Innovating Works

MUSE GRIDS

Financiado
Multi Utilities Smart Energy GRIDS MUSE GRIDS aims to demonstrate, in two weakly connected areas (a town on a top of a hill and a rural neighbourhood), a set of both technological and non-technological solutions targeting the interaction of local energy grids (elec... MUSE GRIDS aims to demonstrate, in two weakly connected areas (a town on a top of a hill and a rural neighbourhood), a set of both technological and non-technological solutions targeting the interaction of local energy grids (electricity grids, district heating and cooling networks, water networks, gas grids, electromobility etc.) to enable maximization of local energy independency through optimized management of the production via end user-driven control strategies, smart grid functionality, storage, CHP and RES integration. Two large-scale pilot projects will be implemented in two different EU regions, in urban (Osimo) and rural (Oud-Heverlee) contexts with weak connections with national grids. These pilots will test and promote the main project concepts: Smart energy system and Local Energy Community. A Smart Energy System is defined as an approach in which smart electricity, thermal, water, gas grids etc are combined with storage technologies and coordinated to identify synergies between them towards maximization of energy independency and reduction of operation costs. The purpose is to reduce energy carbon footprint while meeting energy demands and creating real and sustainable energy islands. To achieve this both physical networks (electricity, natural gas, district heating and cooling, water) and non-physical networks (mobility and citizens/communities) have to interact in order to become a Local Energy Community where inhabitants can act and exchange energy to provide reliable and cheap energy in colaboration. MUSE GRIDS will promote these two concepts not only in pilot projects but also in virtual demo-sites in India, Israel and Spain. Social and environmental aspects of smart multi-energy system transition will be investigated Osimo and Oud Heverlee citizens will be directly involved.The project involves leading EU companies and energy utilites and will be a muse of inspiration for dedicated policy redaction also providing insights to the BRIDGE initiative ver más
31/10/2022
7M€
Duración del proyecto: 47 meses Fecha Inicio: 2018-11-01
Fecha Fin: 2022-10-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2022-10-31
H2020 No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 7M€
Líder del proyecto
RINA CONSULTING SPA No se ha especificado una descripción o un objeto social para esta compañía.