Innovating Works

SEAM4US

Financiado
Sustainable Energy mAnageMent for Underground Stations
Underground transportation systems are big energy consumers (e.g. 63,1 millions of kWh / year), and have significant impacts on energy consumption at a regional scale. One third of the networks' energy is required for operating th... Underground transportation systems are big energy consumers (e.g. 63,1 millions of kWh / year), and have significant impacts on energy consumption at a regional scale. One third of the networks' energy is required for operating the subsystems of metro stations and surroundings, such as ventilation, vertical transportation and lightning. Although a relatively small percentage of energy can be saved with an optimal management of these subsystems, a large energy saving in absolute terms can be obtained. The objective of SEAM4US is to develop advanced technologies for optimal and scalable control of metro stations that will produce a 5% saving in non-traction electricity consumption in one year, which is equivalent to the electricity consumed in more than 700 households. The project's main outcomes will be the creation of systems for optimized integrated energy management, and the development of a decision support system to drive mid-term investments. SEAM4US will integrate additional energy metering and sensor-actuator networks with the existing systems (e.g. surveillance, passenger information and train scheduling), by means of middleware as abstraction layer, to acquire grounded user, environmental and scheduling data. The data set will update and enable a set of adaptive energy consumption and environmental models to proactively and optimally control the metro stations. The consortium consists of a large metro network operator, TMB; a major player in energy-efficient system management sector, COFELY; building and environmental physics and construction experts UNIVPM and UPC, respectively; R&D experts in middleware, FhG FIT and VTT; R&D experts in user and agent-based scheduling modeling, ALMENDE and UNIK; system integrator, CNET. ver más
30/09/2014
4M€

Línea de financiación: concedida

El organismo FP7 notifico la concesión del proyecto el día 2014-09-30
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
ENGIE SERVIZI SPA No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5