Innovating Works
FCH-02-5-2016
Advanced monitoring, diagnostics and lifetime estimation for stat...
Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration systems are installed. One important cost aspect is the SOFC unit and its lifetime and durability, which still determine large part of the total costs. While durability studies on SOFC stacks or modules have been carried out comprehensively using advanced methodology, there is only limited monitoring of the state of the SOFC during operation in the field available or not even existing at all. That is a costly problem as the systems cannot counteract properly if a SOFC stack starts to malfunction or to degrade fatally. A stack monitoring and diagnostic methodology is therefore needed to evaluate the state of health of a working SOFC, to detect and identify critical operation, and to counteract appropriately on a system level before fatal damage has occurred on the SOFC stack.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 03-05-2016.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration systems are installed. One important cost aspect is the SOFC unit and its lifetime and durability, which still determine large part of the total costs. While durability studies on SOFC stacks or modules have been carried out comprehensively using advanced methodology, there is only limited monitoring of the state of the SOFC during operation in the field available or not even existing at all. That is a costly problem as the systems cannot counteract properly if a SOFC stack starts to malfunction or to degrade fatally. A stack monitoring and diagnostic methodology is therefore needed to evaluate the state of health of a working SOFC, to detect and identify critical operation, and to counteract appropriately on a system level before fatal damage has occurred on the SOFC stack.

Previous projects have proposed monitoring and diagnostic techniques for their implementation in real systems. Balance of Plant faults and stack malfunctions detection methodologies based on conventional approaches are available after the project GENIUS, which conce... ver más

Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration systems are installed. One important cost aspect is the SOFC unit and its lifetime and durability, which still determine large part of the total costs. While durability studies on SOFC stacks or modules have been carried out comprehensively using advanced methodology, there is only limited monitoring of the state of the SOFC during operation in the field available or not even existing at all. That is a costly problem as the systems cannot counteract properly if a SOFC stack starts to malfunction or to degrade fatally. A stack monitoring and diagnostic methodology is therefore needed to evaluate the state of health of a working SOFC, to detect and identify critical operation, and to counteract appropriately on a system level before fatal damage has occurred on the SOFC stack.

Previous projects have proposed monitoring and diagnostic techniques for their implementation in real systems. Balance of Plant faults and stack malfunctions detection methodologies based on conventional approaches are available after the project GENIUS, which concentrated mostly on the system’s component faults identification. A further advancement has been achieved by the project DESIGN towards the development of passive signal-based techniques for the identification of high fuel utilization and slow degradation phenomena. A step forward is now being accomplished by the project DIAMOND to merge conventional monitoring and diagnostics with control techniques to improve reliability and performance of SOFC. However the state-of-the-art of EU research lacks solutions and instruments dealing with SOFC degradation and prognosis for on-field advanced monitoring that may support diagnostic and lifetime tools. A step forward is required to lift laboratory oriented techniques along with theoretical and modeling studies towards a practical implementation in real SOFC systems. Moreover, several solutions developed for PEMFC (already at TRL 4) are based on advanced monitoring and diagnostic methodologies that may be applied for SOFC as well.


Scope:The overall objective is to develop advanced, robust and cost efficient monitoring and diagnostic tools for stacks/modules in working SOFC, which are to be integrated into the system. The challenge of advancing laboratory application and complex experimental or modeling tools towards their embedding in SOFC system must be clearly addressed. Achieving these objectives will lead to improved durability and reduction of TCO (Total cost of ownership) of SOFC systems thus fostering fuel cell market penetration.

Activities will be devoted to build a new framework for monitoring and diagnostics with high accuracy and reliability. Therefore the methodologies to identify and quantify degradation phenomena are the main scope of the topic. All available knowledge on degradation, mostly exploited for laboratory use and theoretical studies, should be used to perform on-field condition monitoring analysis (e.g. state of health) for easy-to-implement and fast lifetime prediction algorithms. The proposal should also leverage the outcomes of past and on-going projects to address the following objectives:

Enhanced understanding of stack degradation mechanisms in real operating conditions using both experimental and modelling approaches Identify suitable monitoring parameters at stack and system levels that indicate critical state of the SOFC stack/module within the system Define the most suitable and efficient monitoring and diagnostic tools with lifetime forecast functions embedded that do not add more than 3% to the total system manufacturing costs Development of cost-effective monitoring methods to discover fatal degradation in time to start appropriate protective actions, thereby prolonging SOFC lifetime by 5% and increase availability by 1% Implement the proposed algorithms in a SOFC system and perform relevant tests to demonstrate on-line the effectiveness of the developed tool All methodologies and tools must comply with industry standards for a straightforward implementation within SOFC system monitoring and control equipment.

The activities should build on existing, available results from previous or on-going projects. SOFC systems used are expected to be at TRL 6 or higher.

TRL at start: 3

TRL at end: 5

The TRLs refer to the concerned tools for monitoring, diagnostics and lifetime estimation.

