Innovating Works

AREVA-G

Desconocido
Showing 1 to 20 of 27 results
GEMINI Plus: Research and Development in support of the GEMINI Initiative AREVA GMBH participó en un H2020 NFRP-2016-2017 GEMINI+ project proposal will be submitted to the European Commission addressing the 2016 Euratom call for proposals (deadline October 5th,...
2017-06-03 - 2021-02-28 | Financiado
TeaM Cables: European Tools and Methodologies for an efficient ageing management of nuclear power plant Cables AREVA GMBH participó en un H2020 NFRP-2016-2017 The lifetime of existing NPPs can potentially be extended to between 60 and 80 years if safety and operability of facilities can be guarante...
2017-05-19 - 2022-08-31 | Financiado
NARSIS: New Approach to Reactor Safety ImprovementS AREVA GMBH participó en un H2020 NFRP-2016-2017 Probabilistic Safety Assessment (PSA) procedures allow to better understand and estimate the likelihood of the most causes prone to initiate...
2017-05-19 - 2022-02-28 | Financiado
ATLASplus: Advanced Structural Integrity Assessment Tools for Safe Long Term Operation AREVA GMBH participó en un H2020 NFRP-2016-2017 NFRP 1: 2016-2017 notes that A number of current Generation II reactors should continue operating for a few decades and Generation III shoul...
2017-05-19 - 2021-11-30 | Financiado
MEACTOS: Mitigating Environmentally Assissted Cracking Through Optimisation of Surface Condition AREVA GMBH participó en un H2020 NFRP-2016-2017 Environmentally-Assisted cracking (EAC) is one of the major failure modes occurring in light water reactors (LWRs). The condition of surface...
2017-05-19 - 2022-02-28 | Financiado
ANNETTE: Advanced Networking for Nuclear Education and Training and Transfer of Expertise The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qual...
2015-12-17 - 2019-12-31 | Financiado
SOTERIA: Safe long term operation of light water reactors based on improved understanding of radiation effect... AREVA GMBH participó en un H2020 NFRP-2014-2015 The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) st...
2015-05-15 - 2019-08-31 | Financiado
MEACTOS: Mitigating Environmentally Assissted Cracking Through Optimisation of Surface Condition AREVA GMBH participó en un FP6 NFRP-2016-2017 Environmentally-Assisted cracking (EAC) is one of the major failure modes occurring in light water reactors (LWRs). The condition of surface...
2017-09-01 - 2022-02-28 | Financiado
NARSIS: New Approach to Reactor Safety ImprovementS AREVA GMBH participó en un FP6 NFRP-2016-2017 Probabilistic Safety Assessment (PSA) procedures allow to better understand and estimate the likelihood of the most causes prone to initiate...
2017-09-01 - 2022-02-28 | Financiado
TeaM Cables: European Tools and Methodologies for an efficient ageing management of nuclear power plant Cables AREVA GMBH participó en un FP6 NFRP-2016-2017 The lifetime of existing NPPs can potentially be extended to between 60 and 80 years if safety and operability of facilities can be guarante...
2017-09-01 - 2022-08-31 | Financiado
GEMINI Plus: Research and Development in support of the GEMINI Initiative AREVA GMBH participó en un FP6 NFRP-2016-2017 GEMINI+ project proposal will be submitted to the European Commission addressing the 2016 Euratom call for proposals (deadline October 5th,...
2017-09-01 - 2021-02-28 | Financiado
ATLASplus: Advanced Structural Integrity Assessment Tools for Safe Long Term Operation AREVA GMBH participó en un FP6 NFRP-2016-2017 NFRP 1: 2016-2017 notes that A number of current Generation II reactors should continue operating for a few decades and Generation III shoul...
2017-06-01 - 2021-11-30 | Financiado
SOTERIA: Safe long term operation of light water reactors based on improved understanding of radiation effect... AREVA GMBH participó en un FP6 NFRP-2014-2015 The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) st...
2015-09-01 - 2019-08-31 | Financiado
STYLE: Structural integrity for lifetime management non RPV components AREVA GMBH tramitó un FP7 The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of...
Financiado
EUROPAIRS: End User Requirement fOr Process heat Applications with Innovative Reactors for Sustainable energy s... AREVA GMBH tramitó un FP7 The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The signific...
Financiado
PERFORM 60: Prediction of the Effects of Radiation FOr reactor pressure vessel and in core Materials using multi... AREVA GMBH participó en un FP7 In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utili...
Financiado
NC2I-R: Nuclear Cogeneration Industrial Initiative Research and Development Coordination AREVA GMBH participó en un FP7 The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration dem...
Financiado
ENEN-III: Europen Nuclear Education Network Training Schemes The project covers the structuring, organisation, coordination and implementation of training schemes in cooperation with local, national an...
Financiado
PASSAM: Passive and Active Systems on Severe Accident source term Mitigation AREVA GMBH participó en un FP7 In case of a severe accident in a Nuclear Power Plant (NPP) fission products are released from the degraded fuel and might reach the environ...
Financiado
NUGENIA-PLUS: Preparing NUGENIA for HORIZON2020 AREVA GMBH participó en un FP7 Preparing NUGENIA for HORIZON 2020 The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and...
Financiado
* Datos extraídos de la documentos o webs disponibles en diferentes organismos públicos.