Innovating Works

H2020

Cerrada
HORIZON-CL5-2023-D2-01-05
Hybrid electric energy storage solutions for grid support and charging infrastructure (Batt4EU Partnership)
ExpectedOutcome:Projects are expected to contribute to all the following outcomes:
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 18-04-2023.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio..
Esta ayuda financia Proyectos:

ExpectedOutcome:Projects are expected to contribute to all the following outcomes:

Demonstration of hybrid energy storage technologies for long duration storage (from at least 12 hours to days) and provision of multiple grid services with improved technical performances (increased power and energy density with respect to single electrical energy storage system +20%, reduced storage system losses -10%, improved HESS cycle life +15%, improved reliability and availability +15%), sustainability, as well as increased safety during operation, transport and storage.Enable improved levelized cost of storage supported by design optimisation and optimal service stacking, putting the cost of storage on the path to fall below 0.05 €/kWh/cycle by 2030 (for storage durations > 12 hours) while reducing the use of critical raw materials (CRMs).Creating synergies between producers and strengthening the European Battery Ecosystem, improving the European battery value chain and thus contributing to the EU climate neutrality objectives.Increasing digitalisation of energy storage systems from design to operation phase enabling a faster development and optimal use in grid application... ver más

ExpectedOutcome:Projects are expected to contribute to all the following outcomes:

Demonstration of hybrid energy storage technologies for long duration storage (from at least 12 hours to days) and provision of multiple grid services with improved technical performances (increased power and energy density with respect to single electrical energy storage system +20%, reduced storage system losses -10%, improved HESS cycle life +15%, improved reliability and availability +15%), sustainability, as well as increased safety during operation, transport and storage.Enable improved levelized cost of storage supported by design optimisation and optimal service stacking, putting the cost of storage on the path to fall below 0.05 €/kWh/cycle by 2030 (for storage durations > 12 hours) while reducing the use of critical raw materials (CRMs).Creating synergies between producers and strengthening the European Battery Ecosystem, improving the European battery value chain and thus contributing to the EU climate neutrality objectives.Increasing digitalisation of energy storage systems from design to operation phase enabling a faster development and optimal use in grid applications.The establishment of multi-service approaches to energy storage reducing costs and increasing benefits for the European electricity system.Promoting an increased reliability and resilience of the electricity system by demonstrating new multi-purpose energy storage solutions.
Scope:The objective is to design and demonstrate in at least three different use cases a Hybrid Energy Storage System (HESS) capable of long duration storage and provision of multiple services for supporting the electrical grid and EV charging infrastructure.

In particular, proposals are expected to:

Design and demonstrate a sustainable and safe HESS either combining different battery technologies, including next-gen technologies, or combining batteries and other electrostatic/electrochemical storage technologies (e.g., supercapacitors) aiming at providing long duration storage while ensuring the possibility of service-stacking and enabling ultra-fast services. Use of second life battery modules is within the scope. The proposed storage solution should be scalable and modular and show clear innovation with respect to the state of the art (new materials or new designs), always bearing in mind the objectives of sustainability and performance. Proper power conversion devices should be selected or customized for enabling an efficient operation of the hybrid storage in grid-connected, grid-following and grid-forming modes.Perform a life cycle assessment of the HESS starting from the design phases to ensure its sustainability along the entire value chain, also avoiding, whenever possible, or limiting the use of CRMs.Develop physics-based and data-driven digital models of HESS supporting optimal design, and real-time management and diagnosis as well as facilitating the inclusion of storage in grid-planning processes considering forecasted weather conditions, production and consumption. Models should allow the combination of different battery technologies based on specific use cases.Develop and validate management policies and control systems (battery management systems and energy management systems) for HESS that maximise the benefits of a hybrid storage, facilitate asset management and participation in electricity and service markets. Pending amendments to the Renewable Energy Directive to be taken into account in development of the BMS.Demonstrate HESS usage in at least three different use cases in collaboration with relevant stakeholders (e.g., DSO, EV charging infrastructure owners) and its integration in standard grid architectures (Smart Grids Architecture Model – SGAM) ensuring interoperability for most use cases of energy storage systems (e.g., provision of services to the European grid, supporting islanded and weak distribution grids, load levelling for charging stations).Analyse business cases of the proposed hybrid solution considering electricity and balancing markets of three representative EU Member States/Associated Countries, also assessing the applications where HESS provides improved techno-economic performances compared to non-is hybridized storage systems. Proposals are expected to establish links with projects funded under the following topic: HORIZON-CL5-2022-D3-01-10 - Interoperable solutions for flexibility services using distributed energy storage.

The selected projects are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.

Plans for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

International cooperation with USA, Australia, Africa or India is encouraged.

This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.


Specific Topic Conditions:Activities are expected to achieve TRL 7 by the end of the project – see General Annex B.




[1]https://www.h2020-bridge.eu/

ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:
Empresas Micro, Pequeña, Mediana, Grande
Centros Tecnológicos
Universidades
Organismos públicos

Características del Proyecto

Requisitos de diseño: *Presupuesto para cada participante en el proyecto Requisitos técnicos: ExpectedOutcome:Projects are expected to contribute to all the following outcomes: ¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 6:. Representa un paso importante en demostrar la madurez de una tecnología. Se construye un prototipo de alta fidelidad que aborda adecuadamente las cuestiones críticas de escala, que opera en un entorno relevante, y que debe ser a su vez una buena representación del entorno operativo real. leer más.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Condiciones: No existe condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea pero en los últimos 6 meses la línea ha concecido
Total concedido en los últimos 6 meses.
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.