Innovating Works

VULKANO

Financiado
Novel integrated refurbishment solution as a key path towards creating eco effic...
Novel integrated refurbishment solution as a key path towards creating eco efficient and competitive furnaces The main goal of VULKANO is the retrofitting of two types of industrial furnaces, namely preheating and melting, applied on three energy–intensive sectors (steel, ceramic and aluminium) with a huge number of potential users in Eur... The main goal of VULKANO is the retrofitting of two types of industrial furnaces, namely preheating and melting, applied on three energy–intensive sectors (steel, ceramic and aluminium) with a huge number of potential users in Europe. Thus, this project aims to design, implement and validate an advanced retrofitting integrated solution to increase the energy and environmental efficiency in existing industrial furnaces fed with NG; through the combined implementation of new solutions based on high temperature phase change materials, new refractories, optimised co-firing of NG and syngas from biomass or process gas, an advanced monitoring and control system and an holistic in-house predictive tool. All together will achieve a 20% increase in the energy efficiency of furnaces. On top of that, the realistic and powerful holistic tool will also able to optimize the integration of the solution with upstream/downstream perspective, following a life cycle and cost thinking. This predictive tool will support plant operators and decision makers to select most suitable retrofitting strategy for their plants, fostering overall efficiency, increase in competitiveness and circular economy and reducing the environmental impact of the product value chain from an LCA and LCC perspective. The retrofitting solutions will be tested at TRL 7 in two real facilities in Ceramic (Spain) and Steel (Slovenia) sector, validating the replicability of such solutions in a third sector (Aluminium-Turkey). VULKANO addresses the main challenge when facing furnaces retrofitting, which is tackling the problem from an overall and cost thinking perspective, which will enable overcoming the barriers for energy efficiency improvements. A well balanced consortium formed by end-users, technology solutions providers and research organizations ensures successful achievement of objectives, which will allow a wide spreading replication strategy towards furnaces retrofitting towards modern and efficient designs ver más
31/12/2019
7M€
Duración del proyecto: 42 meses Fecha Inicio: 2016-06-30
Fecha Fin: 2019-12-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-12-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 7M€
Líder del proyecto
FUNDACION CIRCE CENTRO DE INVESTIGACION DE RE... El instituto tiene por objeto la investigación y el desarrollo tecnológico, su difusión y la promoción de la innovación en materia de energí...
Perfil tecnológico TRL 2-3 18M