheduled for the month of
JTI-CS2-2014-CFP01-AIR-01-04 Aero-acoustic experimental characterization of a CROR (Contra Rotating Open Rotor) engine WT model with core flow in propellers architecture
en consorcio: Scope:The CROR engine architecture with primary flow ejection into propellers is a promising technology to reduce CROR engine weight. Unfort...
Cerrada does 10 years | next call scheduled for the month of
JTI-CS2-2014-CFP01-AIR-02-04 New enhanced acoustic damping composite material
en consorcio: Scope:The activities will be oriented on development of innovative composite materials, from different suppliers, to meet future aircraft pr...
Cerrada does 10 years | next call scheduled for the month of
JTI-CS2-2014-CFP01-AIR-02-06 Simulation tool development for a composite manufacturing process default prediction integrated into a quality control system
en consorcio: Scope:In the frame of non desctructive testing  integration on the manufacturing line, the activities will be oriented on the development of...
Cerrada does 10 years | next call scheduled for the month of