VLD1 Wave 2 Demonstration Of Runway Enhanced Approaches Made with Satellite Navi...
VLD1 Wave 2 Demonstration Of Runway Enhanced Approaches Made with Satellite Navigation
Climate change will shape many aspects of citizen’s lives in the 21st century and beyond. Major ATM changes in the way energy is used or wasted are required to limit global warming and its environmental and social impacts. This VL...
ver más
31/12/2022
INDRA SISTEMAS
7M€
Presupuesto del proyecto: 7M€
Líder del proyecto
INDRA SISTEMAS
El diseno, desarrollo, produccion, integracion, operacion, mantenimiento, reparacion y comercializacion de sistemas, soluciones y productos,...
TRL
4-5
| 1M€
Fecha límite participación
Sin fecha límite de participación.
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto VLD1-W2 DREAMS
Duración del proyecto: 26 meses
Fecha Inicio: 2020-10-30
Fecha Fin: 2022-12-31
Líder del proyecto
INDRA SISTEMAS
El diseno, desarrollo, produccion, integracion, operacion, mantenimiento, reparacion y comercializacion de sistemas, soluciones y productos,...
TRL
4-5
| 1M€
Presupuesto del proyecto
7M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
Climate change will shape many aspects of citizen’s lives in the 21st century and beyond. Major ATM changes in the way energy is used or wasted are required to limit global warming and its environmental and social impacts. This VLD1-W2 DREAMS proposal offer mitigation through the development of meaningful and sustainable activities including efficient airport operation and aircraft noise assessment.
Arising GNSS technology paves the way for new efficient and optimized approaches and are key enablers to develop sustainable airport operation. During this project, airborne platforms will be developed fitted on airline aircraft and exposed on flight tests and revenue flights. Participating ANSPs will develop new approach procedures and further assess GBAS technology on several airports (Frankfurt, Milano Malpensa) In addition airborne industries will carry out flight testings at Twente.
The objective of the VLD1-W2 DREAMS is to bring Enhanced Arrival Procedures (EAP) operations to the next maturity stage (V4) through a Proof of concept combining commercial and non-commercial flights along with flight trials tests.
Demonstration will cover business jet, mainline aircraft with Airbus and Boeing aircraft and operators (four airlines or more), three type of operations covered (IGS, SRAP, IGS-to-SRAP) and pioneer flight on GBAS CAT II/III, several months of application, more than hundred flights collected, the use of noise measurements in addition to noise prediction for benefit assessment. A-IGS related work will be limited to technical studies.