Innovating Works
EE-02-2015
EE-02-2015: Buildings design for new highly energy performing buildings
Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply with the Energy Performance of Buildings Directive obligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimal technologies with integration of renewable energy sources on site or nearby. The drive for nearly zero-energy buildings takes place in the context of the drive for new-buildings towards zero life-cycle material impacts. Moreover, the construction of 'plus-energy' buildings - i.e. buildings producing more energy than they consume - should also be encouraged in order to reduce energy use whilst increasing the share of renewable energies. However the costs of these highly energy performing buildings still represent a barrier for investors. Therefore the construction industry needs to deliver more affordable solutions.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 04-02-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply with the Energy Performance of Buildings Directive obligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimal technologies with integration of renewable energy sources on site or nearby. The drive for nearly zero-energy buildings takes place in the context of the drive for new-buildings towards zero life-cycle material impacts. Moreover, the construction of 'plus-energy' buildings - i.e. buildings producing more energy than they consume - should also be encouraged in order to reduce energy use whilst increasing the share of renewable energies. However the costs of these highly energy performing buildings still represent a barrier for investors. Therefore the construction industry needs to deliver more affordable solutions.

Scope:Projects should focus on development and demonstration of solutions which significantly reduce the cost of new buildings with at least 'nearly zero-energy' performance levels, whilst accelerating significantly the speed with which these bu... ver más

Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply with the Energy Performance of Buildings Directive obligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimal technologies with integration of renewable energy sources on site or nearby. The drive for nearly zero-energy buildings takes place in the context of the drive for new-buildings towards zero life-cycle material impacts. Moreover, the construction of 'plus-energy' buildings - i.e. buildings producing more energy than they consume - should also be encouraged in order to reduce energy use whilst increasing the share of renewable energies. However the costs of these highly energy performing buildings still represent a barrier for investors. Therefore the construction industry needs to deliver more affordable solutions.

Scope:Projects should focus on development and demonstration of solutions which significantly reduce the cost of new buildings with at least 'nearly zero-energy' performance levels, whilst accelerating significantly the speed with which these buildings and their systems are taken up by the market. The focus should lie on solutions for appropriate indoor air quality and comfort, design adapted to local climate and site, passive solutions (reducing the need for technical building systems which consume energy) or active solutions (covering a high share of the energy demand with renewable energies), building energy management systems (where appropriate), highly efficient Heating, Ventilation and Air-Conditioning (HVAC, e.g. low temperature systems, solar cooling), electric and/or thermal energy storage of renewable energy onsite and nearby. Projects should also provide solutions for automated and cost-effective maintenance of the installed equipment, and assess differences between predicted and actual energy performance. Such differences should be documented and minimized.

The applied solutions should address the challenge to move towards a 'nearly-zero energy' buildings standard at large scale with demonstration projects that go beyond 'nearly-zero energy' buildings levels to the point where buildings are active contributors to energy production and environmental quality in particular when new districts are planned (e.g. net-zero energy neighbourhoods). The energy balance should be calculated by means of a LCA approach, considering among other issues embodied energy.

Projects should also focus on design methods for on-site and nearby-generation of renewable energy for new buildings (electricity as well as heating and cooling generation, e.g. heat pumps, integrated photovoltaics, or other options) accompanying energy efficiency measures to achieve standards higher than those of 'nearly zero-energy' buildings.

The performance of innovative technologies may be verified through technology verification schemes such as the EU Environmental Technology Verification (ETV) pilot programme[1].

The Commission considers that proposals requesting a contribution from the EU of between EUR 3 and 5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

This topic will be implemented under the PPP on Energy-efficient Buildings.

The activities are expected to be implemented at TRL 5-7 (please see part G of the General Annexes).

Expected Impact: Significant increase of the share of 'nearly zero-energy' buildings with the aim of 100% market uptake by the end of 2020. Costs reductions of at least 15% compared to current situation, with additional benefits in terms of energy reduction. Demonstration for net-zero energy districts taking advantage of onsite or nearby-generation of renewable energy.

Type of action: Innovation Actions

[1] http://iet.jrc.ec.europa.eu/etv/


Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)Y


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply with the Energy Performance of Buildings Directive obligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimal technologies with integration of renewable energy sources on site or nearby. The drive for nearly zero-energy buildings takes place in the context of the drive for new-buildings towards zero life-cycle material impacts. Moreover, the construction of 'plus-energy' buildings - i.e. buildings producing more energy than they consume - should also be encouraged in order to reduce energy use whilst increasing the share of renewable energies. However the costs of these highly energy performing buildings still represent a barrier for investors. Therefore the construction industry needs to deliver more affordable solutions. Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply with the Energy Performance of Buildings Directive obligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimal technologies with integration of renewable energy sources on site or nearby. The drive for nearly zero-energy buildings takes place in the context of the drive for new-buildings towards zero life-cycle material impacts. Moreover, the construction of 'plus-energy' buildings - i.e. buildings producing more energy than they consume - should also be encouraged in order to reduce energy use whilst increasing the share of renewable energies. However the costs of these highly energy performing buildings still represent a barrier for investors. Therefore the construction industry needs to deliver more affordable solutions.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. 
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. 
3.2 Guide to the submission and evaluation process
   
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. 
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme. 
3.2 Guide to the submission and evaluation process
   
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Buildings design for new highly energy performing buildings Scope:Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by public authorities), all new buildings should comply...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de