PINTA3: IP1 Traction TD1 Phase 3 and HVAC TD8 KIEPE ELECTRIC GES.M.B.H. participó en un H2020: H2020-S2RJU-2020 This proposal has been developed as the last phase of the work which will be developed within the Technical Demonstrators Traction (TD1.1) a...
2020-12-16 - 2023-05-31 | Financiado
PIVOT2: Performance Improvement for Vehicles on Track 2 KIEPE ELECTRIC GES.M.B.H. participó en un H2020: H2020-S2RJU-2019 PIVOT2 is a continuation of the PIVOT project which was scheduled to finish in September 2019. PIVOT2 will build on the work and concepts of...
2019-12-19 - 2023-06-30 | Financiado