The Advanced Solutions for Asphalt Pavements (ASAP) project involves the development of a unique road paving technology which will use a bio-bitumen rejuvenator to rejuvenate aged asphalt bitumen. This technology will help to ext...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto ASAP
Duración del proyecto: 40 meses
Fecha Inicio: 2020-04-24
Fecha Fin: 2023-08-31
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The Advanced Solutions for Asphalt Pavements (ASAP) project involves the development of a unique road paving technology which will use a bio-bitumen rejuvenator to rejuvenate aged asphalt bitumen. This technology will help to extend the lifespan of asphalt pavements (roads) and will reduce the environmental and economic impact of roads and road maintenance processes. Recycling and self-healing processes will replace fossil fuel dependent technology. Self-healing will involve rejuvenating aged asphalt bitumen using a bio-rejuvenator developed using microalgae oils (rejuvenating bio-oil). Microalgae has been selected because of its fast growth, versatility and ability to survive within hostile environments, such as wastewater.
ASAP will utilise microalgae, cultivated within the wastewater treatment process, as a source of the rejuvenating bio-oil. The solvent (Soxhlet) processes will be used to extract the oil from the microalgae. To ensure the efficiency of the oil extraction process, an ultrasonication process will be used to pre-treat the microalgae. The suitability of rejuvenating bio-oil as a replacement for the bitumen rejuvenator (fossil fuel based) will be ascertained via a series of standard bituminous and accelerated tests. A rejuvenator-binder diffusion numerical model will be developed, based on the Delft Lattice concrete diffusion model, to determine the conditions required for rejuvenation to occur and to ascertain the healing rate of the asphalt binder. These parameters will facilitate the selection and optimisation of the asphalt self-healing systems (specifically the amount of bio-oil rejuvenator and time required) to achieve full rejuvenation.
This novel approach will benchmark the effectiveness of this intervention against existing asphalt design and maintenance processes and assess feasibility. The ASAP project presents an opportunity to revolutionise road design and maintenance processes and reduce its environmental and financial costs.