The Green Fast Ferry (GFF) is a full-electric, high speed passenger craft, which will be the only zero emission ferry on the market to meet performances of high speed diesel commuters: 30 knots (55 km/h) speed, large autonomy (26...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto GFF
Duración del proyecto: 23 meses
Fecha Inicio: 2016-11-10
Fecha Fin: 2018-10-31
Líder del proyecto
ECHANDIA MARINE AB
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
2M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The Green Fast Ferry (GFF) is a full-electric, high speed passenger craft, which will be the only zero emission ferry on the market to meet performances of high speed diesel commuters: 30 knots (55 km/h) speed, large autonomy (26 km routes in 30 min) and fast recharge at port < 20 min. GFF is based on a the patented technology Air Supported Vessel (ASV), that thanks to a pressurized air cushion underneath the hull, reduces energy consumption of > 40%. GFF is suitable for substitution of existing diesel commuters and introduction in sheltered waters and inland where conventional fast ferries are not allowed due to cost erosions, due to strongly reduce wake wash. GFF has a huge market potential in Emission Control Areas in EU (Baltic and North Sea).
Objective of the project is to engineer, validate and demonstrate the GFF with potential customers and prepare it for the commercialization. In particular the prototype, developed within an EC funded European project and already tested in real scale, will be demonstrated through logged endurance tests (> 500 hours of operation) to get the technical documentation and engineer the components and manufacturing. The prototype will be demonstrated to the target stakeholders under real-life conditions through a roadshow in Sweden: one existing route and two potential high speed city commuting routes subject to speed restrictions due to wake wash problems.
The operation of GFF will result in economical advantage of about 300 k€ per year to alternative diesel ferries, with a pay-back-time of 3 years, even less under financial supports. Each vessel will avoid consumption and emissions corresponding to 500 diesel cars each driving 15.000 km per year. The value chain is covered by the 3 partners, providing the key technologies and know-how, while the rest of components is purchased from the market. The overall revenues are estimated to reach 100 M€ after 5 years with a profit of 32 M€.