The consortium should include at least one SOFC stack/module manufacturer, research institutions and academic groups. To be eligible for participation a consortium must contain at least one constituent entity of the Industry or Research Grouping.

The FCH 2 JU considers that proposals requesting a contribution from the EU of EUR 2.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected duration: 3 years

A maximum of 1 project may be funded under this topic.


Expected Impact:Proposals are expected to achieve a substantial improvement over the state-of-the-art by achieving most of the following targets:

The most relevant degradation mechanisms in SOFC systems for specific stationary market segments have to be identified based on data for system testing and analysed with respect to impact on lifetime, such as fatal impact or slow decrease of power output (for example: redox failure, corrosion, poisoning, etc.) Monitoring parameters have to be identified that reveal state-of-health of SOFC stacks regarding those identified critical mechanisms Counter measures to prevent fatal SOFC stack failure have to be proposed, including possible regular treatments that prevent or slow-down long-term degradation Integration and validation of the method into a system It has to be shown that the added cost of the monitoring/diagnostics approach does not increase the overall system manufacturing costs by more than 3%.
ver menos

Temáticas Obligatorias del proyecto: Temática principal: Energy end-use efficiency and energy services Energy efficiency - general

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration systems are installed. One important cost aspect is the SOFC unit and its lifetime and durability, which still determine large part of the total costs. While durability studies on SOFC stacks or modules have been carried out comprehensively using advanced methodology, there is only limited monitoring of the state of the SOFC during operation in the field available or not even existing at all. That is a costly problem as the systems cannot counteract properly if a SOFC stack starts to malfunction or to degrade fatally. A stack monitoring and diagnostic methodology is therefore needed to evaluate the state of health of a working SOFC, to detect and identify critical operation, and to counteract appropriately on a system level before fatal damage has occurred on the SOFC stack. Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration systems are installed. One important cost aspect is the SOFC unit and its lifetime and durability, which still determine large part of the total costs. While durability studies on SOFC stacks or modules have been carried out comprehensively using advanced methodology, there is only limited monitoring of the state of the SOFC during operation in the field available or not even existing at all. That is a costly problem as the systems cannot counteract properly if a SOFC stack starts to malfunction or to degrade fatally. A stack monitoring and diagnostic methodology is therefore needed to evaluate the state of health of a working SOFC, to detect and identify critical operation, and to counteract appropriately on a system level before fatal damage has occurred on the SOFC stack.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to China, Japan, Republic of Korea, Mexico, Russia, Taiwan).
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. The following exceptions apply (see 'chapter 3.3. Call management rules' from the AWP2016 and specific topic description):  'For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium.'
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. As part of the Panel Review, hearings will be organised for Innovation Actions (IA) proposals. 
3.2 S...
Please read carefully all provisions below before the preparation of your application.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to China, Japan, Republic of Korea, Mexico, Russia, Taiwan).
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. The following exceptions apply (see 'chapter 3.3. Call management rules' from the AWP2016 and specific topic description):  'For some, well-identified topics it is therefore duly justified to require as an additional condition for participation that at least one constituent entity of the Industry Grouping or Research Grouping is among the participants in the consortium.'
Proposal page limits and layout: Please refer to Part B of the FCH2 JU proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. As part of the Panel Review, hearings will be organised for Innovation Actions (IA) proposals. 
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
FCH2 JU Research and Innovation Action (FCH2-RIA):
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
FCH2 JU Model Grant Agreement
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Additional documents:
FCH2 JU 2016 Work Plan
FCH2 JU Multi Annual Work Plan
FCH2 JU – Regulation of establishment
H2020 Work Programme 2016-17: General Annexes
Legal basis: Horizon 2020 - Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-JTI-FCH-2016-1 Advanced monitoring, diagnostics and lifetime estimation for stationary SOFC stacks and modules Specific Challenge:Solid oxide fuel cell technology for stationary applications is approaching the market. More and more demonstration syste...
Sin info.
FCH-02-5-2020 Underground storage of renewable hydrogen in depleted gas fields and other geological stores
en consorcio: Specific Challenge:The increasing contribution of variable renewable energy (VRE) in the electricity grid is creating a substantial temporal...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-02-1-2020 Catalyst development for improved economic viability of LOHC technology
en consorcio: Specific Challenge:Hydrogen is a flexible energy carrier that can be produced from any energy source, and which can be converted into variou...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-02-8-2020 Demonstration of large-scale co-electrolysis for the Industrial Power-to-X market
en consorcio: Specific Challenge:In order to fight climate change, the need to reduce the emission of greenhouse gases will force the chemical industry to...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-02-6-2020 Electrolyser module for offshore production of renewable hydrogen
en consorcio: Specific Challenge:The foreseen magnitude of renewable electricity (RE) production requires the development of large-scale offshore wind and...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
FCH-02-7-2020 Cyclic testing of renewable hydrogen storage in a small salt cavern
en consorcio: Specific Challenge:The combination of variable renewable energy, electrolysers and geological stores can provide a means for capturing and h...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de