Industrial Development of Water Flow Glazing Systems
Although Nearly Zero Energy Buildings will become a must for new buildings in Europe by the end of 2020 – no particular building concept exists, which would enable maximum use of daylight by a transparent glass façade and at the s... Although Nearly Zero Energy Buildings will become a must for new buildings in Europe by the end of 2020 – no particular building concept exists, which would enable maximum use of daylight by a transparent glass façade and at the same time ZEB performance. InDeWaG is introducing a new, disruptive building envelope system which has a at least 15% building cost reduction potential and could be brought to industrial ripeness. The cost reduction goal and ZEB performance will be achieved with Fluid Flow Glazing facades (FFG) and Radiant Interior Walls (RIW), while minimizing the size of HVAC and PV-installations. InDeWaG is following a dual strategy to bring costs of ZEB down: The project concentrates on industrial production of standardized building components, which can be used for multiple types of ZEB in different climate zones and on the development of a simulation tool for precise early stage planning of buildings which use these innovative glazing building envelope and interior elements. ver más
29/02/2020
5M€
Duración del proyecto: 54 meses Fecha Inicio: 2015-07-31
Fecha Fin: 2020-02-29

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2020-02-29
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 5M€
Líder del proyecto
UNIVERSITAT BAYREUTH No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5